                             SPACE SHUTTLE STATUS REPORT
                             Wednesday, January 20, 1993


          George H. Diller
          Kennedy Space Center
          407/867-2468


          Vehicle: OV-102/Columbia
          Current location: OPF Bay 2
          Mission: STS-55/Spacelab D-2           Inclination: 28.45 degrees
          Launch timeframe: February, wk 4       Nominal Landindg Site: KSC
          Mission Duration: 8 days 22 hours      Crew Size: 7


          IN WORK TODAY:

          - installation of Spacelab tunnel
          - hydraulic test of flight controls
          - position flight control elements for rollover
          - orbiter/external tank door functional test
          - orbiter aft compartment closeouts
          - orbiter mid-body closeouts

          WORK COMPLETED:

          - Spacelab D-2 Interface Verification Test (IVT)
          - payload bay cleaning
          - ammonia boiler servicing


          WORK SCHEDULED:

          - payload bay door radiator inspections Saturday
          - Crew Equipment Interface Test on Sunday


          SPECIAL TOPICS--Endeavour post landing analysis:

               OV-105 touched down at 08:38:17 a.m. EST on Tuesday, landing
          approximately 1,500 feet from  the  Runway  33  threshhold  about
          three  feet  right  of centerline,  and rolling out approximately
          8,700 feet.

               Brake and tire wear was normal, except for a cut 5/16th-inch
          deep and two plys of scuffing on the right inboard tire.    There
          were 57 debris impacts,  with 13 greater than one inch.   Four to
          five tiles are expected to be replaced.

               Endeavour arrived at OPF Bay 1 at approximately 2 p.m. Tues-
          day where deservicing is now in work.
Thread Navigation

This is a paginated view of messages in the thread with full content displayed inline.

Messages are displayed in chronological order, with the original post highlighted in green.

Use pagination controls to navigate through all messages in large threads.

Back to All Threads