Article View: bc.cycling
Article #10347Re: Lion's Gate Replacement
From: Doug Chinnery
Date: Wed, 08 Nov 1995 00:00
Date: Wed, 08 Nov 1995 00:00
13 lines
1189 bytes
1189 bytes
In article <1995Nov7.012924.1507@instep.bc.ca>, <brad@instep.bc.ca> wrote: >Don't let the government fool us into thinking that a tunnel is a logical >alternative since the Lion's Gate will become the cycling/pedestrian >crossing. Future governments will not justify the up-keep of an old bridge >(painting, welding, etc) for the sake of this small percentage of users. Ya gotta figure that upkeep on the bridge would be minimal if there was only bikes, peds, and skaters on it. It would be a really unpopular decision to tear it down, to boot. -- Doug Chinnery doug@zadall.com dtc@wimsey.com "Sure I'll have another drink with you, though I'm already drunk as a bottle" - The Jesus Lizard
Technical Details
Message-ID:
<DHp92A.6L1@zadall.com>Path:
arc1-ca.pugleaf.net!unknown!not-for-mailReferences:
<1995Nov7.012924.1507@instep.bc.ca>Show Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: fe616,ca8dd7457d88120c X-Google-Attributes: gidfe616,public From: doug@zadall.com (Doug Chinnery) Subject: Re: Lion's Gate Replacement Date: 1995/11/08 Message-ID: <DHp92A.6L1@zadall.com> X-Deja-AN: 118847546 sender: news@zadall.com (The news programs owner) references: <1995Nov7.012924.1507@instep.bc.ca> organization: Zadall Systems Group, Inc., Burnaby BC, Canada newsgroups: bc.cycling