Hi all,
The following is a status update on the Pele Rover Mission. The Pele
lunar rover mission concept is a proposal developed by a joint team of
the University of Hawaii, NASA Ames Research Center, NASA Johnson
Space Center, McDonnell Douglas Aerospace, the Lavochkin Association,
and Brown University. The mission concept proposes to explore issues
in lunar science and planetary volcanism that were left unanswered by
Apollo. The Pele team is currently conducting field trials with a
Marsokhod rover in the Kilauea Volcano, Hawaii. A major focus of these
tests is to evaluate the use of advanced teleoperations methods (e.g.,
virtual environment based control, high-fidelity stereo video based
telepresence) for operating the rover from geographically distributed
remote control stations.
------------------------------------------------------------------------------
Pele Mission Status Report
Hawaii Volcano Observatory -- Kilauea, Hawaii
10-Feb-1995
As of this Friday afternoon, the implementation of the Marsokhod field
test operations are well underway. Most of the critical network
communications equipment was delivered and physically in place by
Wednesday (2/8) afternoon, while the Marsokhod and associated support
equipment arrived yesterday.
In the communications area, Keith Brumbaugh (NASA Science Internet)
and Mike Durbin (EDS) have succeeded in connecting the local control
station in the observation tower of the Hawaii Volcano Observation to
the mainland. Specifically, the EDS-supplied Ku-band uplink is
transmitting compressed video of the Kilauea caldera to the NASA Ames
Intelligent Mechanisms Lab that will serve as the remote control
operations center during next week's series of planetary rover science
tests. Additionally, the digital link is working, with Butler Hine
logging in from Ames onto the local control computer (termed
"central") . Karl Pfitzer at McDonnell Douglas - Huntington Beach also
logged in using the Remote Teleoperations Control Program (RTCP) that
has been developed for the PIN site operations during the JASON VI
activities.
As for the rover, it appears that all the Marsokhod hardware survived
the shipment from McDonnell Douglas' Huntington Beach facility without
incident, including spare chassis components sent by VNIITransMash in
St. Petersburg earlier in the week. Hans Thomas (Ames), Greg Loboda
and Dave James (MDA) have finished putting the vehicle back together
and are proceeding with final electrical check-out prior to initial
field checks. The CPU was booted successfully on Friday.
In parallel, Dave Burnett, Dave J. and Hans installed the helical and
Yagi antennas and associated cabling needed to communicate wit the
rover once it i in the field. Back in Huntington Beach, Karl and Gary
continued to refine the basic RTCP as well a the initial version of
the PC-based GLOVI simulation software. One of the improvements under
consideration for RTCP is the use of a new wavelet compression
algorithm originally developed by McDonnell Douglas colleagues in St.
Louis. This new software promises to improve the speed of image
transmission over the WilTel digital network when all the PIN sites
are on-line. As for GLOVI, licensing negotiations are continuing to
make it available for use at the PIN sites and by other interested
parties.
The team also took numerous digital photos with the Kodak 420 Digital
Camera System. Dave Burnett has finished processing them to make them
a useable file size and will post them shortly on the Ames Artemis
file server. During the weekend, they will be tied into the Ames and
MDA home pages.
The field team at HVO presently consists of:
NASA Ames:
- Daryl Rasmussen
- Jay Steele
- Hans Thomas
McDonnell Douglas Aerospace
- Dave Burnett
- John Garvey
- Dave James
- Greg Loboda
NASA Science Internet
- Keith Brumbaugh
EDS / JASON Foundation for Education
- Mike Durbin
A contingent of JASON is scheduled to arrive early next week.
The near-term schedule is:
Saturday, 11 February
- initial rover operations
- end-to-end connection between the Ames control center and the
Marsokhod in the field
- install the updated arm control software
Sunday, 12 February
- final preparations
Monday, 13 February
- begin Mars science operations
------------------------------------------------------------------------------
For additional information on Marsokhod and JASON activities please
check the following WWW pages:
NASA Ames Intelligent Mechanisms Group
http://maas-neotek.arc.nasa.gov/
http://maas-neotek.arc.nasa.gov/marsokhod
McDonnell Douglas
http://pat.mdc.com/HB/new/Planetary/planetary.html
JASON Foundation
http://seawifs.gsfc.nasa.gov/JASON.html
--
_______________________________________________________________________________
"San Francisco has only one Terry Fong <terry@cmu.edu>
drawback - it's hard to leave..." Robotics Institute, Carnegie Mellon
-- Rudyard Kipling Pittsburgh, PA 15213 412-268-1416
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads