Thread View: comp.sys.hp.mpe
1 messages
1 total messages
Started by John Vestal d1352
Tue, 12 Apr 1994 14:45
Quick question about POSTUPDATE Procedure
Author: John Vestal d1352
Date: Tue, 12 Apr 1994 14:45
Date: Tue, 12 Apr 1994 14:45
7 lines
1429 bytes
1429 bytes
Hi all,
I have a question about Quick 5.09D on MPE 4.0. I have a C routine called
from the postupdate procedure to move a record from one detail to any other under certain conditions. If I do not change the record, no problem, let Quick continue on. If I do change the record, I want to force quick to get the next record, regardless of if the user did an update-stay. I can do a push next if the record was changed, but a "regular" update, or an update-next then "skips" a record (ie. it does two nexts). How do I do this? Any suggestions would be appreciated.
Thanks,
vestal (John C. Vestal)
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads