🚀 go-pugleaf

RetroBBS NetNews Server

Inspired by RockSolid Light RIP Retro Guy

1 total messages Started by Peter Yee Mon, 11 Jan 1993 21:16
Shuttle Status for 01/11/93 (Forwarded)
#1112
Author: Peter Yee
Date: Mon, 11 Jan 1993 21:16
71 lines
3282 bytes
                             SPACE SHUTTLE STATUS REPORT
                             Kennedy Space Center, Florida

                             Monday, January 11, 1993


          George H. Diller
          407/867-2468

          Vehicle: OV-105/Endeavour   Mission Number: STS-54
          Location: Launch Pad 39-B
          Primary Payload: TDRS-F/IUS-13 + Diffuse X-ray Spectrometer (DXS)
          Launch Timeframe: January 13  8:52 a.m. EST
          Mission Duration: 5 Days 23 Hours 33 Minutes
          Inclination: 28.45 degrees   Crew Size: 5
          Nominal Landing: KSC  Jan. 19  8:24 a.m. EST


          IN WORK TODAY:

          - Launch countdown operations in Firing Room 3
          - cryogenic reactant loading operations until 4:30 p.m.
          - main engine final preparations
          - IUS battery voltage checks
          - communications system activation
          - inertial measurement unit checkout
          - potable water microbial sample
          - commander and pilot Shuttle Training Aircraft flights
          - astronaut fit checks of launch and entry suits

          WORK COMPLETED:

          - astronaut arrival at KSC 3:30 p.m. Sunday
          - payload bay door closure at 7:10 p.m. on Sunday night
          - navigation aids activation
          - pad washdown and initial debris inspections
          - mass memory unit checkout


          STS-54 WORK SCHEDULED:

          - demate orbiter mid-body umbilical tonight
          - install flight crew mission items and personal effects tonight
          - closeout tail service masts on Tuesday
          - retract rotating service structure 11 a.m. Tuesday
          - final launch pad debris insepctions Tuesday
          - payload mid-deck late stowage including rodents Tuesday
          - IUS guidance system calibration Tuesday night
          - activate inertial measurement units Tuesday night
          - check main engine steering (gimbal check) Tuesday night
          - begin external tank fueling loading 12:32 a.m. Wednesday


          ISSUES & CONCERNS: None


          SPECIAL TOPICS: Launch Weather Forecast

          At the opening of the launch window at 8:52 a.m. on Wednesday
          conditions are forecast to be:

          Temperature: 67 degrees
          Dewpoint: 61 degrees
          Humidity: 80%
          Wind:  SSW-8 knots
          Visibility: 7+ miles

          Significant clouds or weather: Chance of showers and cloud
          ceilings below 8,000 feet.

          Chance of acceptable launch weather conditions: 70%
Thread Navigation

This is a paginated view of messages in the thread with full content displayed inline.

Messages are displayed in chronological order, with the original post highlighted in green.

Use pagination controls to navigate through all messages in large threads.

Back to All Threads