Article View: sci.electronics.design
Article #110Re: India: Electricity theft & inferior equipment?
From: upsidedown
Date: Fri, 03 Aug 2012 02:28
Date: Fri, 03 Aug 2012 02:28
36 lines
3011 bytes
3011 bytes
On Fri, 03 Aug 2012 06:15:44 +1000, Don McKenzie <5V@2.5A> wrote: >And Inferior equipment? >------------------- > >http://www.brisbanetimes.com.au/opinion/politics/indias-disastrous-blackout-is-a-sign-of-wider-power-failure-20120802-23iad.html > >Serious allegations of corruption resulting in inferior equipment being bought, including high-voltage switch gear and >protection devices, have surfaced in the past. > >The authorities have also been blamed for the hasty implementation of unproven and unreliable technology across the >national grid. As usual, the government dismissed all criticism. In an electric system, the production must be exactly as large as the consumption (+losses). When the consumption increases, the production should increase by the same amount. Failing this, the generator speed will drop, dropping the network frequency and finally the frequency protection in each generator will disconnect the generator from the network. With tripping generators, large unexpected currents will flow in interconnects, finally tripping the line, causing even higher currents in remaining interconnects... If load shedding is not performed quickly, more and more generators and interconnect will trip, causing a constantly spreading network crash. Reading between the lines, it appears as if the regions refused to drop loads, hence the blackout was spreading all over the country. To start a dead network, typically a hydroelectric power plant is spun to nominal speed, some local load added, then the next generator is synchronized to this local network and local load is added to it. This procedure is repeated, until all generators and loads are on-line again. This can take quite a while to spin out some power plants, a SCRAMed nuclear power plant can take a day or two.
Technical Details
Message-ID:
<2hcm18pg17en9rnhepe7lebmmgaai2fin5@4ax.com>Path:
arc1-ca.pugleaf.net!q11ni14328906wiw.1!nntp.google.com!goblin2!goblin.stu.neva.ru!newsfeed1.swip.net!newsfeed3.funet.fi!newsfeeds.funet.fi!feeder2.news.elisa.fi!uutiset.elisa.fi!7564ea0f!not-for-mailReferences:
<a805fhF40hU1@mid.individual.net>Show Full Headers
Complete Article Headers
X-Google-Thread: 103407,25a8fcf4d152253d
X-Google-NewGroupId: yes
X-Google-Attributes: gida5a6238865,domainid0,public,usenet
X-Google-Language: ENGLISH,ASCII-7-bit
Received: by 10.180.98.234 with SMTP id el10mr22177wib.3.1343960904983;
Thu, 02 Aug 2012 19:28:24 -0700 (PDT)
Path: arc1-ca.pugleaf.net!q11ni14328906wiw.1!nntp.google.com!goblin2!goblin.stu.neva.ru!newsfeed1.swip.net!newsfeed3.funet.fi!newsfeeds.funet.fi!feeder2.news.elisa.fi!uutiset.elisa.fi!7564ea0f!not-for-mail
From: upsidedown@downunder.com
Newsgroups: sci.electronics.design,aus.electronics,comp.arch.embedded
Subject: Re: India: Electricity theft & inferior equipment?
Message-ID: <2hcm18pg17en9rnhepe7lebmmgaai2fin5@4ax.com>
References: <a805fhF40hU1@mid.individual.net>
X-Newsreader: Forte Agent 1.92/32.572
MIME-Version: 1.0
Lines: 36
Date: Fri, 03 Aug 2012 05:28:29 +0300
NNTP-Posting-Host: 212.226.75.36
X-Complaints-To: newsmaster@saunalahti.com
X-Trace: uutiset.elisa.fi 1343960904 212.226.75.36 (Fri, 03 Aug 2012 05:28:24 EEST)
NNTP-Posting-Date: Fri, 03 Aug 2012 05:28:24 EEST
Organization: Elisa Customer
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit