Hi all,
The following is a status update on the Pele Rover Mission. The Pele
lunar rover mission concept is a proposal developed by a joint team of
the University of Hawaii, NASA Ames Research Center, NASA Johnson
Space Center, McDonnell Douglas Aerospace, the Lavochkin Association,
and Brown University. The mission concept proposes to explore issues
in lunar science and planetary volcanism that were left unanswered by
Apollo. The Pele team is currently conducting field trials with a
Marsokhod rover in the Kilauea Volcano, Hawaii. A major focus of these
tests is to evaluate the use of advanced teleoperations methods (e.g.,
virtual environment based control, high-fidelity stereo video based
telepresence) for operating the rover from geographically distributed
remote control stations.
------------------------------------------------------------------------------
Pele Mission Status Report
Hawaii Volcano Observatory -- Kilauea, Hawaii
05-Feb-1995
This past weekend saw the successful accomplishment of two critical
technical milestones that needed to be accomplished prior to shipping
the rover to Kilauea. Specifically, from Ames, Butler Hine was able to
operate the Marsokhod, which was located in McDonnell Douglas'
Robotics Lab in Huntington Beach, using Ames' SGI-based Virtual
Environment Vehicle Interface (VEVI) software. He retrieved images
from the sterescopic cameras mounted on the mast and commanded the
rover to traverse out of the lab, into a corridor, around several
doors and then outside (several images of this test will be available
on the Ames and MDA home pages in the next day or two).
Simultaneously, Karl Pfitzer employed the PIN site control software
that has been under development for the JASON phase of field
operations. He was able to make several adjusments involving the
capture of image and state vector data that was broadcast over the
network and subsequently also drove the rover.
These tests demonstrated that the core elements for the upcoming field
activities are in place. The biggest open variables are a)
network-related issues that can only be identified once operations
start phasing in at the test site, and b) the arm software. With
regards to the former, the NSI and EDS comm equipment is scheduled to
arrive in Hawaii on 8 February, with check-out testing beginning the
next day. As for arm control, the basic software is written, but there
are still some interrupt-handling processes associated with the motion
control card that need to be resolved. Jay Steele has the action item
to work these as well as a number of minor sensor algorithm
adjustments during the next few days at Ames using the MEL testbed
vehicle.
Based on this progress, the rover team in Huntington Beach is now
packing the Marsokhod and the support equipment for on-schedule
delivery to the shipper tomorrow (Monday). It will arrive in Hawaii on
Thursday, 9 February. Karl and Gary will also deliver the baseline PIN
control software to EDS and WilTel for installation on the PIN site
computers.
The following is the top-level schedule of major events for the next
week leading up to the start of the Mars science testing on Monday, 13
February. A more detailed schedule is available for those members of
the technical team requiring better insight.
Sunday - 5 February - pack the Marsokhod and support equipment
Monday - 6 February - deliver the Marsokhod to the shipper
- Dave James and Greg Loboda leave for Hawaii
- MDA will provide the baseline PIN rover
control software to EDS
Tuesday - 7 February - organizational meeting at the Hawaiian
Volcano Observatory
Wednesday - 8 February - NSI and EDS communications network gear
arrive in Hilo
Thursday - 9 February - Marsokhod reaches Hawaii
- rest of Marsokhod technical team arrives
- begin communications network check-out
Friday - 10 February - begin Marsokhod check-out tests
- demonstrate VEVI and PIN control from Ames
and McDonnell Douglas
Saturday - 11 February - demonstrate rover operation at the field site
Sunday - 12 February - contingency day
Monday - 13 February - begin Mars science tests
------------------------------------------------------------------------------
For additional information on Marsokhod and JASON activities please
check the following WWW pages:
NASA Ames Intelligent Mechanisms Group
http://maas-neotek.arc.nasa.gov/
http://maas-neotek.arc.nasa.gov/marsokhod
McDonnell Douglas
http://pat.mdc.com/HB/new/Planetary/planetary.html
JASON Foundation
http://seawifs.gsfc.nasa.gov/JASON.html
_______________________________________________________________________________
"San Francisco has only one Terry Fong <terry@cmu.edu>
drawback - it's hard to leave..." Robotics Institute, Carnegie Mellon
-- Rudyard Kipling Pittsburgh, PA 15213 412-268-1416
--
_______________________________________________________________________________
"San Francisco has only one Terry Fong <terry@cmu.edu>
drawback - it's hard to leave..." Robotics Institute, Carnegie Mellon
-- Rudyard Kipling Pittsburgh, PA 15213 412-268-1416
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads