Thread View: sci.space.news
1 messages
1 total messages
Started by Ron Baalke
Mon, 11 Jan 1993 19:13
Galileo Update - 01/11/93
Author: Ron Baalke
Date: Mon, 11 Jan 1993 19:13
Date: Mon, 11 Jan 1993 19:13
28 lines
2034 bytes
2034 bytes
Forwarded from Bill O'Neil, Galileo Project Manager
GALILEO STATUS REPORT
January 11, 1993
The Galileo Spacecraft is operating normally in the all-spin mode and
is transmitting coded telemetry at 1200 bps (bits/second).
Over the weekend, no spacecraft activity was scheduled. Tracking was
scheduled over DSS-43 (Canberra 70 meter antenna).
Today, January 11, 1993, real-time commands are being sent to update
system fault protection prior to start of the warming turn. The warming turn
to a 45 degree off-sun attitude is scheduled to begin at 11:41 AM PST and
complete at 11:52 AM PST. Real-time commands are then scheduled to modify
the thermal safing response to system fault protection. Real-time motor
hammering commands are then scheduled to be sent. Tracking is scheduled over
DSS-43 and DSS-63 (Madrid 70 meter antenna).
Tomorrow, real-time motor hammering commands are scheduled to be sent.
Tracking is scheduled over DSS-43 and DSS-63.
___ _____ ___
/_ /| /____/ \ /_ /| Ron Baalke | baalke@kelvin.jpl.nasa.gov
| | | | __ \ /| | | | Jet Propulsion Lab |
___| | | | |__) |/ | | |__ M/S 525-3684 Telos | Choose a job you love, and
/___| | | | ___/ | |/__ /| Pasadena, CA 91109 | you'll never have to work
|_____|/ |_|/ |_____|/ | a day in your life.
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads