Article View: bit.listserv.quality
Article #290Re: Help with Quality Problem
From: RNav
Date: Thu, 04 Sep 1997 00:00
Date: Thu, 04 Sep 1997 00:00
123 lines
5686 bytes
5686 bytes
In a message dated 9/3/97 10:39:06, you wrote: <<Hi, I have a situation that I need some help with. I have a specification that is 2.870-2.872 on an inlay that mates with the handle. Parts normally run 2.870-2.874. Supplier is not capable of improving part. Mating parts (handle) specification is 2.875 +-.002 Problem: Supplier cannot improve process for Inlay. Supplier on Handle cannot improve process. Eng is unwilling to change prints in case parts start coming in to a different part of the specification range. WE are writing up each shipment as a deviation to the inlay supplier. Both sides of each spec need to be maintained to prevent spec crossover or gaps between the two parts. Any suggestions? Jeff Hubbard Quality Engineer Mailto:Jeffh@buckknives.com WEb: www.Buckknives.com >> My understanding of the problem is this: Two mating parts with tolerances; 2.870-2.872 & 2.875 +-.002 Min design clearance is .001 Actual data indicates a range of 2.870-2.874 for the first part. No available data on second part in the posting. Problem: There is an interference in the parts do to lack of process capability. Organizational issues: Supplier cannot improve process for Inlay. Supplier on Handle cannot improve process. Eng is unwilling to change prints in case parts start coming in to a different part of the specification range. WE are writing up each shipment as a deviation to the inlay supplier. Suggestions: ( Opinions based on my experience and the limited information given, my biases may be many.) First: Either measure yourself, or ask the vendors for statistical data on the characteristic(s) in question. Specifically, I'd ask for capability data, short term and long term. (short term: within a production run if quantities are large, over 1000/Long term: 1-3 months worth of production). I'd be interested in determining if they have a short term or long term capability issue. I'm assuming that there is an issue with both suppliers (implied not directly commented on). A short term problem maybe harder to fix (probably machine related). Long term problems may be set-up or material related. Angles to pursue for improvement, set-up variation reduction (gage R&R, set-up verification, work instructions), material variation ( tighter specs, sample runs with process adjustments to account for material variation). Don't ask for just a raw Cpk number, but for the indices and the raw data time and date stamped. What I'd look for is good short term capability but lot to lot variation. Gauge R&R has been noted as being the root of many product quality issues. Some 6 sigma companies have found this to be true with their supplier base. If the supplier's measurement system is questionable, they may not know they really have a problem, and it will likely show up as lot to lot variation. Personal experience has shown me to look at the measurement system (gauge R&R, and customer-supplier measurement systems) first. One product line I'm responsible for had a long history of problems. Reviewing the measurement sy stem showed R&R problems. Revising that then highlighted the process problems that were the root of the historical issues. The new measurement system showed us how to change processing methods (more material handling and sample processing) than machine issues. Cpk's went from .9-1.1 to 1.9-3.0. Second: Investigate their process and their process controls. Is there significant room for improvement that would bare on this issue. Are there control plans, SPC used, etc. Third: Assuming that the vendors are giving you the best they can, what do you do? The next best solution is do you really need all that tolerance. Your planned for tolerance range is .001 to .007. Would it hurt to move the better controlled process to a new nominal that provides the proper clearance based on process capability? The design engineers need to answer that. However, you can help by providing the process capabilities of the two parts, current scrap/rework/yield costs, yours and the suppliers). It is not uncommon for designers to over tolerance parts to "Ensure Quality". They will need good data on the process and costs for justifing a print change and determine a valid tolerance band. Fourth: Are there any other vendors with better capabilities? Pursue this if you need the current tolerances, and the current vendors can not provide acceptable product. If there are no better vendors, go back to engineering with purchasing and layout the problem at their door with a report stating that the design is not manufacturable. The part/system may have to be redesigned. Fifth: 100% sort to yield acceptable product. This provides more data to drive you back to 4. These are my thoughts. I'm looking forward to any others. Robert Drensek, CQE, CQA Quality Engineer RNAV@AOL.COM
Technical Details
Message-ID:
<970903220337_183995609@emout10.mail.aol.com>Path:
arc1-ca.pugleaf.net!unknown!not-for-mailShow Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: 1159be,9ac6426f1ed2d0ec X-Google-Attributes: gid1159be,public From: RNav@aol.com Subject: Re: Help with Quality Problem Date: 1997/09/04 Message-ID: <970903220337_183995609@emout10.mail.aol.com> X-Deja-AN: 270028950 Sender: TQM in Manufacturing and Service Industries Discussion List <QUALITY%PUCC.BITNET@vtbit.cc.vt.edu> Comments: ******************************************************** X-Received: (from root@localhost) by emout27.mail.aol.com (8.7.6/8.7.3/AOL-2.0.0) id WAA05271; Wed, 3 Sep 1997 22:43:18 -0400 (EDT) Approved-By: "Bill Casti, CQA (System Administrator)" <help@QUALITY.ORG> Newsgroups: bit.listserv.quality