Article View: sci.space
Article #6680Re: DC cost estimates
From: John Roberts
Date: Thu, 31 Dec 1992 13:45
Date: Thu, 31 Dec 1992 13:45
31 lines
2057 bytes
2057 bytes
-From: gary@ke4zv.uucp (Gary Coffman) -Subject: Re: Latest Pegasus news? -Date: 31 Dec 92 00:45:13 GMT -Organization: Destructive Testing Systems -In article <1992Dec27.203327.21241@iti.org> aws@iti.org (Allen W. Sherzer) writes: [Debate on cost of DC.] -You misrepresent my position. All I'm saying is that new systems are -rarely as cheap and easy in metal as they are on paper. That's what -research and development programs are designed to discover. Only a few -things that pass through development ever reach mass production as -cheap and troublefree as they were on paper. Allen generally takes projected "worst-case" cost estimates for DC and multiplies them by two or more in making his calculations, which I think shows he is aware of the problem. That the results still come out favorable to DC is an indication that work on DC should be continued. (I presume you favor that.) I should make one additional point regarding Allen's calculations - they don't include the large opportunity cost if the Shuttle program should be cancelled before DC is fully operational (and able to handle the full operational capabilities of the Shuttle, if that ever happens). Doing so would add a considerable amount to the cost estimates for DC. So I consider Allen's calculations to be reasonable, provided that the Shuttle program is allowed to continue while DC is being developed. John Roberts roberts@cmr.ncsl.nist.gov
Technical Details
Message-ID:
<C04M9F.58D.1@cs.cmu.edu>Path:
arc1-ca.pugleaf.net!sparky!uunet!ogicse!das-news.harvard.edu!cantaloupe.srv.cs.cmu.edu!crabapple.srv.cs.cmu.edu!roberts@cmr.ncsl.nist.govShow Full Headers
Complete Article Headers
Path: arc1-ca.pugleaf.net!sparky!uunet!ogicse!das-news.harvard.edu!cantaloupe.srv.cs.cmu.edu!crabapple.srv.cs.cmu.edu!roberts@cmr.ncsl.nist.gov From: roberts@cmr.ncsl.nist.gov (John Roberts) Newsgroups: sci.space Subject: Re: DC cost estimates Message-ID: <C04M9F.58D.1@cs.cmu.edu> Date: 31 Dec 92 13:45:29 GMT Article-I.D.: cs.C04M9F.58D.1 Sender: news+@cs.cmu.edu Distribution: sci Organization: National Institute of Standards and Technology formerly National Bureau of Standards Lines: 31 Approved: bboard-news_gateway X-Added: Forwarded by Space Digest Original-Sender: isu@VACATION.VENARI.CS.CMU.EDU