Thread View: sci.space.news
1 messages
1 total messages
Started by Ron Baalke
Thu, 28 Jan 1993 01:15
Galileo Update - 01/27/93
Author: Ron Baalke
Date: Thu, 28 Jan 1993 01:15
Date: Thu, 28 Jan 1993 01:15
27 lines
2000 bytes
2000 bytes
Forwarded from Bill O'Neil, Galileo Project Manager
GALILEO STATUS REPORT
January 27, 1993
The Galileo Spacecraft is operating normally in the all-spin mode at
2.9 rpm, and is transmitting coded telemetry at 1200 bps (bits/second).
Yesterday, the AACS (Attitude and Articulation Control Subsystem)
in-flight mode related activities continued with a nominal completion date of
January 29, 1993. Tracking was scheduled over DSS-14 (Goldstone 70 meter
antenna), DSS-43 (Canberra 70 meter antenna) and DSS-63 (Madrid 70 meter
antenna).
Today, January 27, 1993, the AACS in-flight mode related activities are
continuing with the loading of the memory A with AACS 12.0 flight software in
progress. Tracking is scheduled over DSS-14, DSS-43 and DSS-63
Tomorrow, the AACS in-flight mode related activities will continue
with the loading of memory B with AACS 12.0 flight software scheduled.
Tracking is scheduled over DSS-14, DSS-43 and DSS-63
___ _____ ___
/_ /| /____/ \ /_ /| Ron Baalke | baalke@kelvin.jpl.nasa.gov
| | | | __ \ /| | | | Jet Propulsion Lab |
___| | | | |__) |/ | | |__ M/S 525-3684 Telos | Every once in a while,
/___| | | | ___/ | |/__ /| Pasadena, CA 91109 | try pushing your luck.
|_____|/ |_|/ |_____|/ |
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads