Article View: aus.rail.models
Article #588Re: Is this the steepest adhesion worked (model) railway in the world?
From: David Bennetts
Date: Wed, 26 Apr 2000 00:00
Date: Wed, 26 Apr 2000 00:00
71 lines
3530 bytes
3530 bytes
This is a multi-part message in MIME format. ------=_NextPart_000_0085_01BFAF65.353E5B60 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable Can't speak for model railways, but the Roaring Camp and Big Trees = Railroad, Felton, California which uses steam ex-logging locos claims a = grade of 1 in 12. Having ridden on it in 1997, it is certainly steep. = Tramways, and electric railways using single vehicles can also be quite = steep. The steepest in Australia (ignoring the Balmain wharf line which = used counterweight assistance) was the line to Neutral Bay wharf, which = had a ruling grade of 1 in 8.5. This required trams to be equipped with = special braking systems, at first they used mechanical track bracks, = then a corridor car with dynamic brakes was employed for the final years = of the line. I'm sure that there are electrically worked Swiss mountain = lines and perhaps the Chamonix line (France), using single coaches, = which are steeper than 1 in 12 using adhesion. Regards David Bennetts Canberra ------=_NextPart_000_0085_01BFAF65.353E5B60 Content-Type: text/html; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable <!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN"> <HTML><HEAD> <META content=3D"text/html; charset=3Diso-8859-1" = http-equiv=3DContent-Type> <META content=3D"MSHTML 5.00.2614.3500" name=3DGENERATOR> <STYLE></STYLE> </HEAD> <BODY bgColor=3D#ffffff> <DIV> </DIV> <DIV><FONT size=3D2></FONT> </DIV> <DIV><FONT size=3D2>Can't speak for model railways, but the Roaring Camp = and Big=20 Trees Railroad, Felton, California which uses steam ex-logging locos = claims a=20 grade of 1 in 12. Having ridden on it in 1997, it is certainly=20 steep. Tramways, and electric railways using single vehicles can = also be=20 quite steep. The steepest in Australia (ignoring the Balmain wharf = line=20 which used counterweight assistance) was the line to Neutral Bay wharf, = which=20 had a ruling grade of 1 in 8.5. This required trams to be equipped = with=20 special braking systems, at first they used mechanical track bracks, = then a=20 corridor car with dynamic brakes was employed for the final years of the = line. I'm sure that there are electrically worked Swiss mountain = lines and=20 perhaps the Chamonix line (France), using single coaches, which are = steeper than=20 1 in 12 using adhesion.</FONT></DIV> <DIV> </DIV> <DIV><FONT size=3D2>Regards</FONT></DIV> <DIV> </DIV> <DIV><FONT size=3D2>David Bennetts</FONT></DIV> <DIV><FONT size=3D2>Canberra</FONT></DIV></BODY></HTML> ------=_NextPart_000_0085_01BFAF65.353E5B60--
Technical Details
Message-ID:
<39062f56@newshost.pcug.org.au>Path:
arc1-ca.pugleaf.net!unknown!not-for-mailReferences:
<39050CB6.CA4D7DB8@cia.com.au>Show Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: ff544,d3ff56f17a5768e4 X-Google-Attributes: gidff544,public X-Google-Thread: 11469f,d3ff56f17a5768e4 X-Google-Attributes: gid11469f,public From: "David Bennetts" <davibenn@pcug.org.au> Subject: Re: Is this the steepest adhesion worked (model) railway in the world? Date: 2000/04/26 Message-ID: <39062f56@newshost.pcug.org.au> X-Deja-AN: 615686059 References: <39050CB6.CA4D7DB8@cia.com.au> X-Priority: 3 Content-Type: multipart/alternative; boundary="----=_NextPart_000_0085_01BFAF65.353E5B60" X-MimeOLE: Produced By Microsoft MimeOLE V5.00.2615.200 X-Trace: 26 Apr 2000 09:50:46 +1000, ts104.pcug.org.au X-MSMail-Priority: Normal MIME-Version: 1.0 Newsgroups: aus.rail.models,aus.rail