Article View: sci.space.shuttle
Article #6066Shuttle Status for 12/18/89 (Forwarded)
From: Peter E. Yee
Date: Mon, 18 Dec 1989 20:23
Date: Mon, 18 Dec 1989 20:23
43 lines
2448 bytes
2448 bytes
KSC SHUTTLE STATUS REPORT - MONDAY, DEC. 18, 1989
STS-32 - COLUMBIA (OV 102) - PAD 39-A
This weekend, ordnance devices were installed on the vehicle
and the power reactant storage and distribution system dewars at
the pad were loaded with liquid oxygen and liquid hydrogen
propellants.
Today, work continues to validate systems at Pad 39-A to be
used in loading liquid oxygen and liquid hydrogen propellants
into the orbiter's onboard storage tanks. One of the major pieces
of equipment being validated is the Orbiter Midbody Umbilical
Unit (OMBUU) at the Pad used to service the orbiter with
propellants during the launch countdown.
Closeouts of the aft compartment, external tank intertank
and solid rocket booster integrated electronic assemblies are
underway. The launch date for mission STS-32 is being evaluated.
STS-36 - ATLANTIS (OV 104) - OPF BAY 1
Testing of the right orbital maneuvering system pod has been
completed to date. A crew equipment interface test was conducted.
Installation of the three main engines was performed. This week,
interface verifcation tests of the main engines are planned.
STS-33 - DISCOVERY (OV 103) - OPF BAY 2
Power up post-flight systems testing and inspections are
scheduled this week.
STS-36 SOLID ROCKET BOOSTERS - VAB
Joint closeouts of the right center and forward field joints
are underway. Booster stacking operations were completed last
week and measurements of the alignment were completed.
STS-31 SOLID ROCKET BOOSTERS - VAB
Stacking operations are starting with the left aft booster
in the VAB today.
Technical Details
Message-ID:
<38437@ames.arc.nasa.gov>Path:
arc1-ca.pugleaf.net!utzoo!attcan!uunet!samsung!think!ames!trident.arc.nasa.gov!yeeShow Full Headers
Complete Article Headers
Path: arc1-ca.pugleaf.net!utzoo!attcan!uunet!samsung!think!ames!trident.arc.nasa.gov!yee From: yee@trident.arc.nasa.gov (Peter E. Yee) Newsgroups: sci.space.shuttle Subject: Shuttle Status for 12/18/89 (Forwarded) Message-ID: <38437@ames.arc.nasa.gov> Date: 18 Dec 89 20:23:49 GMT Sender: usenet@ames.arc.nasa.gov Reply-To: yee@trident.arc.nasa.gov (Peter E. Yee) Organization: NASA Ames Research Center, Moffett Field, CA Lines: 43