🚀 go-pugleaf

RetroBBS NetNews Server

Inspired by RockSolid Light RIP Retro Guy

Article View: sbay.general
Article #38

SBAY Geek Ride 2/5/2001

#38
From: Ian Kluft
Date: Mon, 05 Feb 2001 10:23
233 lines
11248 bytes
This is periodic information from sbay.org.  The posting schedule for all
the periodic articles is included at the end of this message.  But you don't
have to wait for one that you want - all of these articles can be obtained
at any time from http://www.sbay.org/
------------------------------------------------------------------------------


                                SBAY GEEK RIDE
                                       
   
   
   The SBAY Geek Ride is a monthly bicycle ride event (weather
   permitting) from March to October. It takes place on the Sunday 8 days
   after the monthly SBAY Pizza meetings at 3PM. So you can determine the
   date as the Sunday following the 4th Saturday of the month. (On months
   starting on a Sunday, it's the 5th Sunday of the month. Otherwise it's
   the 4th Sunday.) If that's too much to figure out, make a point of
   checking the calendar here. ;-)
   
   Routes and starting points may vary each month. But they can be found
   on the sbay.general newsgroup and at
   http://www.sbay.org/geek-ride.shtml
   
   This is meant as a social/recreational event among sbay.org
   participants, their friends and others with similar technical
   interests. For serious bikers there are more appropriate club rides
   and events in the area.
   
   
   
   
   _On this page..._
     * Getting to the Geek Ride by Light Rail
     * SBAY Geek Ride Schedule
     * Past SBAY Geek Rides
     * Local Cycling Info
     * Cycling Tips
       
   
     _________________________________________________________________
   
   
   
Getting to the Geek Ride by Light Rail

   The general format for these rides is to begin from a VTA light rail
   station. That allows some participants to leave the car at home if
   they live within a few miles of a light rail station, and take their
   bikes on the light rail.
   
   VTA Light Rail runs on 15-minute intervals on Sunday afternoons. _Note
   that VTA allows 6 bicycles per light rail vehicle (trolley) and 2-4
   bikes per bus, depending on passenger load._ Trolleys may be at or
   near capacity for bikes going through downtown San Jose, even on
   Sunday afternoons. If you board a trolley in downtown, plan your trip
   to the rendezvous point to allow missing a trolley if it's full.
   
SBAY Geek Ride Schedule

   Sunday, March 25, 2001, 3PM
          
          + Route: Los Alamitos Creek Trail, Almaden Valley, South San
            Jose
          + Starting point: Almaden Light Rail Station
          + Ending point: Santa Teresa Light Rail Station
          + Mountain bikes recommended.
          + Directions: http://www.sbay.org/ride-alamitos-creek.html
            
   Sunday, April 29, 2001, 3PM
          
          + Route: Baypointe to Sunnyvale Baylands
          + Starting point: Baypointe Light Rail Station, North San Jose
          + Ending point: Borregas Light Rail Station, Sunnyvale
          + Mountain and road bikes.
          + Directions: http://www.sbay.org/ride-baypointe-baylands.html
            
   Sunday, May 27, 2001, 3PM
          
          + Route: Stevens Creek Trail, Shoreline Park
          + Starting point: Mountain View Transit Center (Light
            Rail/CalTrain)
          + Mountain and road bikes.
          + Directions: http://www.sbay.org/ride-mv-shoreline.html
            
   Sunday, June 24, 2001, 3PM
          
          + Route: TBA
          + Starting point: TBA
          + Directions: TBA
            
   Sunday, July 29, 2001, 3PM
          
          + Route: TBA
          + Starting point: TBA
          + Directions: TBA
            
   Sunday, August 26, 2001, 3PM
          
          + Route: TBA
          + Starting point: TBA
          + Directions: TBA
            
Past SBAY Geek Rides

   Sunday, August 27, 2000, 3PM (first SBAY Geek Ride)
          
          + Route: Los Alamitos Creek Trail, Almaden Valley, South San
            Jose
          + Starting point: Almaden Light Rail Station
          + Ending point: Santa Teresa Light Rail Station
          + Directions: http://www.sbay.org/ride-alamitos-creek.html
            
   Sunday, September 24, 2000, 3PM
          
          + Route: Baypointe to Sunnyvale Baylands
          + Starting point: Baypointe Light Rail Station, North San Jose
          + Ending point: Borregas Light Rail Station, Sunnyvale
          + Mountain and road bikes.
          + Directions: http://www.sbay.org/ride-baypointe-baylands.html
            
   Sunday, October 29, 2000, 3PM
          
          + Route: Stevens Creek Trail, Shoreline Park
          + Starting point: Mountain View Transit Center (Light
            Rail/CalTrain)
          + Mountain and road bikes.
          + Directions: http://www.sbay.org/ride-mv-shoreline.html
          + Rain alternate: Meet at the transit center anyway. We'll hang
            out at the nearby Dana Street Roasting Company at 744 Dana St
            in downtown Mtn View, which has an 802.11 wireless LAN
            somewhat similar to the SBAY Wireless Network.
          + Note: Daylight Savings Time starts on this day. If you forgot
            to set your clock, be there at 2PM instead. :-)
            
Local Cycling Info

   "Bikes on Transit" info at the Valley Transportation Authority (VTA)
          http://www.vta.org/bikes.html
          
   "Bicycling Safety" at Silicon Valley Bicycle Coalition (SVBC)
          http://www.svbcbikes.org/bked/
          
   "Bicycling Rules and Safety" at California Department of Motor
          Vehicles (DMV)
          http://www.dmv.ca.gov/about/bicycle.htm
          
   "Bay Area Biking" by Ron Horii
          http://pages.prodigy.net/rhorii/baybike.htm
          
   Almaden Cycle Touring Club (South Bay Area bike rides)
          http://www.actc.org/
          
Cycling Tips

     * Wear a bike helmet.
     * Don't get dehydrated. You can't just judge this by when you feel
       thirsty because you're already dehydrated before that point. Even
       for a recreational ride, dehydration will affect how well you can
       ride and can lead to discomfort like muscle cramps or exhaustion.
       So have water before, during and after the ride.
     * When on roads, keep your speed up and ride like a vehicle. Follow
       the rules of the road. Since we can travel 10-15mph easily, bikes
       move more like cars than pedestrians. The law requires bikes to
       use the same rules as cars (road signs, right side of the road,
       etc) except in cases where there are specific rules for bikes.
     * If necessary to avoid an obstacle, you're allowed to "take the
       lane" on the road.
     * Avoid doing anything drivers would find unpredictable. Use hand
       signals (or just point where you're going) to state your
       intentions, especially before "taking the lane".
     * Ride single file in bike lanes or other areas that aren't wide
       enough to ride side-by-side.
     * Give the right of way to pedestrians and equestrians.
     * State your intentions, such as "passing on your left", when
       passing pedestrians or other cyclicts.
     * Consider whether you'll need sun block before the ride.
     * Be alert for idiot drivers who might pass you on the left before
       making a right turn.
     * When riding past parked cars, try to leave room for opening doors.
       If that's not possible, remain alert for them.
     * If you're not comfortable with your cycling skill level, consider
       enrolling in the ACTC Academy. With that behind you, the routes we
       pick for the Geek Rides will be _easy_.
       
   
   
   Last updated: November 20, 2000


------------------------------------------------------------------------------

Posting Schedule for sbay.org Information Articles
--------------------------------------------------
These periodic articles are posted on a staggered schedule on the days
of the month shown below.
  2,9,16,23 SBAY Newsgroups          3,10,17,24 SBAY Newsgroup Policies
  1st,15th  SBAY.ORG Introduction    4th,18th   HOWTO: SBAY Newsfeeds
  8th,22nd  SBAY.ORG Social Events   12th,26th  SBAY.ORG Domain Park
  16th,30th SBAY Wireless Network    5th,19th   SBAY Geek Ride (cycling)
  12th,26th sbay.hams Info           6th,20th   sbay.transportation Info
  11th,25th sbay.linux Info          7th,21st   sbay.networking Info

Newsgroup charters are each posted weekly on these days of the week:
  sbay.education on Fridays          sbay.forsale on Thursdays
  sbay.general on Wednesdays         sbay.hams on Saturdays
  sbay.health on Sundays             sbay.housing on Tuesdays
  sbay.linux on Sundays              sbay.networking on Wednesdays
  sbay.news.config on Tuesdays       sbay.news.group on Mondays
  sbay.news.stats on Mondays         sbay.politics on Thursdays
  sbay.sports on Fridays             sbay.test on Saturdays
  sbay.transportation on Mondays

All of these files are also available any time from http://www.sbay.org/

About the sbay.* Newsgroups
---------------------------
The sbay.* newsgroups are only for articles at least partly specific to
the South Bay Area, which is Santa Clara County, California (Silicon Valley)
and vicinity in Northern and Central California.  These are intended for
use by local residents only.  Articles from outside Northern and Central
California are violations of the newsgroup charters.  We regret that due
to years of abuse, violations are subject to cancellation and a report of
abuse to the poster's Internet Service Provider.

About sbay.org
--------------
sbay.org is an informal association of electronic communications hobbyists
and professionals in Silicon Valley.  Among numerous volunteer activities,
our community operates the "sbay" newsgroups, a domain park (Internet
subdomain registry) and a metropolitan-area wireless network in the
South Bay/Silicon Valley area.  There are also monthly social events
including pizza get-togethers and bicycle rides, where all sorts of
technical topics in electronic communications are discussed.
Technical Details
Message-ID: <geek-ride-374-1@thunder.sbay.org>
Path: arc1-ca.pugleaf.net!supernews.google.com!sn-xit-02!sn-xit-01!supernews.com!newsfeed.stanford.edu!news.kjsl.com!news.announcetech.com!zygot!thunder!ikluft

Show Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit
X-Google-Thread: 11582c,d9805bca0384fa38,start
X-Google-Attributes: gid11582c,public
X-Google-Thread: 10decc,d9805bca0384fa38,start
X-Google-Attributes: gid10decc,public
X-Google-Thread: fbe10,d9805bca0384fa38,start
X-Google-Attributes: gidfbe10,public
X-Google-ArrivalTime: 2001-02-05 03:08:16 PST
Newsgroups: sbay.general,sbay.sports,ba.bicycles
From: ikluft@thunder.sbay.org (Ian Kluft)
Subject: SBAY Geek Ride 2/5/2001
Distribution: ba
Followup-To: sbay.sports
Supersedes: <geek-ride-373-2@thunder.sbay.org>
Sender: ikluft@thunder.sbay.org (Ian Kluft)
Organization: sbay.org - South Bay/Silicon Valley Community Network
X-Posting-Frequency: on these days of the month - 5, 19
Message-ID: <geek-ride-374-1@thunder.sbay.org>
Date: Mon, 5 Feb 2001 10:23:02 GMT
Path: arc1-ca.pugleaf.net!supernews.google.com!sn-xit-02!sn-xit-01!supernews.com!newsfeed.stanford.edu!news.kjsl.com!news.announcetech.com!zygot!thunder!ikluft
Lines: 233