Article View: bc.cycling
Article #10368VBC/C-BC Advocacy Committee Journal
From: Jason Harrison
Date: Fri, 10 Nov 1995 00:00
Date: Fri, 10 Nov 1995 00:00
210 lines
10583 bytes
10583 bytes
richard@mindlink.bc.ca (Richard Hennick) writes: >I still think it would be a simple matter to post the plain ASCII text of >the minutes to the newsgroup, so I can read them as plain text Well I don't know if these are the minutes, but here is the latest entry on the website: http://www.iceonline.com/home/roberb7/WWW/advoca11.html VBC Advocacy Journal Published by the Vancouver Bicycle Club Advocacy Committee - November 1995 Advocacy Committee Meeting Wednesday, November 8, at 6:30 p.m. in Room 104 of the Sport BC Building (1367 West Broadway). The current membership of the Advocacy Committee is: Bob Broughton roberb7@iceonline.com Colin Brander colin_brander@mindlink.bc.ca Helen Warn helen_warn@mindlink.bc.ca Roy Smyth roy_smyth@mindlink.bc.ca Barry Bogart barry_bogart@mindlink.bc.ca This issue was edited by Bob Broughton. Pitt River Bridge Project In order to make travel more convenient for ever-increasing numbers of single-occupancy commuting motorists, the BC Ministry of Transportation and Highways (MoTH) intends to implement a counterflow scheme on the Pitt River Bridge which will provide three westbound lanes in the morning and three eastbound lanes in the evening. This counterflow project will make cycling in both directions more intimidating and potentially dangerous at all times, including weekends when it is a popular route for recreational and sport cyclists. This bridge is the only way to and from Vancouver on the north side of the Fraser; there is no alternate route, so it is of crucial importance for cyclists. Under the counterflow scheme, plastic pickets will be permanently installed between the two lanes on each bridge structure, preventing motorists from changing lanes and encouraging them to drive in the space which is currently usable by cyclists. The eastbound curb lane is already too narrow for comfortable cycling, so after the counterflow project goes in, cyclists will have to take the centre of the lane until they are across the full width of the bridge. This will cause considerably more delay and frustration to eastbound motorists than at present, especially on weekday mornings when only the one eastbound lane is available. Westbound cyclists on the bridge will also find themselves being passed with much less clearance than before. Those who want to turn left onto the Mary Hill Bypass will face an additional danger. The plastic pickets are sturdy enough that a cyclist who hits one will be likely to fall in the middle of the roadway. So cyclists will not be able to choose the safest time to smoothly change lanes, as they can at present. Instead, they will have to manoeuvre between the pickets, or wait until the very last moment and then cut sharply across both of the through lanes, or stop at the intersection and jaywalk. MoTH's Proposal for Accommodating Cyclists Eastbound cyclists who choose not to use the roadway would turn right before reaching the Wild Duck Inn, and follow a new pathway south to Holland Avenue. From there they would ride around the back of the Inn on existing local roads, to reach a new paved path along the top of the Pitt River dike. Then, having already ridden three sides of a square, cyclists would ride under both spans of the bridge, and around a very steep uphill 270-degree turn to the sidewalk on the north span, where they may have to stop and dismount. The sidewalk is just 1.5 metres wide, except where projecting concrete pedestals reduce it to 1.2 metres. For comparison, MoTH's own design standards for a bike path on a structure specify a minimum width of 2.0 metres for one-way paths, and 3.0 metres for two-way paths. The handrail on the river side is 1.1 metres high, well below the MoTH standard of 1.4 metres and below a mounted cyclist's centre of gravity. Because this sidewalk is so narrow, cyclists may be required to walk the full length of the bridge structure (about 400 metres). Even if they ride, they may have to stop if there is a pedestrian or cyclist coming in the opposite direction. From the east side of the bridge, a new two-way bike path would take cyclists to the intersection with Old Dewdney Trunk Road, which is being relocated to about 1 km. east of the bridge. Eastbound cyclists on Highway 7 will then have to stop and perhaps dismount yet again, press the pedestrian crosswalk button, and wait to cross back to the right side of the highway. Because of the long wait for the lights to change at this intersection, it is likely that some cyclists would instead ride straight along the shoulder of the highway, eastbound on the wrong side of the road, where they will pose a hazard to legal westbound cyclists. Other cyclists heading east on Old Dewdney Trunk Road will also be tempted to ignore the lights and bear left at the intersection, again riding on the shoulder on the wrong side of the road. These are typical and predictable problems associated with two-way bike paths at intersections. Westbound cyclists who choose to follow the MoTH route along the dike to the Mary Hill Bypass will find that at the end of Holland Avenue they are expected to stop and dismount, and cross six lanes of heavy traffic on the Bypass in an uncontrolled crosswalk. Once again, because of the possible long wait to cross here, it is likely that some cyclists would instead ride south along the northbound shoulder of the Bypass to get to the lights at Kingsway Avenue, thus endangering legal northbound cyclists. Further Problems The MoTH plan presents still another risk to the personal safety of cyclists. On the Port Coquitlam side the proposed route uses dead-end streets through an industrial area, and passes underneath the bridge structures where visibility is limited and there is no access at all other than by the trail itself. Solitary cyclists (especially women) using this route will be vulnerable to physical harassment or assault. Maintenance issues are another cause for concern. At present, the sidewalk on the north span is consistently strewn with large quantities of broken glass, and there is no reason to believe that it will be better maintained in future.. How does this project stack up against MoTH's Interim Cycling Policy? MoTH believes that this circuitous off-road route fulfills their obligation to accommodate cyclists "on all new or upgraded highways" (Interim Cycling Policy, December 1992). Their excuse for directing cyclists in both directions onto the dangerously inadequate sidewalk on the north span is that the counterflow project does not involve any structural changes to the bridge itself, and so they are not obliged to follow any of the standards which would apply to new construction. The Minister has stated that this project was developed "with the needs of cyclists in mind", and the Project Manager claims that the scheme "provides a cost effective alternate for the majority of users." But it now appears that at the time those statements were made, the Ministry did not know how many cyclists were using the existing bridge, what kind of cyclists they were, or where those cyclists were coming from or going to. Therefore, they could not possibly have known the cyclists' needs or how to meet them. Cyclists will almost certainly continue to ride on the roadway on the bridge, even when the Counterflow Project has made it more difficult and dangerous for them to do so. Cyclists are just as interested as other commuters in reaching their destination in the shortest possible time, and because they are human-powered they especially wish to minimize the number of stops. They will not consider taking a slow and circuitous off-road route, especially one which repeatedly requires them to stop and act as pedestrians. So what would meet the needs of cyclists? Some major improvements could be made at the Pitt River Bridge which would benefit cyclists and pedestrians too. The first improvement would be a sidewalk/bike path (one way for cyclists) added to the outside of the south bridge structure, so that eastbound cyclists have a simple, safe and direct way to cross the bridge without conflict with other traffic. (MoTH claim that they investigated adding a path to the outside of the south structure, and decided that the estimated cost of up to $800,000 was excessive for the number of expected users. This represents just 7 percent of the total project budget of $12 million, and as noted above, MoTH made that decision before they had counted the cyclists using the bridge.) The existing sidewalk on the north span could be upgraded by adding a new handrail of a safe height, which would be fastened to the outside edge of the bridge rather than to the deck, thus increasing the useable width of the sidewalk and making it more acceptable as a one-way bike path for those cyclists who choose to use it instead of the roadway. The other significant improvement would be a crosswalk with a push-button-controlled signal on the west side of the Lougheed Highway/Mary Hill Bypass intersection, eliminating both the long detour and the potential for delays at the Holland Avenue intersection. This signal would be synchronized with the existing traffic lights, so the only Highway traffic affected would be the two westbound lanes, which currently face a permanent green arrow. The reason given for not installing this light is that there would be so many cyclists using it that it would cause excessive delay to the westbound traffic. So, when the Ministry needs arbitrary excuses for its failure to accommodate cyclists, first they claim that there are not enough cyclists, and then they claim that there are too many! Richard Hennick -- ------------------------------------------------------------------------------- J. Harrison@cs.ubc.ca http://www.cs.ubc.ca/spider/harrison Graduate Motto: Free-time with guilt. ftp://ftp.cs.ubc.ca/pub/local/quotes
Technical Details
Message-ID:
<480673$rmg@cascade.cs.ubc.ca>Path:
arc1-ca.pugleaf.net!unknown!not-for-mailReferences:
<80165-815985354@mindlink.bc.ca>Show Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: fe616,ec687d4ba668495a,start X-Google-Attributes: gidfe616,public From: harrison@cs.ubc.ca (Jason Harrison) Subject: VBC/C-BC Advocacy Committee Journal Date: 1995/11/10 Message-ID: <480673$rmg@cascade.cs.ubc.ca> X-Deja-AN: 119065555 references: <80165-815985354@mindlink.bc.ca> organization: Computer Science, University of B.C., Vancouver, B.C., Canada newsgroups: bc.cycling