I'm surprised there aren't any posts concerning the imminent completion of most of the 101 widening through Morgan Hill/South San Jose. This is, perhaps, the most significant road construction project in the bay area since 101 was linked through the area back in the mid-80's. A few questions I'd like to hear opinions on: 1. Do you think people will be more or less likely to want to move to the ultra-South Bay area (Morgan Hill/Gilroy/Hollister) due to the widening of the freeway? 2. What kind of "further ahead effect" do you envision for the morning commute once the road widening is completed? In other words, without the bottleneck, will traffic just jam up through San Jose sooner than it does now? What about southbound in the evening? Will the 152 exit in Gilroy become the next Tully Road exit? What about even further south where 101 slims down to two lanes? 3. Will there ever be a time when three lanes (I'm disregarding the temporary carpool lane) from South San Jose to Gilroy will not be enough? 4. If you commute this way, will you change your commuting time once the widening is complete? Here are my opinions: 1. I believe that those that wish to live in the Morgan Hill/Gilroy/Hollister area already do. However, there might be those out there who loathe the dreaded "merge" and purposely avoid living down there because of it. But I don't think we'll see an immediate influx of people rushing to move down there. 2. Traffic may bottle up a bit sooner through San Jose than it does now. For 101 things get bad around Story Road. For 85 is around Almaden. You'll probably see 101 back up to Tully as a regular thing, but for 85, with those dreaded metering lights, there should be no discernable difference. If anything, the 101 to 85 ramp will be more congested than it is now. But folks driving from the Santa Teresa area north couldn't care less about that. 3. Many of the south bay communities are beginning to become anti-growth, so three lanes through the area should do just fine for, perhaps, the next twenty years. 4. I will change my pattern, but mostly for my evening commute down 85 to 101. In the morning I'll still make sure I leave late enough to avoid the 85/101 metering light. As for the evening, however, and especially on Friday, I might leave earlier since there should be no merge nightmares to deal with anymore.
Re: Highway 101 Widening
Author: Silas Warner
Date: Tue, 11 Feb 2003 02:05
Date: Tue, 11 Feb 2003 02:05
40 lines
2985 bytes
2985 bytes
John Rinck wrote: > > I'm surprised there aren't any posts concerning the imminent completion > of most of the 101 widening through Morgan Hill/South San Jose. > > This is, perhaps, the most significant road construction project in the > bay area since 101 was linked through the area back in the mid-80's. > > A few questions I'd like to hear opinions on: > > 1. Do you think people will be more or less likely to want to move to > the ultra-South Bay area (Morgan Hill/Gilroy/Hollister) due to the > widening of the freeway? > Yes. More important, developers will be far more likely to cover San Benito and Monterey Counties with moderate-priced (ultra-cheap for the South Bay) stucco. > 2. What kind of "further ahead effect" do you envision for the morning > commute once the road widening is completed? In other words, without > the bottleneck, will traffic just jam up through San Jose sooner than it > does now? What about southbound in the evening? Will the 152 exit in > Gilroy become the next Tully Road exit? What about even further south > where 101 slims down to two lanes? The bottlenect just behind 83 sill move to GIlroy. > > 3. Will there ever be a time when three lanes (I'm disregarding the > temporary carpool lane) from South San Jose to Gilroy will not be > enough? > About four months. After that 101 will be just as congested as ever. > 4. If you commute this way, will you change your commuting time once > the widening is complete? > I don't, thank God. Silas Warner
Re: Highway 101 Widening
Author: David desJardins
Date: Tue, 11 Feb 2003 02:28
Date: Tue, 11 Feb 2003 02:28
14 lines
1833 bytes
1833 bytes
Silas Warner writes:
> Yes. More important, developers will be far more likely to cover San
> Benito and Monterey Counties with moderate-priced (ultra-cheap for the
> South Bay) stucco.
> About four months. After that 101 will be just as congested as ever.
If in four months it's just as congested as it is now, why would more
lanes, but exactly the same amount of congestion, affect what builders
and developers do, at all? I would think they would only build/develop
more if there's less congestion and thus those locations are more
attractive for commuters. So it seems your answers lack consistency.
David desJardins
Re: Highway 101 Widening
Author: Ian Kluft
Date: Tue, 11 Feb 2003 04:30
Date: Tue, 11 Feb 2003 04:30
92 lines
5518 bytes
5518 bytes
John Rinck <jrinck@xilinx.com> writes: >I'm surprised there aren't any posts concerning the imminent completion >of most of the 101 widening through Morgan Hill/South San Jose. FYI, more info on the project is here... http://www.vta.org/highways/us101.htm >This is, perhaps, the most significant road construction project in the >bay area since 101 was linked through the area back in the mid-80's. If you commute that way, I wouldn't be surprised that you'd think so. But I'd guess people who use I-680 might say the same thing about the widening just completed there. And I-880 is being widened and improved in patches from Alameda County to San Jose, with the 4-lane "hourglass" segment (101 to Montague) due for completion of its widening later this year. The 880/237 interchange work completed last September was a huge improvement. And the upgrade of the northern segment of Hwy 87 from expressway to freeway will be complete at the end of this year, providing another link between downtown, the airport and the "Golden Triangle" (101/237/880 area) employers. Trying to look at this objectively, all the entrances to Silicon Valley have been chokepoints due to the mountain ranges enclosing the area. Every improvement to those bottlenecks will be cheered by a lot of people using those routes. They're all significant. But since they serve different sets of commuters, it isn't really useful to try to say which is the most significant. 2003 has for some time been expected to be the big year that many of these projects would open a lot of bottlenecks. They're "most significant" as a group of the 1996 Measure A projects finally reaching completion. >A few questions I'd like to hear opinions on: > >1. Do you think people will be more or less likely to want to move to >the ultra-South Bay area (Morgan Hill/Gilroy/Hollister) due to the >widening of the freeway? We usually refer to Morgan Hill to Gilroy as the Coyote Valley, South County or South Valley. I don't expectthe 101 widening to make a big difference there until the economy picks up. There is residential vacancy all over Silicon Valley right now. So the tendency toward long commutes shouldn't return until the valley fills up again. >2. What kind of "further ahead effect" do you envision for the morning >commute once the road widening is completed? In other words, without >the bottleneck, will traffic just jam up through San Jose sooner than it >does now? What about southbound in the evening? Will the 152 exit in >Gilroy become the next Tully Road exit? What about even further south >where 101 slims down to two lanes? Every improvement to the roadways has a combined effect of improving flow/efficiency in that area, and putting more pressure on other points further down the line. But it does increase the total carrying capacity of the roads in the area. One can guess that when the economy turns around, the transit systems' vitality should follow, probably a little behind the curve as government services usually do. So that also adds to the total capacity of the transportation options available. When employment returns to 1999 levels somewhere in the next economic upturn, the valley will be much better able to handle it. >3. Will there ever be a time when three lanes (I'm disregarding the >temporary carpool lane) from South San Jose to Gilroy will not be >enough? Undoubtedly there will. But at the bottom of an economic downturn it's hard to say when that will be, except "when things get better". It won't happen until residential vacancy goes down and the demand allows rents to start increasing significantly again. In the last two economic cycles that has driven people to live out of the area. >4. If you commute this way, will you change your commuting time once >the widening is complete? [...] Sorry, I don't commute that way. I live in the Berryessa district of San Jose and work in Milpitas. Between home and work, I can drive or ride my bicycle. I don't bike much this time of year - I tried that for a while and decided it isn't worth it. When I drive, I often don't take the same route even within the same day, instead optimizing the route each way for more right turns. And when the Tasman East light rail extension opens, I'll use that too, probably often in conjunction with a bicycle. I don't have to get on a freeway if I don't want to, and I-880 is next to useless until the hourglass-section widening is completed. Completion of the I-880 widening later this year and the Tasman East light rail extension in 2004 will each likely change my commute patterns as they expand my range of choices.
Re: Highway 101 Widening
Author: bikerider7
Date: Tue, 11 Feb 2003 19:07
Date: Tue, 11 Feb 2003 19:07
27 lines
2424 bytes
2424 bytes
ikluft@thunder.sbay.org (Ian Kluft) wrote in message news:<HA4n7D.8It@thunder.sbay.org>... > John Rinck <jrinck@xilinx.com> writes: > > >This is, perhaps, the most significant road construction project in the > >bay area since 101 was linked through the area back in the mid-80's. > > If you commute that way, I wouldn't be surprised that you'd think so. > > But I'd guess people who use I-680 might say the same thing about the > widening just completed there. And I-880 is being widened and improved > in patches from Alameda County to San Jose, with the 4-lane "hourglass" > segment (101 to Montague) due for completion of its widening later this > year. The 880/237 interchange work completed last September was a huge > improvement. And the upgrade of the northern segment of Hwy 87 from > expressway to freeway will be complete at the end of this year, providing > another link between downtown, the airport and the "Golden Triangle" > (101/237/880 area) employers. > Indeed, with so much money being spent on monster interchanges, it is hard to say which project is "most significant". A few years ago, the all-time award might have gone to the 680/24 interchange which took a decade to build. But that seems passe now that the VTA plans on widening 101 to a whopping 17 lanes to make room for the new 101/85 interchange. Not to be outdone, Solano county wants to build a new 680/80 interchange -- at a cost of an astounding $1 billion.
Re: Highway 101 Widening
Author: John Rinck
Date: Tue, 11 Feb 2003 21:08
Date: Tue, 11 Feb 2003 21:08
35 lines
2837 bytes
2837 bytes
I think it will take quite a bit of time for the new lanes to become as congested as the old ones. While the south-south bay is a great place to live, like I said, most of the people who want to live here probably already do. As for Hollister, once a breeding ground for new homes and developers, it has stretched beyond capacity and is state-mandated to cease new building until their sewage system can catch up. With Gilroy and Morgan Hill, I don't think either one wants to become the next San Jose (or repeat Hollister's mistakes), so building more homes might be a tough thing to accomplish for developers. And keep in mind that the reason that 101 is such a traffic nightmare has nothing to do with too many cars. The infamous bottleneck was a stupid design from the day it opened. The drive through Gilroy and Morgan Hill is a breeze until you get to the merge. Even at the height of the economic boom the three lane stretch from Gilroy to Morgan Hill was more than adequate. All this widening is doing is fixing a blunder that never should have been made. David desJardins wrote: > Silas Warner writes: > > Yes. More important, developers will be far more likely to cover San > > Benito and Monterey Counties with moderate-priced (ultra-cheap for the > > South Bay) stucco. > > > About four months. After that 101 will be just as congested as ever. > > If in four months it's just as congested as it is now, why would more > lanes, but exactly the same amount of congestion, affect what builders > and developers do, at all? I would think they would only build/develop > more if there's less congestion and thus those locations are more > attractive for commuters. So it seems your answers lack consistency. > > David desJardins
Re: Highway 101 Widening
Author: Steven J. Dorst
Date: Wed, 12 Feb 2003 03:44
Date: Wed, 12 Feb 2003 03:44
37 lines
3501 bytes
3501 bytes
On 11 Feb 2003 11:07:10 -0800, bay_bridge_tgv@yahoo.com (bikerider7) wrote: >ikluft@thunder.sbay.org (Ian Kluft) wrote in message news:<HA4n7D.8It@thunder.sbay.org>... >> John Rinck <jrinck@xilinx.com> writes: >> >> >This is, perhaps, the most significant road construction project in the >> >bay area since 101 was linked through the area back in the mid-80's. >> >> If you commute that way, I wouldn't be surprised that you'd think so. >> >> But I'd guess people who use I-680 might say the same thing about the >> widening just completed there. And I-880 is being widened and improved >> in patches from Alameda County to San Jose, with the 4-lane "hourglass" >> segment (101 to Montague) due for completion of its widening later this >> year. The 880/237 interchange work completed last September was a huge >> improvement. And the upgrade of the northern segment of Hwy 87 from >> expressway to freeway will be complete at the end of this year, providing >> another link between downtown, the airport and the "Golden Triangle" >> (101/237/880 area) employers. >> > >Indeed, with so much money being spent on monster interchanges, >it is hard to say which project is "most significant". A few years ago, >the all-time award might have gone to the 680/24 interchange >which took a decade to build. But that seems passe now that the >VTA plans on widening 101 to a whopping 17 lanes to make room >for the new 101/85 interchange. Not to be outdone, Solano county >wants to build a new 680/80 interchange -- at a cost of an >astounding $1 billion. I wouldn't say that the VTA is PLANNING the new 85/101 interchange, they are actually doing it. My company is a minor vendor for one of the sub-contractors and we have orders in the pipeline for the interchange project. Steven J Dorst <sjdorst@yahoo.nospam.com> aka N6VMK Calling from somewhere North of Alcatraz Remove nospam and one of the dots to reply!!
Re: Highway 101 Widening
Author: Ian Kluft
Date: Wed, 12 Feb 2003 21:34
Date: Wed, 12 Feb 2003 21:34
30 lines
2512 bytes
2512 bytes
>On 11 Feb 2003 11:07:10 -0800, bay_bridge_tgv@yahoo.com (bikerider7) >wrote: >>Indeed, with so much money being spent on monster interchanges, >>it is hard to say which project is "most significant". A few years ago, >>the all-time award might have gone to the 680/24 interchange >>which took a decade to build. But that seems passe now that the >>VTA plans on widening 101 to a whopping 17 lanes to make room >>for the new 101/85 interchange. [...] Steven J. Dorst <sjdorst@yahoo.com> writes: >I wouldn't say that the VTA is PLANNING the new 85/101 interchange, >they are actually doing it. My company is a minor vendor for one of >the sub-contractors and we have orders in the pipeline for the >interchange project. I should point out to everyone that there are two 101/85 interchanges. It sounds like this it referring to the one in Mountain View. But Hwy 85 begins and ends at US101. Their other junction is in South San Jose. In the South Bay, people often disambiguate them by referring to them as "101/85 north" (Mtn View) and "101/85 south" (South SJ), or at least refer to the city where the interchange is. Construction on 101/85 south is reportedly well under way, due for completion in mid-2004. Construction on 101/85 north just got started and is scheduled to go until mid-2005. references: http://www.vta.org/highways/rte85101n.htm http://www.vta.org/highways/rte101s.htm
Re: Highway 101 Widening
Author: Orval Fairbairn
Date: Fri, 14 Feb 2003 00:56
Date: Fri, 14 Feb 2003 00:56
28 lines
2802 bytes
2802 bytes
In article <3E49664F.8E61DDB5@xilinx.com>, John Rinck <jrinck@xilinx.com> wrote: > I think it will take quite a bit of time for the new lanes to become as > congested as the old ones. While the south-south bay is a great place to > live, like I said, most of the people who want to live here probably already > do. As for Hollister, once a breeding ground for new homes and developers, > it has stretched beyond capacity and is state-mandated to cease new building > until their sewage system can catch up. With Gilroy and Morgan Hill, I > don't think either one wants to become the next San Jose (or repeat > Hollister's mistakes), so building more homes might be a tough thing to > accomplish for developers. > > And keep in mind that the reason that 101 is such a traffic nightmare has > nothing to do with too many cars. The infamous bottleneck was a stupid > design from the day it opened. The drive through Gilroy and Morgan Hill is > a breeze until you get to the merge. Even at the height of the economic > boom the three lane stretch from Gilroy to Morgan Hill was more than > adequate. All this widening is doing is fixing a blunder that never should > have been made. You can thank the Sierra Club and Rod Diridon for that one. Sierra Club fought the SJ/Gilroy 101 Freeway for years, while the death toll on Monterey Highway climbed. They finally compromised on a 4-lane freeway, rather than the needed 6-8 lane one. -- To get random signatures put text files into a folder called "Random Signatures" into your Preferences folder.
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads