🚀 go-pugleaf

RetroBBS NetNews Server

Inspired by RockSolid Light RIP Retro Guy

Article View: sci.electronics.repair
Article #273

Re: Two phases to house - loss of neutral

#273
From: nesesu
Date: Tue, 24 Nov 2009 04:07
33 lines
2532 bytes
On Nov 23, 6:36 pm, "Phil Allison" <phi...@tpg.com.au> wrote:
> "Trevor Wilson"
>
>
>
> > **AFAIK, the US system is fundamentally different to ours.
>
> ** In the US and Canada  -   it is  NOT  permitted to link neutral and earth
> or plumbing within a premises.
>
> See here under the heading "Regulations".
>
> http://en.wikipedia.org/wiki/Earthing_system
>
> The MEN system used here in Australia seems to be unique.
>
> See last para on same page.
>
> .....  Phil

Rubbish. In most of Canada, it is manditory that the neutral be bonded
to earth at only ONE point, the service entrance switch enclosure.
From that point an earth conductor is connected to 2 ground rods and
to any metallic piping system(s).
Neutral failure is a not uncommon problem especially with overhead
aluminum 'triplex' service drops. A seagull deficates on the bare
aluminum neutral and it soon rots off leaving an open neutral
condition.
Ground rod to earth resistances of 5 ohms are not uncommon, so a 10A
unbalance between 'phases' could give a 50V offset of the neutral.

Neil S.
Technical Details
Message-ID: <66979758-2a22-4a09-b7b3-701ffcfa14b0@e4g2000prn.googlegroups.com>
Path: arc1-ca.pugleaf.net!g2news1.google.com!postnews.google.com!e4g2000prn.googlegroups.com!not-for-mail
References: <0083b31e$0$1587$c3e8da3@news.astraweb.com> <7n0tv4F3k3aq7U4@mid.individual.net> <00697e42$0$8185$c3e8da3@news.astraweb.com> <7n0ubbF3k8kq2U4@mid.individual.net> <7n0v5uF3j8n3cU1@mid.individual.net>

Show Full Headers
Complete Article Headers
X-Google-Thread: a5a6238865,dcb8eebd9233b785
X-Google-Attributes: gida5a6238865,public,usenet
X-Google-NewGroupId: yes
X-Google-Language: ENGLISH,ASCII
Path: arc1-ca.pugleaf.net!g2news1.google.com!postnews.google.com!e4g2000prn.googlegroups.com!not-for-mail
From: nesesu <neil_sutcliffe@telus.net>
Newsgroups: sci.electronics.repair,aus.electronics
Subject: Re: Two phases to house - loss of neutral
Date: Mon, 23 Nov 2009 20:07:44 -0800 (PST)
Organization: http://groups.google.com
Lines: 33
Message-ID: <66979758-2a22-4a09-b7b3-701ffcfa14b0@e4g2000prn.googlegroups.com>
References: <0083b31e$0$1587$c3e8da3@news.astraweb.com> <7n0tv4F3k3aq7U4@mid.individual.net> 
 <00697e42$0$8185$c3e8da3@news.astraweb.com> <7n0ubbF3k8kq2U4@mid.individual.net>
 <7n0v5uF3j8n3cU1@mid.individual.net>
NNTP-Posting-Host: 216.232.178.116
Mime-Version: 1.0
Content-Type: text/plain; charset=ISO-8859-1
Content-Transfer-Encoding: quoted-printable
X-Trace: posting.google.com 1259035664 7882 127.0.0.1 (24 Nov 2009 04:07:44 GMT)
X-Complaints-To: groups-abuse@google.com
NNTP-Posting-Date: Tue, 24 Nov 2009 04:07:44 +0000 (UTC)
Complaints-To: groups-abuse@google.com
Injection-Info: e4g2000prn.googlegroups.com; posting-host=216.232.178.116; 
 posting-account=bu8fZAoAAAAFrh3QX0hwsUyXJtD7-Osm
User-Agent: G2/1.0
X-HTTP-UserAgent: Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1; 
 Trident/4.0; .NET CLR 1.1.4322),gzip(gfe),gzip(gfe)