In article <5100133@ccvaxa>, aglew@ccvaxa.UUCP writes:
>
> There has been some discussion of delayed branches in this newsgroup;
> can anybody say anything useful about delayed load/stores? Ie. memory
> access functions that are defined to work the same way as delayed
> branches, not to take effect until after a few more instructions.
>
> Eg.: memaddr: .word 2
>
> LOAD r0 := #1
> LOAD r0 := [memaddr]
> MOV r1 := r0 -- r1 contains 1, not 2
> MOV r2 := r0 -- r2 contains 2, the load has completed
>
Microcoded systems have used delayed loads for some time. Weitek's 7137
and 7136 alu & sequencer use a delayed load model of the form
address is presented on address bus
data is loaded on a later cycle
Weitek splits presenting the address and the loading into two seperate
instructions.
The above example is not interruptable. If an interrupt happens between
the second load and the first mov the contents of r0 will be the same
for both moves.
--
Mike Mahar
UUCP: {turtlevax, cae780}!weitek!mahar
Disclaimer: The above opinions are, in fact, not opinions.
They are facts.
Technical Details
Message-ID:
<486@weitek.UUCP>Path:
arc1-ca.pugleaf.net!utzoo!mnetor!seismo!lll-crg!lll-lcc!qantel!hplabs!turtlevax!weitek!maharReferences:
<5100133@ccvaxa>Show Full Headers
Complete Article Headers
Relay-Version: version B 2.10 5/3/83; site utzoo.UUCP Path: arc1-ca.pugleaf.net!utzoo!mnetor!seismo!lll-crg!lll-lcc!qantel!hplabs!turtlevax!weitek!mahar From: mahar@weitek.UUCP (Mike Mahar) Newsgroups: net.arch Subject: Re: Delayed Loads Message-ID: <486@weitek.UUCP> Date: Tue, 16-Sep-86 13:13:46 EDT Article-I.D.: weitek.486 Posted: Tue Sep 16 13:13:46 1986 Date-Received: Wed, 17-Sep-86 04:57:08 EDT References: <5100133@ccvaxa> Organization: Weitek Corp. Sunnyvale Ca. Lines: 33 Summary: Delayed loads