Article View: sci.electronics
Article #6529Re: project design/build time (repost)
From: Jim Smith
Date: Fri, 11 Sep 1992 20:42
Date: Fri, 11 Sep 1992 20:42
26 lines
2044 bytes
2044 bytes
In sci.electronics, johnh@macadam.mpce.mq.edu.au (John Haddy) writes: >I suspect that the local news feed chewed up my last attempt to post this. If it >didn't then please forgive the repeat post! >If you've seen this before, I promise that this will be the last time! I truly >expected that the the topic would arouse at least _some_ interest, however I've >only had one reply (from nearby), leading me to suspect that the original post >did't get very far. I saw the original post, but didn't respond because of the difficulty of answering the question. You essentially ask, "how long will it take to build a project that takes longer than a week or so to build?" My flip answer is, of course, longer than a week or so. The problem of scheduling is always a difficult one, and it's not something that can be determined simply, or usually with much accuracy at all. Projects that I have worked on take anywhere from a few hours to years. Clearly, your question excludes the "trivial" tasks, but the range is still huge. So the question is almost impossible to answer in the general terms in which you're asking it. I think it might be possible for people reading this group to estimate how long it might have taken for them to do something if given more details than you've given. Perhaps if you would give more details of the projects in question, without giving any expected or realized times, someone might have a chance of estimating it. Frankly, though, it sounds like your organization is in need of better methods of evaluating employee's performance. - Jim
Technical Details
Message-ID:
<1840071@hpsad.sad.hp.com>Path:
arc1-ca.pugleaf.net!sparky!uunet!sun-barr!cs.utexas.edu!sdd.hp.com!scd.hp.com!hplextra!hpl-opus!hpnmdla!hpsad!smithjReferences:
<1992Sep10.231958.16925@mailhost.ocs.mq.edu.au>Show Full Headers
Complete Article Headers
From: smithj@hpsad.sad.hp.com (Jim Smith) Date: Fri, 11 Sep 1992 20:42:27 GMT Subject: Re: project design/build time (repost) Message-ID: <1840071@hpsad.sad.hp.com> Organization: HP Signal Analysis Division - Rohnert Park, CA Path: arc1-ca.pugleaf.net!sparky!uunet!sun-barr!cs.utexas.edu!sdd.hp.com!scd.hp.com!hplextra!hpl-opus!hpnmdla!hpsad!smithj Newsgroups: sci.electronics References: <1992Sep10.231958.16925@mailhost.ocs.mq.edu.au> Lines: 27