Thread View: demon.announce
1 messages
1 total messages
Started by Malcolm S. Muir
Mon, 11 Sep 2006 12:26
Planned Maintenance ADSL
Author: Malcolm S. Muir
Date: Mon, 11 Sep 2006 12:26
Date: Mon, 11 Sep 2006 12:26
61 lines
2919 bytes
2919 bytes
-----BEGIN PGP SIGNED MESSAGE-----
We have been notified by BT that they will be carrying out planned
maintenance affecting our ADSL customers as follows:
11th September East Midlands
12th September East Midlands
13th September East Midlands
14th September North Scotland
15th September West Scotland
18th September West Scotland
19th September East Scotland
20th September North Wales
21st September Northern Ireland
22nd September East Anglia
25th September East Anglia
26th September South Downs
27th September Southampton
28th September Severn Side
29th September South Wales
2nd October London North
3rd October London South
4th October London Central
5th October North Downs
6th October Thamesway
9th October Mid Yorkshire
10th October South Lancs
11th October Lancashire
12th October Liverpool
12th October Manchester
13th October North East
13th October Cornwall
BT state the work is "To enable an essential network upgrade, Planned
Engineering Works downtimes are required each day affecting End Users
for a period of up to 30 minutes".
Malcolm Muir
D e m o n
- --
Malcolm S. Muir
Sunderland
England
- --
Malcolm S. Muir D e m o n
Sunderland 322 Regents Park Road
England London N3 2QQ
-----BEGIN PGP SIGNATURE-----
Version: PGPsdk version 1.7.1
iQCVAwUBRQVV+sUeMni8Zor9AQGl1gP/dNfaVtVj3bcIq3cCwnmycyzX7ibFLGlJ
wBmcJOfjnlwcOnz+wDwLMUkuvNtP8w7rxRGkEKxok/FJyjULzWfRDDT6gT3Gtq6h
LnLb6qjZFOXGQDh5I99N4uXrvMJgtr4/LA/oGrHJnH71J8AtT5h8UxQhZTdLTMSg
GB1+JRMcd9Q=
=dgY2
-----END PGP SIGNATURE-----
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads