Thread View: la.transportation
1 messages
1 total messages
Started by Michael D. Setty
Sat, 28 Dec 2002 02:12
1997 Paper That Accurately Predicted Current Red Line Patronage
Author: Michael D. Setty
Date: Sat, 28 Dec 2002 02:12
Date: Sat, 28 Dec 2002 02:12
157 lines
9498 bytes
9498 bytes
We have posted a new Monograph at www.publictransit.us, "An Analysis of Ridership Forecasts for the Los Angeles Metro Red Line: Alternative Strategies and Future Transit Improvements." This document is in .pdf format, 243k size. This report by Leroy W. Demery, Jr. was quite prescient, accurately predicting current Los Angeles Red Line (subway) patronage. The report also accurately anticipated current patronage trends on the Los Angeles Blue Line (light rail) between downtown Los Angeles and Long Beach. Here is a summary of the paper: An Analysis of Ridership Forecasts for the Los Angeles Metro Red Line: Alternative Strategies and Future Transit Improvements June 1997 SUMMARY --- Ridership carried by the completed Red Line will stabilize well below the levels forecast prior to the start of construction, and those currently forecast by the Los Angeles County Metropolitan Transportation Authority. This will occur because the line cannot accommodate the peak-period volumes implied by these forecasts, given the travel patterns typical of U.S. cities and the crowding levels which consumers are likely to tolerate. ---The Red Line is likely to achieve the highest traffic density (passenger-miles per route-mile) of any postwar U.S. heavy-rail line. It may increase the total travel (passenger-miles) carried by the LACMTA system by more than ten percent. ---The likely ridership ceiling for Red Line, once extended to Hollywood, is in the range of 100,000 -- 150,000 per weekday, assuming an adequate peak-period service level. Upon completion to North Hollywood, the likely ridership ceiling is in the range of 120,000 -- 170,000 per weekday, depending on the distribution of ridership throughout the day and consumer tolerance for peak-period crowding. ---In order to accommodate 200,000 -- 250,000 passengers per weekday, as currently forecast, LACMTA would have to invest in upgraded terminal facilities, improved signals, and possibly, automatic train operation. The current forecasts imply peak-hour volumes exceeding 32,000 pass/hr, far higher than observed in any U.S. city except New York. Even if such demand does exist, serving it might not be cost-effective -- just as freeway widening to accommodate all peak-period demand is not cost-effective. ---Evaluation of Red Line results would have to consider that 1.) travel-time savings attract more passengers and longer trips to transit, and 2.) improvements leading to significant increases in average travel distance may also lead to large operating-cost increases. The Red Line will generate an LACMTA system-wide travel (passenger-mile) increase of 6-17 percent -- or more, depending on how much Red Line travel is "new" -- all concentrated in one corridor. In order to accomplish this with buses, LACMTA would have to operate 11-16 million more vehicle-miles annually, a 14-21 percent increase over the 1996 systemwide total -- while managing to provide similar travel-time reductions. Such alternative service would cost $40-70 million more per year to operate than the Red Line. (All cost comparisons herein are based on 1996 system performance, and are expressed in 1996 dollars.) ---An expanded Red Line, reaching Warner Center in the San Fernando Valley, Whittier/Atlantic in East Los Angeles, Beverly Hills, Century City, UCLA and Santa Monica would increase LACMTA system travel (passenger-miles) by roughly 50 percent. Annual operating cost would be $100-200 million less than bus services achieving the same results. ---The most needed mass transit improvement in Los Angeles is travel-time reduction. This stems from the large size of the region and the scattering of employment opportunities miles away from inner-city residents, who are effectively cordoned off from jobs which lie beyond the range of tolerable bus commuting. The large potential market for longer transit trips has been demonstrated since 1990 by the light-rail Blue Line, which attracts a peak-period average travel distance greater than ten miles. ---The Red Line will be quite competitive with the 1983-1985 fare subsidies in terms of additional travel and boardings. Operating cost for the completed Red Line should fall in the range of $0.25-0.35 per passenger-mile, compared to $0.80 per passenger-mile generated by the fare subsidies. Results in terms of boardings also favor the Red Line: $3.00 per boarding compared to $4.00 per boarding (in today's dollars) attracted by the 1983-1985 subsidies. ---A ten-percent increase in LACMTA annual bus-miles would generate about 70,000 additional weekday boardings, at an annual cost of $60 million. The implied cost per boarding, $2.50, is lower than that for the completed Red Line, but the cost per passenger-mile would be more than twice the Red Line figure. Successive service increases would not generate increased ridership in proportion (without other improvements), and would erode the cost-effectiveness of LACMTA's bus system. ---Targeted fare subsidies and bus service expansion should be implemented, but general fare subsidies or large-scale increases in vehicle mileage are not low-cost "shortcuts" to better transit service. --The tradeoffs among busways, light rail and heavy rail include capital cost, operating cost and ridership ceilings. Busways are strongly competitive with light rail; they may be implemented in unconnected stages, as in Ottawa, and so would have a strong advantage even if capital costs were equivalent. However, busway operating costs are often underestimated. The lower peak vehicle occupancies carried by U.S. busway, transitway and HOV services imply that a busway option would have to provide 40 percent higher peak service levels than a rail alternative in the same corridor. The reasonable maximum for light rail in U.S. cities, implying four-car trains every three minutes during peak periods, is about 8,000 pass/hr, implying about 60,000 pass/weekday. Higher volumes require full grade separation, which essentially means heavy rail. Busways are not a realistic option for corridors where anticipated peak volumes exceed this level. ---Ridership estimates for U.S. cities, based on performance of systems overseas, are likely to be inflated. The fact that individual heavy-rail lines carry more than one million passengers per day overseas does not imply that the same facility, duplicated in the U.S., would provide similar results. Similar examples may be given for busways and light rail. ---The busway and light-rail options for the Eastside and San Fernando Valley corridors are feasible alternatives to heavy rail, and could offer similar travel times. Net capacity, however, would be considerably less. Busway operating costs would be highest of the three modes. ---Light rail is probably not feasible in the Westside (Exposition) corridor without a separate entrance into downtown Los Angeles. Peak-period traffic potential and experience in other U.S. cities suggest that the current 7th St/Metro Center Blue Line terminal could not accommodate traffic from both lines. ---There is no technical reason why future heavy-rail or light rail lines need include any "subway" alignment. Light rail may be built on surface streets, as the Blue Line demonstrates. Both heavy rail and light rail may be built on viaduct, alongside freight railroads and in retained cuts. However, where heavy-rail capacity is needed, and where alternative alignments are not available, construction of elevated structures along major streets may impose unacceptable environmental impacts. It is difficult to imagine a non-subway alternative to the currently-funded Red Line, except perhaps over Cahuenga Pass. In addition, failure to connect the Long Beach and Pasadena Blue Lines will eventually impose a serious peak-period capacity constraint in downtown Los Angeles, overloading the Red Line between Union Station and 7th St/Metro Center. ---Los Angeles residents and community leaders should carefully consider various strategies for public transportation improvements. Capital-cost savings may be quickly absorbed by operating-cost increases. For example, $200 million would purchase 600 buses, which would cost $200 million per year to operate. Total cost for 600 buses and four years of operation: $1 billion. Maximum plausible weekday ridership increase: 200,000 -- 250,000. Service quality improvements, such as reduced travel times: none.
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads