Thread View: comp.sys.transputer
1 messages
1 total messages
Started by Stephen Doyle
Tue, 29 Sep 1992 17:04
Re: T9000 Availability
Author: Stephen Doyle
Date: Tue, 29 Sep 1992 17:04
Date: Tue, 29 Sep 1992 17:04
27 lines
1858 bytes
1858 bytes
This message should clarify the true situation behind David May's presentation of a T9000 alpha device to Parsytec at TAT '92 (Aachen). The device in question was an open package containing a real T9000 alpha die which was bonded out. It was the intention that this device should be used for display purposes only and not intended to be plugged into a board, and was presented to Parsytec who were the organisers of TAT '92 as David May was unable to stay for the full duration of the conference. We have been testing fully packaged T9000 alpha devices in our laboratories in Bristol as part of the normal product development cycle. We have kept our transputer customers up to date with progress on the T9000 developments and have made provision for a special customer laboratory in Bristol where major customers can gain access to T9000 alpha silicon and further their own product development. The T9000 alpha silicon was intentionally produced without the data links. The T9000 beta silicon which is going through the fab at the moment has all the functional blocks (including VCP and data links) of the T9000 integrated (as defined in the technical disclosure of April 1991). INMOS Limited Steve Doyle, Software Marketing, INMOS Ltd | Tel +44 454 616616 1000 Aztec West | Almondsbury | UK: steved@inmos.co.uk Bristol BS12 4SQ, UK | US: steved@inmos.com
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads