🚀 go-pugleaf

RetroBBS NetNews Server

Inspired by RockSolid Light RIP Retro Guy

1 total messages Started by "Imaging Club" Fri, 18 Dec 1992 18:11
The New Wang's BPM Re-engineering Recruits Get Trained in Brussels
#541
Author: "Imaging Club"
Date: Fri, 18 Dec 1992 18:11
28 lines
1828 bytes
To re-focus the new Wang's Business Process Management (BPM) re-
engineering consultants on Wang's new TQM-driven re-engineering
strategy, the Wang BPM Resource Center in Brussels recently conducted
formal Wang corporate BPM "Boot Camp" training sessions for Wang
Europe subsidiaries.

Guy Vanhomwegen, center director, said, "Our regional practice
managers said they needed more BPM consultants."

Twenty-seven people were trained during this particular session.
They came from Belgium, the Netherlands, the UK, Italy, Australia,
and the Wang US BPM Resource Center.  The US and Australian
representatives attended to become familiar with the Brussels courseware,
which they will teach at their home sites.  Wang Brussels developed the
courseware and course format.

Guy explained that the five phases of Wang BPM are: define the customer's
goals and identify business processes that could be improved; analyze
and quantify a selected business process; redesign the business
process; implement the new process, and lastly, measure the results
to see if they meet the goals established in Phase 1.

For BPM re-engineering technical reports or research studies in Europe,
you can Email Guy at Guy.Vanhomwegen@OFFICE.Wang.com or telephone him at
(32) 2 727 21 11.  Alternatively, you could phone (same number) or Email
Martin.De.Rover@OFFICE.Wang.com

Michael.Willett@OFFICE.Wang.com
Thread Navigation

This is a paginated view of messages in the thread with full content displayed inline.

Messages are displayed in chronological order, with the original post highlighted in green.

Use pagination controls to navigate through all messages in large threads.

Back to All Threads