🚀 go-pugleaf

RetroBBS NetNews Server

Inspired by RockSolid Light RIP Retro Guy

1 total messages Started by Dominic Dunlop Fri, 08 Feb 1991 10:37
Re: IEEE TCOS, New Orleans, January 1991: EurOpen IR's report
#760
Author: Dominic Dunlop
Date: Fri, 08 Feb 1991 10:37
33 lines
1798 bytes
Submitted-by: domo@tsa.co.uk (Dominic Dunlop)

Mary Lynne Nielsen, IEEE Project Editor, makes the following
corrections:

> Whenever a possible new POSIX-related
> standards activity is identified, its promoters can draw up
> a Project Authorization Request (PAR), and submit it to the
> Sponsor Executive Committee (SEC) of TCOS.  If approved
> (sponsored in IEEE terminology), and subsequently rubber-
> stamped by the  IEEE Computer Society's Standards Activities
> Board (SAB), a new project is created.
> ...
>    - Balloting groups are drawn from the membership of a
>      balloting pool.  The pool has three types of member:
>      individual members of the IEEE who have specifically
>      applied to join the pool; institutional
>      representatives (IRs) accepted by the IEEE-CS SAB;
>      and national heads of delegation to the ISO
>      POSIX working group.

The CS SAB has no official right to approve PARs, but
approves to send them on to the IEEE Standards Board.  It is
the IEEE Standards Board, which oversees the standards
activities of all 40-odd societies in the IEEE, which grants
actual approval.  Also, the IEEE Standards Board is the
organization that officially approves IR membership status, not
the CS SAB.

-- 
Dominic Dunlop

Volume-Number: Volume 22, Number 117
Thread Navigation

This is a paginated view of messages in the thread with full content displayed inline.

Messages are displayed in chronological order, with the original post highlighted in green.

Use pagination controls to navigate through all messages in large threads.

Back to All Threads