🚀 go-pugleaf

RetroBBS NetNews Server

Inspired by RockSolid Light RIP Retro Guy

Article View: comp.lang.postscript
Article #4434

Behaviour of pathbbox in Level 2

#4434
From: Jim Graham
Date: Fri, 11 Jan 1991 03:32
28 lines
1489 bytes
In section A.3 of the new PS Lang. Ref. Manual, it says:

	"In Level 1 implementations, the pathbbox operator computes
	 a bounding box that encloses all points in the current path.
	 In Level 2, if the path ends with a moveto, the trailing
	 endpoint is not included in the computation."

I am wondering why this change was made and how extensive it is.
In particular:

	1) What if there are several trailing movetos, are any of
	   them included in the computation?

	2) What if there are leading movetos, would any of them
	   be included in the computation?

	3) What if there are multiple adjacent embedded movetos,
	   are any of those included?

If the answer is that only the single last trailing moveto is
ignored, then I wonder why that point is treated differently.  If
the answer is that none of the above described points are included
in the bbox, then the documentation needs to be clarified on this
matter.

Anyone at Adobe care to comment?

					...jim
Technical Details
Message-ID: <5706@exodus.Eng.Sun.COM>
Path: arc1-ca.pugleaf.net!utzoo!utgpu!news-server.csri.toronto.edu!bonnie.concordia.ca!thunder.mcrcim.mcgill.edu!snorkelwacker.mit.edu!apple!sun-barr!newstop!exodus!bendenweyr!flar

Show Full Headers
Complete Article Headers
Path: arc1-ca.pugleaf.net!utzoo!utgpu!news-server.csri.toronto.edu!bonnie.concordia.ca!thunder.mcrcim.mcgill.edu!snorkelwacker.mit.edu!apple!sun-barr!newstop!exodus!bendenweyr!flar
From: flar@bendenweyr.Eng.Sun.COM (Jim Graham)
Newsgroups: comp.lang.postscript
Subject: Behaviour of pathbbox in Level 2
Message-ID: <5706@exodus.Eng.Sun.COM>
Date: 11 Jan 91 03:32:48 GMT
Sender: news@exodus.Eng.Sun.COM
Reply-To: flar@bendenweyr.Eng.Sun.COM (Jim Graham)
Organization: Sun Microsystems, Inc.
Lines: 28