🚀 go-pugleaf

RetroBBS NetNews Server

Inspired by RockSolid Light RIP Retro Guy

Article View: gnu.chess
Article #2304

ATTN: V.P. Power Project Development

#2304
From: Christopher D. Hayes
Date: Wed, 04 Oct 2000 00:00
379 lines
18277 bytes
This is a multi-part message in MIME format.

------=_NextPart_000_000E_01C02DAB.CE459CA0
Content-Type: text/plain;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

ATTN:  V.P. Power Project Development

Please send me a quick reply so that I know this item was well received. =
=20

Currently, we can deliver an LM 6000, or LM 2500 up and running in less =
than 90 days.  We draw on a vast assortment of new, surplus, refurbished =
or zero-timed units and we have several barges ready to receive power =
immediately.  I'm sure we can supply you with whatever your project =
needs are and very quickly.=20

The following properties are examples of what we can offer.=20

BARGE MOUNTED POWER PLANT, 100+ MEGAWATT We can provide a 100+  MW Barge =
Mounted Power Plant, complete, ABS Certified, consisting of two (2) 50 =
MW Gas Turbine Generators.=20
Outputs are at ISO conditions.  These units will be refurbished and =
ready to operate on either Natural Gas or Fuel Oil and installed on an =
ABS certified barge.  Delivery can occur within approximately 120 =
working days (4 months) after receipt of funds as specified below.=20
The two Gas Turbines will be set up to operate singularly or in =
parallel.=20
The Generator output will be 10,800 volts, 3-phase, 50 HZ.  (With =
upgrade to 60 HZ available)  The power will be transported to shore by =
overhead transmission lines at Generator voltage.  A control room will =
be provided together with switchgear and circuit disconnects.=20
The customer/buyer will be responsible for providing all fuel needs =
including delivery and storage of fuel.  The customer will also be =
responsible for all Grid connections and transformation of power.=20

We will provide, as part of the Barge package, an emergency generator =
for lighting and Barge pumps.  The Turbines can be started with electric =
motors powered from the emergency generator (diesel fueled) or by =
pressurized air.=20

All of this equipment is offered subject to prior sale.  The costs will =
be adjusted accordingly if additional or substitute equipment is =
required by customer.=20

The two (2) Gas Turbines can be adapted to operate on Heavy Fuel (HFO) =
or Bunker "C" or #6 Fuel oil, providing proper oil treatment modules are =
utilized.  We will offer this equipment under separate Contract.=20

ESTIMATE OF COSTS:=20
To prepare a formal quotation and provide detailed equipment specifics, =
i.e. model numbers, serial numbers, etc., a one-percent (1%) Cash =
Advance shall be placed in an escrow account with draws for the =
preparation of same and expenses incurred.  An Executed "Non-Disclosure, =
Non-Compete, Non-Circumvent Agreement" must be signed by the "end-user". =
 It will take two (2) weeks, after receipt of one-percent (1%) cash =
advance funds, and after ALL pertinent information regarding the =
ultimate construction of the barge is received by us from the buyer, to =
prepare the Formal Quotation.=20

After receipt of the Formal Quotation/Proposal,  buyer shall have two =
(2) weeks to place a five-percent (5%) refundable deposit which will =
allow him thirty (30) days to perform "due diligence".  At the end of =
this "due diligence" period, buyer shall pay eighty-five percent (85%) =
of the total purchase price.  The balance due shall be paid upon =
customer acceptance of the unit.=20

Currently, we have a "window" of opportunity open to immediately =
initiate necessary engineering work.  This work will be accomplished by =
"World Class" Maritime Contractors; therefore, meeting the highest of =
Standards.=20

NEW 1999 MODEL POWER BARGE=20
We can furnish 100MW Power Barge complete with two (2) new, state- of- =
the-art 1999 model, Westinghouse Turbine Gensets, 50 Hz  Same terms as =
above=20

LM 2500 GAS TURBINE POWER PLANT=20
ONE (1) ONLY..=20
G.E. LM2500-PE (UPGRADED), NATURAL GAS, WATER INJECTION,=20
13.8 KV, 26,500 KVA, TURBINE GENERATOR PACKAGE AS FOLLOWS:=20
1. ENGINE AND POWER TURBINE SECTION HAS BEEN COMPLETELY FACTORY REBUILT =
TO ZERO TIME AND WILL CARRY A ONE (1) YEAR FACTORY STANDARD G.E. =
WARRANTY.=20

2. GEAR BOX, GENERATOR SECTIONS HAVE A TOTAL OF 25,000 HOURS ON THEM AND =
AND WILL BE COMPLETELY REFURBISHED TO "AS NEW" CONDITION.=20

3. THE PROTECTION AND CONTROL SYSTEMS WILL BE REPLACED WITH CURRENT =
SOLID STATE SYSTEMS IN ACCORDANCE WITH THE REQUIREMENTS FOR A NEW =
INSTALLATION.  THIS INCLUDED:  VIBRATION SYSTEMS, GENERATOR PROTECTION, =
TURBINE START SYSTEMS, OPERATOR INTERFACE COMPONENTS AND POWER SYSTEM =
SYNCHRONIZATION SYSTEMS.=20

4. THE ENGINE AND POWER TURBINE SECTION WILL HAVE A ONE (1) YEAR =
WARRANTY IN ACCORDANCE WITH A STANDARD G.E. WARRANTY AND THE REMAINDER =
OF THE MODULE WILL CARRY A ONE (1) YEAR WARRANTY BY THE SUPPLIER AND IN =
ACCORDANCE WITH A STANDARD FACTORY WARRANTY FOR NEW EQUIPMENT OF THIS =
TYPE.=20


WHAT WE DO:  We primarily install, relocate or otherwise put power in =
service on a turnkey basis, virtually anywhere in the world.   We also =
do major repairs, mechanical and electrical, rotating equipment and even =
substation equipment.    We have a rather strange assortment of =
equipment to support our work, special hydra lift trailers for moving =
large engine without disassembly, cranes for use in trying areas, high =
voltage bucket trucks, a portable repair shop that can be moved to a =
major site that is 100 ft X 60 ft and is fully equipped for anything =
from turbine repairs, installs or we can do a large rewind .. For =
off-shore work we have a floating shop, a service vessel that has =
equipment on-board to move generation or also do similar service and =
repairs.     An example might be a turbine or other generation =
installation even on a barge power plant that is in service .. we can =
often dock along side and do it all as though the barge was in a harbor. =
Sometimes, in addition to supplying New Equipment, we can supply used, =
refurbished or surplus assets.  Several possible powerplants considered =
for relocation are made available by Marcor Remediation Inc.  Marcor is =
working with the Jacksonville Electric Authority, Basin Electric and =
other major US utilities to offer certain Surplus Generating Assets to =
the worlds energy sectors.  This equipment is listed in some detail on =
our company webpage(http://www.marcor.com/services/sales/sales.htm.)    =
This is a partial listing so let me know if your company contacts are in =
the market for anything in particular, we may be able to help. These are =
additional properties I am working on, we handle Turnkey installations =
all over the world as well as a good deal of offshore work.  =20
Christopher D. Hayes =20

GLOWJAX LLC=20

glowjax@rcn.com=20

Ph# 1-(215)-541-1608=20

1340 Moyer Rd.=20

Red Hill Pa. 18076=20

CONFIDENTIALITY This e-mail and any attachments are confidential and may =

also be privileged.  If  you  are  not  a  named  recipient  or able to =
distribute to the appropriate office or person please  notify=20
the  sender immediately. =20

 =20
 =20
 =20

------=_NextPart_000_000E_01C02DAB.CE459CA0
Content-Type: text/html;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=3DContent-Type content=3D"text/html; =
charset=3Dwindows-1252">
<META content=3D"MSHTML 5.50.4134.600" name=3DGENERATOR>
<STYLE></STYLE>
</HEAD>
<BODY bgColor=3D#ffffff>
<DIV><FONT size=3D2>
<DIV>
<DIV>
<DIV>
<DIV>
<DIV>
<DIV><STRONG><EM><FONT size=3D2>ATTN:&nbsp; V.P. Power Project=20
Development</FONT></EM></STRONG></DIV>
<DIV><STRONG><EM><FONT size=3D2></FONT></EM></STRONG>&nbsp;</DIV>
<DIV><B><I><FONT size=3D2>Please send me a quick reply so that I know =
this item=20
was well received.&nbsp; </FONT></I></B></DIV>
<DIV><B><I><FONT size=3D2></FONT></I></B>&nbsp;</DIV></DIV>
<DIV><STRONG><EM><FONT size=3D2>Currently, we can deliver an LM 6000, or =
LM 2500=20
up and running in less than 90 days.&nbsp; We draw on a vast assortment =
of new,=20
surplus, refurbished&nbsp;or zero-timed&nbsp;units and we have several =
barges=20
ready to receive power immediately.&nbsp; I'm sure we can supply you =
with=20
whatever your project needs are and very quickly.</FONT>=20
<DIV>&nbsp;</DIV><FONT size=3D2>The following properties are examples of =
what we=20
can offer.</FONT></EM></STRONG><FONT size=3D2>&nbsp;<B><I><FONT=20
color=3D#0000ff></FONT></I></B></FONT></DIV>
<DIV><B><I><FONT color=3D#0000ff size=3D2></FONT></I></B>&nbsp;</DIV>
<DIV><FONT size=3D2><B><I><FONT color=3D#0000ff>BARGE MOUNTED POWER =
PLANT, 100+=20
MEGAWATT</FONT></I></B>&nbsp;<B><I>We can provide a 100+&nbsp; MW Barge =
Mounted=20
Power Plant, complete, ABS Certified, consisting of two (2) 50 MW Gas =
Turbine=20
Generators.</I></B> <BR><B><I>Outputs are at ISO conditions.&nbsp; These =
units=20
will be refurbished and ready to operate on either Natural Gas or Fuel =
Oil and=20
installed on an ABS certified barge.&nbsp; Delivery can occur within=20
approximately 120 working days (4 months) after receipt of funds as =
specified=20
below.</I></B> <BR><B><I>The two Gas Turbines will be set up to operate=20
singularly or in parallel.</I></B> <BR><B><I>The Generator output will =
be 10,800=20
volts, 3-phase, 50 HZ.&nbsp; (With upgrade to 60 HZ available)&nbsp; The =
power=20
will be transported to shore by overhead transmission lines at Generator =

voltage.&nbsp; A control room will be provided together with switchgear =
and=20
circuit disconnects.</I></B> </FONT></DIV>
<P><FONT size=3D2><B><I>The customer/buyer will be responsible for =
providing all=20
fuel needs including delivery and storage of fuel.&nbsp; The customer =
will also=20
be responsible for all Grid connections and transformation of =
power.</I></B>=20
</FONT>
<P><FONT size=3D2><B><I>We will provide, as part of the Barge package, =
an=20
emergency generator for lighting and Barge pumps.&nbsp; The Turbines can =
be=20
started with electric motors powered from the emergency generator =
(diesel=20
fueled) or by pressurized air.</I></B> </FONT>
<P><FONT size=3D2><B><I>All of this equipment is offered subject to =
prior=20
sale.&nbsp; The costs will be adjusted accordingly if additional or =
substitute=20
equipment is required by customer.</I></B> </FONT>
<P><FONT size=3D2><B><I>The two (2) Gas Turbines can be adapted to =
operate on=20
Heavy Fuel (HFO) or Bunker "C" or #6 Fuel oil, providing proper oil =
treatment=20
modules are utilized.&nbsp; We will offer this equipment under separate=20
Contract.</I></B> </FONT>
<P><FONT size=3D2><B><I>ESTIMATE OF COSTS:</I></B> <BR><B><I>To prepare =
a formal=20
quotation and provide detailed equipment specifics, i.e. model numbers, =
serial=20
numbers, etc., a one-percent (1%) Cash Advance shall be placed in an =
escrow=20
account with draws for the preparation of same and expenses =
incurred.&nbsp; An=20
Executed "Non-Disclosure, Non-Compete, Non-Circumvent Agreement" must be =
signed=20
by the "end-user".&nbsp; It will take two (2) weeks, after receipt of=20
one-percent (1%) cash advance funds, and after ALL pertinent information =

regarding the ultimate construction of the barge is received by us from =
the=20
buyer, to prepare the Formal Quotation.</I></B> </FONT>
<P><FONT size=3D2><B><I>After receipt of the Formal =
Quotation/Proposal,&nbsp;=20
buyer shall have two (2) weeks to place a five-percent (5%) refundable =
deposit=20
which will allow him thirty (30) days to perform "due diligence".&nbsp; =
At the=20
end of this "due diligence" period, buyer shall pay eighty-five percent =
(85%) of=20
the total purchase price.&nbsp; The balance due shall be paid upon =
customer=20
acceptance of the unit.</I></B> </FONT>
<P><FONT size=3D2><B><I>Currently, we have a "window" of opportunity =
open to=20
immediately initiate necessary engineering work.&nbsp; This work will be =

accomplished by "World Class" Maritime Contractors; therefore, meeting =
the=20
highest of Standards.</I></B> </FONT>
<P><FONT size=3D2><B><I><FONT color=3D#008000>NEW 1999 MODEL POWER=20
BARGE</FONT></I></B> <BR><B><I>We can furnish 100MW Power Barge complete =
with=20
two (2) new, state- of- the-art 1999 model, Westinghouse Turbine =
Gensets, 50=20
Hz&nbsp; Same terms as above</I></B> </FONT>
<P><FONT size=3D2><B><I><FONT color=3D#ff0000>LM 2500 GAS TURBINE POWER=20
PLANT</FONT></I></B> <BR><B><I>ONE (1) ONLY..</I></B> <BR><B><I>G.E. =
LM2500-PE=20
(UPGRADED), NATURAL GAS, WATER INJECTION,</I></B> <BR><B><I>13.8 KV, =
26,500 KVA,=20
TURBINE GENERATOR PACKAGE AS FOLLOWS:</I></B> <BR><B><I>1. ENGINE AND =
POWER=20
TURBINE SECTION HAS BEEN COMPLETELY FACTORY REBUILT TO ZERO TIME AND =
WILL CARRY=20
A ONE (1) YEAR FACTORY STANDARD G.E. WARRANTY.</I></B> </FONT>
<P><FONT size=3D2><B><I>2. GEAR BOX, GENERATOR SECTIONS HAVE A TOTAL OF =
25,000=20
HOURS ON THEM AND AND WILL BE COMPLETELY REFURBISHED TO "AS NEW"=20
CONDITION.</I></B> </FONT>
<P><FONT size=3D2><B><I>3. THE PROTECTION AND CONTROL SYSTEMS WILL BE =
REPLACED=20
WITH CURRENT SOLID STATE SYSTEMS IN ACCORDANCE WITH THE REQUIREMENTS FOR =
A NEW=20
INSTALLATION.&nbsp; THIS INCLUDED:&nbsp; VIBRATION SYSTEMS, GENERATOR=20
PROTECTION, TURBINE START SYSTEMS, OPERATOR INTERFACE COMPONENTS AND =
POWER=20
SYSTEM SYNCHRONIZATION SYSTEMS.</I></B> </FONT>
<P><FONT size=3D2><B><I>4. THE ENGINE AND POWER TURBINE SECTION WILL =
HAVE A ONE=20
(1) YEAR WARRANTY IN ACCORDANCE WITH A STANDARD G.E. WARRANTY AND THE =
REMAINDER=20
OF THE MODULE WILL CARRY A ONE (1) YEAR WARRANTY BY THE SUPPLIER AND IN=20
ACCORDANCE WITH A STANDARD FACTORY WARRANTY FOR NEW EQUIPMENT OF THIS=20
TYPE.</I></B> </FONT></P><B><I>
<DIV><B><I><FONT size=3D2></FONT></I></B>&nbsp;</DIV>
<DIV><FONT size=3D2><B><I>WHAT WE DO:&nbsp; We primarily install, =
relocate or=20
otherwise put power in service on a turnkey basis, virtually anywhere in =
the=20
world.&nbsp;&nbsp; We also do major repairs, mechanical and electrical, =
rotating=20
equipment and even substation equipment.&nbsp;&nbsp;&nbsp; We have a =
rather=20
strange assortment of equipment to support our work, special hydra lift =
trailers=20
for moving large engine without disassembly, cranes for use in trying =
areas,=20
high voltage bucket trucks, a portable repair shop that can be moved to =
a major=20
site that is 100 ft X 60 ft and is fully equipped for anything from =
turbine=20
repairs, installs or we can do a large rewind ..</I></B>&nbsp;<B><I>For=20
off-shore work we have a floating shop, a service vessel that has =
equipment=20
on-board to move generation or also do similar service and=20
repairs.&nbsp;&nbsp;&nbsp;&nbsp; An example might be a turbine or other=20
generation installation even on a barge power plant that is in service =
. we can=20
often dock along side and do it all as though the barge was in a=20
harbor.</I></B>&nbsp;<B><I>Sometimes, in addition to supplying New =
Equipment, we=20
can supply used, refurbished or surplus assets.&nbsp; Several possible=20
powerplants considered for relocation are made available by Marcor =
Remediation=20
Inc.&nbsp; Marcor is working with the Jacksonville Electric Authority, =
Basin=20
Electric and other major US utilities to offer certain Surplus =
Generating Assets=20
to the worlds energy sectors.&nbsp; This equipment is listed in some =
detail on=20
our company webpage</I></B><B><I>(<FONT color=3D#000000><A=20
href=3D"http://www.marcor.com/services/sales/sales.htm">http://www.marcor=
com/services/sales/sales.htm</A>.)&nbsp;&nbsp;&nbsp;=20
This is a partial listing so let me know if your company contacts are in =
the=20
market for anything in particular, we may be able to=20
help.</FONT></I></B>&nbsp;<B><I>These are additional properties I am =
working on,=20
we handle Turnkey installations all over the world as well as a good =
deal of=20
offshore work.&nbsp;&nbsp; </I></B></FONT></DIV>
<P><FONT size=3D2>Christopher D. Hayes</FONT></I></B><FONT =
size=3D2>&nbsp;</FONT>=20
<P><B><I><FONT size=3D2>GLOWJAX LLC</FONT></I></B>=20
<P><B><I><FONT color=3D#000000 size=3D2><A=20
href=3D"mailto:glowjax@rcn.com">glowjax@rcn.com</A></FONT></I></B>=20
<P><FONT size=3D2><STRONG><I>Ph# 1-(215)-541-1608</I> </STRONG></FONT>
<P><FONT size=3D2><STRONG><I>1340 Moyer Rd.</I> </STRONG></FONT>
<P><FONT size=3D2><STRONG><I>Red Hill Pa. 18076</I> </STRONG></FONT>
<P><FONT size=3D2><STRONG><I>CONFIDENTIALITY This e-mail and any =
attachments are=20
confidential and may</I> <BR><I>also be privileged.&nbsp; If&nbsp; =
you&nbsp;=20
are&nbsp; not&nbsp; a&nbsp; named&nbsp; recipient&nbsp; or able to =
distribute to=20
the appropriate office or person please&nbsp; notify</I> =
<BR><I>the&nbsp; sender=20
immediately.&nbsp; </I></STRONG></FONT></P></DIV>
<DIV><FONT size=3D2><STRONG>&nbsp;<SPAN=20
id=3D__#Ath#SignaturePos__></SPAN>&nbsp;</STRONG></FONT></DIV></DIV>
<DIV><FONT size=3D2><STRONG>&nbsp;<SPAN=20
id=3D__#Ath#SignaturePos__></SPAN>&nbsp;</STRONG></FONT></DIV></DIV>
<DIV><FONT size=3D2><STRONG>&nbsp;<SPAN=20
id=3D__#Ath#SignaturePos__></SPAN>&nbsp;</STRONG></FONT></DIV></DIV></FON=
T></DIV></BODY></HTML>

------=_NextPart_000_000E_01C02DAB.CE459CA0--
Technical Details
Message-ID: <001101c02dcd$a478ce20$1a603bd0@experryl>
Path: arc1-ca.pugleaf.net!unknown!not-for-mail

Show Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit
X-Google-Thread: 10d71d,ffdf796c67d016fb,start
X-Google-Attributes: gid10d71d,public
From: "Christopher D. Hayes" <glowjax@rcn.com>
Subject: ATTN:  V.P. Power Project Development
Date: 2000/10/04
Message-ID: <001101c02dcd$a478ce20$1a603bd0@experryl>
X-Deja-AN: 677349580
Sender: info-gnu-chess-request@mail.gnu.org
X-Priority: 3
Content-Type: multipart/alternative; boundary="----=_NextPart_000_000E_01C02DAB.CE459CA0"
X-MimeOLE: Produced By Microsoft MimeOLE V5.50.4133.2400
x-uunet-gateway: dfw7sosrv11.alter.net from info-gnu-chess to gnu.chess; Wed, 4 Oct 2000 06:33:40 GMT
Organization: GLOWJAX LLC
X-MSMail-Priority: Normal
MIME-Version: 1.0
Reply-To: "Christopher D. Hayes" <glowjax@rcn.com>
Newsgroups: gnu.chess