Thread View: sci.space.news
1 messages
1 total messages
Started by Ron Baalke
Wed, 27 Jan 1993 01:15
Galileo Update - 01/26/93
Author: Ron Baalke
Date: Wed, 27 Jan 1993 01:15
Date: Wed, 27 Jan 1993 01:15
26 lines
1948 bytes
1948 bytes
Forwarded from Bill O'Neil, Galileo Project Manager
GALILEO STATUS REPORT
January 26, 1993
The Galileo Spacecraft is operating normally in the all-spin mode at
2.9 rpm, and is transmitting coded telemetry at 1200 bps (bits/second).
Yesterday, the AACS (Attitude and Articulation Control Subsystem)
in-flight mode related activites began and proceeded nominally. Tracking was
scheduled DSS-14 (Goldstone 70 meter antenna), DSS-43 (Canberra 70 meter
antenna) and DSS-63 (Madrid 70 meter antenna).
Today, January 26, 1993, the AACS in-flight mode related activities are
continuing with a nominal completion date of January 29, 1993. Tracking is
scheduled over DSS-14, DSS-43 and DSS-63
Tomorrow, the AACS in-flight mode related activities will continue with
the loading of the memory A with AACS 12.0 flight software, as scheduled.
Tracking is scheduled over DSS-14, DSS-43 and DSS-63
___ _____ ___
/_ /| /____/ \ /_ /| Ron Baalke | baalke@kelvin.jpl.nasa.gov
| | | | __ \ /| | | | Jet Propulsion Lab |
___| | | | |__) |/ | | |__ M/S 525-3684 Telos | Every once in a while,
/___| | | | ___/ | |/__ /| Pasadena, CA 91109 | try pushing your luck.
|_____|/ |_|/ |_____|/ |
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads