Thread View: borland.public.vdbase.forms
2 messages
2 total messages
Started by Jon Paul Jones
Wed, 24 Mar 1999 00:00
Giving up time slices in VDB 7
Author: Jon Paul Jones
Date: Wed, 24 Mar 1999 00:00
Date: Wed, 24 Mar 1999 00:00
8 lines
931 bytes
931 bytes
Is there any way in Visual Dbase to do something like a DoEvents as you can in Visual Basic? I have alot of problems with Visual Dbase running a lengthy procedure and not allowing the for to refresh, basically locking the form up. I want to be able to have the form refresh and give time back to the operating system. Any ideas? Thanx, Jon Jones...
Re: Giving up time slices in VDB 7
Author: Geoff S. Wass ( dBVIPS )
Date: Thu, 25 Mar 1999 00:00
Date: Thu, 25 Mar 1999 00:00
13 lines
1010 bytes
1010 bytes
Jon, Try posting your question in the new dBASE news groups. These are winding down. The server is shown below. -- Geoff Wass ( dBVIPS ) Kuala Lumpur, Malaysia =>=> More dBASE info at http://members.theglobe.com/Geoff_Wass <=<= *>*> Visit the NEW! dBASE Inc. news groups on the news server news://news.dbase2000.com <*<*
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads