"Howard Berkowitz" <hcb@gettcomm.com> wrote in message
news:hcb-9D8DF8.09290922122004@news-central.giganews.com...
> In article <cqbq5g$fp6$1@reader1.panix.com>,
> EskWIRED@spamblock.panix.com wrote:
>
>> In ne.general Howard Berkowitz <hcb@gettcomm.com> wrote:
>>
>> > Shorthand for both. One of the problems of this regulatory split into
>> > generation and distribution is that it did not take engineering safety
>> > into account. The reality is that a number of distribution companies
>> > were spinoffs of existing plant, and were not optimized for
>> > interconnection, being the older AC high-voltage treansmission systems.
>>
>> What do you mean that "a number of distribution companies ... [are] older
>> AC high-voltage transmission systems"?
>>
>> IME, the distribution companies have specs that need to be met before one
>> can interconnect. What kind of optimization are you referring to?
>
> I'd have to pull out the technical analysis of the last major Northeast
> blackout, but to my recollection, there was a problem of reactive AC
> surges from one of the generating companies, in, IIRC, Ohio.
From what I heard having an electronics tecnician in the family and after
some discussion with one of my engineering professors I have some up with
this:
A " null frequency event" was sent through the Eastern grid before the
cascading blackoutreported by a 3rd parties internet monitoring system in
Lansuing Mich. where the cascade was stopped This means that the 60Hz
frequency wave(which has been the standard scince electricity was first
used) would have had to have been met by a wave of equal or greater
magnitude but opposite polarity travelling over the grid (a surge). At the
meeting of thse two waves(Currents) the waves will kill each other leaving a
temporary lack of frequency. In the threee phase Delta layouts in high
voltage transmission you could kill all three waves with a single wave of
opposite current flow such as a ground current. but you would have three
nodes insted of one.
This is not the cause of the black out though as a wave of this type would
destroy any generators of opposing polarity because of the forces caused by
the magnetic field interactions. To prevent this Turbines have nutral
couplings on their shafts that connect the turbine to the grid. This
coupling under the given conditions is distroyed immidiately disconnecting
the turbine from the grid. two of the four units at Fermi 2 in Monroe MI
where lost because of this, proof of the "Erie Loop" reversal given in the
mass media. As a primary feature however this can be expensive as the whole
unit has to be taken apart to get to this coupling (I would have hated to
witness the thing blow)So all Yards of any size have automatic circut
breakers to prevent a surge from spreading out by disconnecting the opposing
lines. The blackout was the result of this safety feature not stopping the
surge most likely by an error in timing. Allowing the surge to dissipate
over a distance normally
I can verify a pluse however, a brownout In my home city of Windsor ON
occurred some time before the full grid "death" indicating two occurrences
or an undecected pulse. I can exepain this as Two massive Switch yards
connect four 110KV transfer lines through the city from to the Switchyard
in London ON to the Erie loop. one being from a now rebuilt power plant. The
London Switchyard controlls power flow flow of the Erie loop back into the
US through Sarnia by a mssive corridor (>500KV I think) The 8 line corridor
and yard is viewable for about 20 miles along the 401 before London. I saw
this by a brownout from a building connected the the power plant's switch
yard. I also belive the lines that power this city serve as stabilizers for
the loop. I belive this as most of the City of 200,000 had power and kept
power about four hours after the blackout while the radio was continuously
updating what city was powered and not Anyway about half an hour later a
masive brownout that lasted a good 20 seconds occurred and Toledo was
reported to have power then Cleveland after another massive brownout a few
minutes later. Thus establishing the base of the grid the Erie Loop. My
guess was they had powered most of the major lines from unaffected Quebec
and Manitoba and the unaffected parts of the Eastern interconnect directly
to the Loop with in a very short time. I remember that they where about to
close the bridge (9:30 I think) then a sudden fury of connections leading to
US then the loop at 11:00 I think. My parents place was on a feeder
connected to the bridge and sourced at that power plant yard so we got
special privildges as they where about to close the largest border crossing
in North America :) crazy or what? If the Erie Loop reversal cause was
correct than my experience would prove it.
As for a cause I dont think a bird casing a short circut along the lines in
Cleveland (I heard was the source apparently 3 of the five lines were on the
loop direction) could cause such a massive surge. Even a deliberate attempt
from that utility would have been absorbed by the others along the loop. You
would have had to disable all of the switch yards' safety featues along the
loop to cause this surge and still not have the energy it did!
You would need a huge amount of energy to cause the kind of surge that
happened. An amount of energy that would have been generated over a wide
area and involning some serious magnetic field dsiruption. One that an Act
of God could only make!!!!!
>>
>> > Thyristors and other new solid-state components. The Texas grid, for
>> > example, has primarily solid-state DC connections to ther grids.
>>
>> All three interconnects are via DC. However, within the ERCOT
>> Interconnect, they use the same 60 cycle AC as everybody else.
>
> Perfectly reasonable that AC is used for distribution. Not all
> interconnects in the country are DC.
>>
>> > >
>> > > It is crucial that the interconnecting generator be matched to the
>> > > system
>> > > it is connecing to. How could it be otherwise?
>>
>> > If you connect with DC, there's no issue of phase and frequency match.
>>
>> > A number of new, extremely high voltage (e.g., 750 KV and above)
>> > transmission facilities are DC, not AC.
>>
>> But no generators interconnect with them!
>
> Agreed. The power is rectified before interconnetion. It would be silly
> economy to replace existing and working AC generators with DC. It's an
> open engineering issue if future generators, especially in remote
> locations, _might_ be initially DC and convert to AC at regional
> distribution points -- that's an installation-specific tradeoff.
It is more efficient to flatten out a sinusoidal wave than it is to do the
reverse because of the circutry involved. In coverting from DC to AC You
consume more of your load. because of the forcing of the wave shape. in
AC-DC coversion you can squeeze more energy.(most AC power devices'
consumtions are measued by an RMS (DC conversion any way).
However AC is always going to be generated by a turbine because the
sinusiodal traces a circular path. If you wanred to go DC for the grid you
would have to place an AC-DC coverter at every generation point in the grid
otherwise you would have to change the way power is generated (not going to
hapen anywhewre in the near future). Otherwise any point at interfacing
would require two way coversion. as DC is in a single direction only. This
makes the idea of power sharing over a grid difficult requireing a more
sophisicated system at the appropriate points
Under DC (steady state) any secondary currents seen across a componet would
be added and power would be taken from the new current but polarized
componets such as some capacitors capacitors and polarised resistors) can be
damged or distroyed by any current reversal over time (a capacitor can be
distroyed by any reversal. Time is affeced by the current strength). If
anything under a power surge in DC you would not have as severe a result.
Thus surges as this would not matter.
It is an issue though one that needs to be carefully considered
KT
Technical Details
Message-ID:
<kJqyd.27994$GK5.1358385@news20.bellglobal.com>Path:
arc1-ca.pugleaf.net!g2news1.google.com!news1.google.com!proxad.net!fr.ip.ndsoftware.net!in.100proofnews.com!in.100proofnews.com!snoopy.risq.qc.ca!nf3.bellglobal.com!nf1.bellglobal.com!nf2.bellglobal.com!news20.bellglobal.com.POSTED!not-for-mailReferences:
<IvqdnZwE5rPG5V7cRVn-hA@comcast.com> <cq4ag1$gaa$1@reader2.panix.com> <aktxd.6571$ry.4615@fed1read01> <cq6huq$77f$1@reader2.panix.com> <hcb-276D79.10025620122004@news-central.giganews.com> <cq95c6$5lf$1@reader2.panix.com> <hcb-4CF213.11170021122004@news-central.giganews.com> <cqbq5g$fp6$1@reader1.panix.com> <hcb-9D8DF8.09290922122004@news-central.giganews.com>Show Full Headers
Complete Article Headers
X-Google-Thread: 1130cb,2fd769cb24cd204e X-Google-Thread: 105ecf,2fd769cb24cd204e X-Google-Thread: f9b7f,2fd769cb24cd204e X-Google-Thread: 105dfd,2fd769cb24cd204e X-Google-Thread: 101282,2fd769cb24cd204e X-Google-Attributes: gid1130cb,gid105ecf,gidf9b7f,gid105dfd,gid101282,public X-Google-Language: ENGLISH,ASCII-7-bit Path: arc1-ca.pugleaf.net!g2news1.google.com!news1.google.com!proxad.net!fr.ip.ndsoftware.net!in.100proofnews.com!in.100proofnews.com!snoopy.risq.qc.ca!nf3.bellglobal.com!nf1.bellglobal.com!nf2.bellglobal.com!news20.bellglobal.com.POSTED!not-for-mail From: "Kyle Turner" <kkyle003@sympatico.ca> Newsgroups: ne.general,ne.politics,ne.arts,dc.politics,us.military.army References: <IvqdnZwE5rPG5V7cRVn-hA@comcast.com> <cq4ag1$gaa$1@reader2.panix.com> <aktxd.6571$ry.4615@fed1read01> <cq6huq$77f$1@reader2.panix.com> <hcb-276D79.10025620122004@news-central.giganews.com> <cq95c6$5lf$1@reader2.panix.com> <hcb-4CF213.11170021122004@news-central.giganews.com> <cqbq5g$fp6$1@reader1.panix.com> <hcb-9D8DF8.09290922122004@news-central.giganews.com> Subject: Re: coldest winter weather in new england to go on record 2004-05 Lines: 145 X-Priority: 3 X-MSMail-Priority: Normal X-Newsreader: Microsoft Outlook Express 6.00.2900.2180 X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.2180 X-RFC2646: Format=Flowed; Original Message-ID: <kJqyd.27994$GK5.1358385@news20.bellglobal.com> Date: Wed, 22 Dec 2004 22:13:21 -0500 NNTP-Posting-Host: 67.71.64.87 X-Complaints-To: abuse@sympatico.ca X-Trace: news20.bellglobal.com 1103771600 67.71.64.87 (Wed, 22 Dec 2004 22:13:20 EST) NNTP-Posting-Date: Wed, 22 Dec 2004 22:13:20 EST Organization: Bell Sympatico