In article <BzGzsI.1u4@chinet.chi.il.us>, drx@chinet.chi.il.us (Scott Whittle) writes:
> Ok I'll bite. How does the railroad control the crossing gates? Here in
> Illinois, Chicago and NorthWestern changed over the technology at the
> crossings about 2 years ago and have had major problems ever since. Gates
> come down and stay down without a coming locomotive. Once I watch the gates
> come down when the train (albeit moving about 3mpg) was about 25 feet from the
> intersection.
>
> I've also noticed that commuter trains will cause the about 5 gates to come
> down ahead, but a freighter will only bring down 3 ahead. Anybody will
> any knowledge they would like to share???
A dozen years ago I worked for a Kansas City based firm that sold railroad
trafic control systems. In a nutshell, the way the systems worked then was
that a train would cause a short as it rolled over certain pieces of track.
This would cause the gates to drop. (In the field behind our plant there
was a crossing gate going through a "life time" test. Twenty four hours
a day it would go up and down, up and down, up and down. They had a twelve
foot fence topped with barbed wire because the local kids used to grab on
and ride the gate.)
The dispatchers would sit and watch a light board that showed where each train
was and the status of each switch. It took quite a few seconds to send a
signal to throw a switch before it propagated through the antique relays
in the field, performed the action, and returned a signal. It was real-time
processing where events could take minutes to transpire.
Of course, all this was running on a PDP-11/34. Ah, the good old days!
Andrew MacRae
ps: Do you know what is different about the Chicago Northwestern line than
all the other major railroad lines in the US?
Technical Details
Message-ID:
<ljbvo0INNpg@jethro.Corp.Sun.COM>Path:
arc1-ca.pugleaf.net!sparky!uunet!zaphod.mps.ohio-state.edu!cs.utexas.edu!sun-barr!news2me.EBay.Sun.COM!jethro.Corp.Sun.COM!Sun.COM!acmReferences:
<BzGzsI.1u4@chinet.chi.il.us>Show Full Headers
Complete Article Headers
Path: arc1-ca.pugleaf.net!sparky!uunet!zaphod.mps.ohio-state.edu!cs.utexas.edu!sun-barr!news2me.EBay.Sun.COM!jethro.Corp.Sun.COM!Sun.COM!acm From: acm@Sun.COM (Andrew MacRae) Newsgroups: sci.electronics Subject: Re: Railroad crossing gates -the ups and downs??? Date: 21 Dec 1992 17:29:36 GMT Organization: Sun Microsystems, Mountain View CA Lines: 36 Distribution: world Message-ID: <ljbvo0INNpg@jethro.Corp.Sun.COM> References: <BzGzsI.1u4@chinet.chi.il.us> Reply-To: acm@Sun.COM (Andrew MacRae) NNTP-Posting-Host: grendal.corp.sun.com