From: Jim Swist
Date: Thu, 30 Jul 1992 14:10
Date: Thu, 30 Jul 1992 14:10
13 lines
1348 bytes
1348 bytes
What the tracks do at Harvard have nothing to do with Porter. The tunnels are side-by-side between the two stations so the decision to raise/lower one side was based on considerations local to the individual station. Now what *I* don't understand is why that sharp turn kludge was created at Harvard when the line was extended. This causes all trains to run at dead slow for several minutes chewing up a lot of time, not to mention that awful squealing of the wheels. I realize the old part of the line is very shallow in Cambridge (cut-and-cover vs a tunnel) and a straighter extension would have gone through the basement of the Coop, but they sure tunneled deep later on - couldn't they have started the deep part earlier?
Technical Details
Message-ID:
<1992Jul30.101035@doodly.mcc.dec.com>Path:
arc1-ca.pugleaf.net!sparky!uunet!decwrl!pa.dec.com!nntpd2.cxo.dec.com!nntpd.lkg.dec.com!doodly.mcc.dec.com!swistReferences:
<BETSYS.92Jul28131608@ra.cs.umb.edu> <BETSYS.92Jul24144345@ra.cs.umb.edu> <1992Jul24.220649.29733@cs.umb.edu>Show Full Headers
Complete Article Headers
Newsgroups: ne.general Path: arc1-ca.pugleaf.net!sparky!uunet!decwrl!pa.dec.com!nntpd2.cxo.dec.com!nntpd.lkg.dec.com!doodly.mcc.dec.com!swist From: swist@doodly.mcc.dec.com (Jim Swist) Subject: Re: Why did the Red line cross the tracks? Message-ID: <1992Jul30.101035@doodly.mcc.dec.com> Sender: usenet@nntpd.lkg.dec.com (USENET News System) Reply-To: swist@took.enet.dec.com Organization: Digital Equipment Corporation References: <BETSYS.92Jul28131608@ra.cs.umb.edu> <BETSYS.92Jul24144345@ra.cs.umb.edu> <1992Jul24.220649.29733@cs.umb.edu> Distribution: ne Date: Thu, 30 Jul 1992 14:10:35 GMT Lines: 13