Thread View: sci.space.news
1 messages
1 total messages
Started by Ron Baalke
Thu, 28 Jan 1993 01:16
Shuttle Status for 01/27/93 (Forwarded)
Author: Ron Baalke
Date: Thu, 28 Jan 1993 01:16
Date: Thu, 28 Jan 1993 01:16
61 lines
2506 bytes
2506 bytes
SPACE SHUTTLE STATUS REPORT
Wednesday, January 27, 1993
George H. Diller
Kennedy Space Center
407/867-2468
Vehicle: OV-102/Orbiter Columbia Location: OPF Bay 2
Primary payload: Spacelab D-2 Crew Size: 7
Launch timeframe: NET Feb. 25 10:30 a.m.
Mission duration: 8 Days 22 Hours Nominal Landing Site: KSC
Inclination: 28.45 degrees Orbital altitude: 184 sm
STS-55 IN WORK:
- Spacelab module positive pressure check
- crew compartment closeouts/close crew access hatch
- orbiter aft main engine compartment closeouts
- main propulsion system closeouts
- orbiter mid-body closeouts
- thermal protection system tile closeouts
STS-55 WORK COMPLETED:
- external tank door functional test
- payload bay door functional test
- avionics bay closeouts
STS-55 WORK SCHEDULED:
- remove BREMSAT GAS canister
- close payload bay doors on Saturday evening
- aft structural leak check/orbiter composite pressurization test
- weight and center of gravity determination
- install Columbia on orbiter transporter
- roll to the VAB evening of February 2
- mate to external tank/solid rocket boosters February 3
# #
___ _____ ___
/_ /| /____/ \ /_ /| Ron Baalke | baalke@kelvin.jpl.nasa.gov
| | | | __ \ /| | | | Jet Propulsion Lab |
___| | | | |__) |/ | | |__ M/S 525-3684 Telos | Every once in a while,
/___| | | | ___/ | |/__ /| Pasadena, CA 91109 | try pushing your luck.
|_____|/ |_|/ |_____|/ |
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads