Article View: ca.environment
Article #7030SCONOx Catalyst results
From: Sunlawbob
Date: Mon, 29 May 1995 00:00
Date: Mon, 29 May 1995 00:00
20 lines
1747 bytes
1747 bytes
The first full-scale commercial SCONOx installation was completed mid-May at the Sunlaw Cogeneration Partners I facility in Vernon, CA. The facility is a GE LM2500 combined cycle plant. Original Plant design capacity was 26.2 Mw (21.5 from the gas turbine, balance from steam turbine). With 25 GPM of water the Plant produces up to 25 Mw from the gas turbine and upwards of 6 MW from the steam turbine. NOx goes from normal 44 ppm to 25 ppm and CO goes from 8 to 12 ppm with this added hot water injection. All flue gas is then run through a SCONOx catalyst operating at approximately 280 degrees which reduces NOx to 6 ppm and CO to 2 ppm. The SCONOx catalyst uses no ammonia. Since the injected water is above 300 F, heat rate (electrical efficiency) improves as it does with steam injection, and increased output is around 20%. Steam production also increases slightly as opposed to being reducerd when steam injection is used for NOx control and power enhancement. The Plant has operated with heated injection water for 3 years, with 2 years prior to that of massively increased water injection using cold water, and 2 years prior to that of normal water injection. Combustor life is currently 2 years 2 months and counting. The combustor looks great on inspection.
Technical Details
Message-ID:
<3qbhpb$5ln@newsbf02.news.aol.com>Path:
arc1-ca.pugleaf.net!unknown!not-for-mailShow Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: 10df74,1133de3edb8bd947,start X-Google-Attributes: gid10df74,public From: sunlawbob@aol.com (Sunlawbob) Subject: SCONOx Catalyst results Date: 1995/05/29 Message-ID: <3qbhpb$5ln@newsbf02.news.aol.com> X-Deja-AN: 103427696 sender: root@newsbf02.news.aol.com organization: America Online, Inc. (1-800-827-6364) reply-to: sunlawbob@aol.com (Sunlawbob) newsgroups: ca.environment