Article View: sci.space
Article #6734Re: Let's be more specific (was: Stupid Shut Cost arguements)
From: Pat
Date: Fri, 01 Jan 1993 23:56
Date: Fri, 01 Jan 1993 23:56
43 lines
2384 bytes
2384 bytes
In article <1993Jan1.030602.21051@ke4zv.uucp> gary@ke4zv.UUCP (Gary Coffman) writes: > >If DC flies with anything like the performance and costs that are >projected, it will be a big commercial success. I think those >numbers are still optimistic and that the program risks are still >large, however. Shuttle was a cheap $300 a pound launcher when it >was a paper airplane too. Even with a 3X stretchout of development time, >and a 3X increase in projected costs, it'll beat government run Shuttle >costs, but would have trouble against actual Shuttle costs if Shuttle >were run under comparable commercial rules. What I'm saying in a nutshell >is that the proposed DC is expected to be cheaper than the operating Shuttle >because they are required to operate in different manners by law and by >government and corporate culture. Thus your Shuttle bashing rightfully >should be government operating methods bashing. I'll happily join you in >*that*. Government can't do anything as efficiently as the private sector. > Gary, The operating methods of any stackable vehicle are going to significantly different from a recoverable single stage vehicle. You keep arguing that the russians have high costs for their stackables, and that ariane has high costs subsidized by the government. I know you believe that cheap stackables can be done, but those are the same paper designs you condemn DC for. Shuttle could have lower costs then NASA currently has, but it still needs a tremendous infrastructure. The OPF, the VAB, Tilting bay, the crawler/transporter. Launch towers. The DC will not need much more infrastructure, then a airline hangar. Henry, alan and I all believe that eliminating all this structure and cost will make up for any lower vehicle lift capacity. Please demonstrate how Lockheed could eliminate all these costs from commercial shuttle operations. pat
Technical Details
Message-ID:
<1i2lnqINN50b@mirror.digex.com>Path:
arc1-ca.pugleaf.net!sparky!uunet!digex.com!prbReferences:
<1992Dec28.172953.26161@ke4zv.uucp> <1992Dec28.202920.5932@iti.org> <1993Jan1.030602.21051@ke4zv.uucp>Show Full Headers
Complete Article Headers
Path: arc1-ca.pugleaf.net!sparky!uunet!digex.com!prb From: prb@access.digex.com (Pat) Newsgroups: sci.space Subject: Re: Let's be more specific (was: Stupid Shut Cost arguements) Date: 1 Jan 1993 23:56:42 GMT Organization: UDSI Lines: 43 Message-ID: <1i2lnqINN50b@mirror.digex.com> References: <1992Dec28.172953.26161@ke4zv.uucp> <1992Dec28.202920.5932@iti.org> <1993Jan1.030602.21051@ke4zv.uucp> NNTP-Posting-Host: access.digex.com