Greetings,
For those of you outside the Santa Barbara Area,
the following concerns a new oil well project
proposed by Mobil Corporation. A large new onshore
(25,000 barrels of oil/day) oil well complex and
processing facility is proposed *on the UCSB campus*.
Please contact us if you desire more information.
With Best Regards,
Not Clearview
notclear@truth.physics.ucsb.edu
*********************************************************************
What is the Clearview project?
---------------------------------------------------------------------
The Clearview project has been proposed by
the Mobil Corporation, and would consist of:
a) 60 new oil wells and a chemical processing
facility on the UCSB North Campus, about 5/8
of a mile west of the intersection of Storke
and Colegio Roads in Goleta. A 175-foot tall
drill rig would go on this site.
b)an expanded chemical processing facility on
a site near the intersection of Hollister and
101 in Ellwood, just west of the Sandpiper
Golf Course
c)A new oil pipeline, 26 miles long, from the
chemical processing facility near Sandpiper
to Carpinteria.
Mobil filed an application on 9 Feb 1995 with
Santa Barbara County to begin construction on
the project. Various reviews, including an
Environmental Impact Report (EIR), are expected to
take about 1 1/2 years. Many agencies, including
the County, the Coastal Commission, and the UC
Regents, must grant approval. If approval is granted,
construction could start in 1997, and the facilities
would operate until 2030.
Two UCSB committees, one commissioned by the
Chancellor, another by the Faculty through the
Academic Senate, have studied the project between
September 1993 and the present. Both committees
included UCSB experts from technical disciplines
as well as nearby residents, and both met with,
and were given extensive information by Mobil.
Both committees concluded that the Clearview project
was incompatible with the plans that UCSB has for the
North Campus, and recognized serious conflicts with
other existing Campus facilities (Faculty and Student
housing, Children's Center.) The results of the committees'
work are in two written reports, totaling 284 pages.
*********************************************************************
8 Points to Consider about Clearview
---------------------------------------------------------------------
1. Clearview would place a major oil-drilling
project and industrial chemical processing plant
near tranquil Sands Beach, west of Coal Oil Point,
which is now mainly used for recreation.
The chemical processing would be less than
1/2 mile from residential neighborhoods and the
Devereux School, and a little over 1/2 mile from
from the University Child Care Center, the Isla
Vista School, UCSB Faculty and Student Housing,
and the Francisco Torres Dormitories. It would
be 500 feet from planned Faculty and Staff Housing
on North Campus. It would be immediately adjacent to
UCSB's Devereux Slough Nature Reserve.
2. Mobil Corporation has a disturbing safety
record in its Southern California operations,
particularly at its Torrance Refinery.
There have been repeated explosions and fires with
multiple deaths at this facility. In 1989
the Magruder Middle School in Torrance, which
borders the Mobil refinery, was flooded with
hydrogen sulfide gas, leading to numerous
serious injuries. Large amounts of gas containing
high levels of lethal hydrogen sulfide will be
processed at the Clearview site.
3. Mobil states that the Clearview project
would remove the offshore oil platform named
Holly, which currently operates 2 miles off
Coal Oil Point. However, 4 offshore platforms
similar to Holly are now being removed from
the waters off Carpinteria and Summerland,
and no new onshore facility is replacing them.
Holly is on its last legs, and survives
economically through a million dollar a year
subsidy from the State of California, provided
by a reduction in oil royalties. Holly would
most likely be removed without this subsidy,
or without Clearview.
4. Mobil states that the Clearview project
would end the last barging of oil in the
Santa Barbara Channel. However, if Platform
Holly were allowed to die its natural death,
barging would also end.
5. The Clearview project would violate virtually
every existing land use and oil development
policy in the county. Approval of Clearview
would open the door for the installation of
similar plants between Summerland and Goleta,
for example, on More Mesa, next to Arroyo
Beach, and next to the Santa Barbara Zoo.
6. Mobil states that the Clearview project
would bring about 200 new jobs: most of those
are in construction, and only 80 are permanent.
All the jobs are paid for by taxpayers through
another reduction in oil royalties, totaling
$900 million dollars, that the State of
California has offered to Mobil Oil for
undertaking this project.
7. The Clearview site near Coal Oil Point is
allowed to emit unlimited air pollution for
up to 200 hours a year; the operation of the
`flare' at this site would emit 700 pounds/hour
of Sulfur Oxides and 360 pounds/hour of Carbon
Monoxide into the atmosphere. This site would
also be brightly lit 24 hours a day, and from
nearby locations could constantly sound 10
times louder than the airplanes that take off
from the Santa Barbara Airport.
8. Should the Clearview project adversely
impact UCSB, the net economic consequences could be
negative for our region. The contributions of
UCSB to our local economy amount to at least $500
million each year. The economic contribution of
just the research moneys brought in by the faculty
who would live in UCSB's planned housing on the
North Campus would be about the same as those
from the Clearview project.
*********************************************************************
Some Statistics to Consider:
---------------------------------------------------------------------
Rank of UCSB among employers
in Santa Barbara County: 1
Approximate number of people
employed by UCSB : 8,000
Approximate number of people
employed by the oil and gas
industry in the entire county : 1,000
Approximate number of jobs
created by Clearview : 200
Approximate number of people hired by
local businesses to supply goods and
services to UCSB and its employees: 5,000
Approximate number of additional
people hired by local businesses
to supply goods and services
to UCSB students : 2,000-3,000
Percentage of UCSB's $270 million
annual budget spent in
Santa Barbara County : 80
Number of people who attend plays,
performances, and other cultural
events at UCSB annually : 150,000
Percentage of all fare-paying MTD
passengers who are UCSB students : 10
Amount of Metropolitan Transit
District fares paid annually
by UCSB students : $200,000
What can you do?
The Clearview proposal must be approved by the County
Board of Supervisors:
District 1 Naomi Schwartz 568-2186 (FAX 568-2534)
District 2 Jeanne Graffy 568-2191 (FAX 568-2283)
EMAIL: jgraffy@aol.com
District 3 Bill Wallace 568-2192 (FAX 568-2283)
District 4 Tim Staffel 737-7700 (FAX 737-7703)
District 5 Tom Urbanske 346-8400 (FAX 346-8404)
Address - 105 East Anapamu St.
Santa Barbara, CA 93101-2000
The opinion of the public and local politicians are influenced by letters
to the Editor of the News Press:
FAX: 966-6258
Email: SBNPEDIT@AOL.COM
Address: Letters to the Editor
Santa Barbara News Press
PO Box 1359
Santa Barbara, CA 93102-1359
Phone: 564-5161 (John Lankford -- Editorial Page Editor)
Others who can strongly influence the Clearview proposal:
Assemblyman Brooks Firestone
State Capitol Building
Sacramento, CA 95814-4906
Phone: Local - (805)-965-1994
Sacramento - (916)-445-8292
FAX: Local - (805)-965-2046
Sacramento - (916)-327-3518
Email: Brooks.a.Firestone@Assembly.ca.gov
The State Lands Commission
The California Coastal Commission
The University of California Board of Regents
Let them hear your voice!
---------------------------------------------------------------------
*********************************************************************
-----------------------------------------------------------
Content in this document does not represent
a sanctioned view of any organization or entity
within the University of California, or of the
University of California.
Technical Details
Message-ID:
<3kflj3$kat@yuggoth.ucsb.edu>Path:
arc1-ca.pugleaf.net!bga.com!news.sprintlink.net!howland.reston.ans.net!agate!library.ucla.edu!ucsbuxb.ucsb.edu!nntp.ucsb.edu!truth.physics.ucsb.edu!notclearShow Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: 10df74,292a2d3f62788d5e,start X-Google-Attributes: gid10df74,public X-Google-ArrivalTime: 1995-03-18 15:08:32 PST Path: arc1-ca.pugleaf.net!bga.com!news.sprintlink.net!howland.reston.ans.net!agate!library.ucla.edu!ucsbuxb.ucsb.edu!nntp.ucsb.edu!truth.physics.ucsb.edu!notclear From: notclear@truth.physics.ucsb.edu (Not Clearview) Newsgroups: ca.environment Subject: Clearview - General Information Date: 18 Mar 1995 22:07:31 GMT Organization: Not Clearview Lines: 241 Distribution: world Message-ID: <3kflj3$kat@yuggoth.ucsb.edu> Reply-To: notclear@truth.physics.ucsb.edu (Not Clearview) NNTP-Posting-Host: truth.physics.ucsb.edu Keywords: Oil, Clearview, UCSB, Mobil, South Ellwood, Santa Barbara