Article View: sci.space
Article #6750Re: What was NASA thinking?
From: wingo%cspara.decnet
Date: Sat, 02 Jan 1993 22:54
Date: Sat, 02 Jan 1993 22:54
49 lines
2970 bytes
2970 bytes
In article <1992Dec31.172110.10616@cs.ucf.edu>, clarke@next1.acme.ucf.edu () writes... >9Wanting to refresh my somewhat rusty remembrance of things rocket, > [stuff deleted] >Now, I have been led to believe that the SSME is a large >advance over previous engines. The above seems to imply >that with a little work the 6 J-2s could have powered >the shuttle quite nicely. Perhaps a 6:1 mixture would have >given it the same Isp as SSME - the J-2 thrust and thrust/weight >would have then been 246,000 lbs and 71.5. > >Now, the F-1 does not replace an SRB one for one, but its >no too far off. Given its good record maybe the F-1 could >have been rerated to 135% throttle to equal the SRB. > The F1A Engine has been qualified to a flight thrust of 1.75 million lbs. On the test stand at NASA Marshall Space Flight center the original F1's were fired to 110% of rated thrust to establish emergency margins (1.65 million lbs). It is a heck of an engine. >Hence the question in the title of my post: What was NASA >thinking about? Apparently the Saturn engines could have >been used to build the shuttle vehicle. Why weren't they? > >A shuttle with 5 or 6 J-2s using 2 uprated F-1s in the recoverable >boosters would have taken advantage of a history of literally >dozens of successful flight firings. Plus there would >have been a much wider range of abort modes. > >Happy new year. Let's hope for more rational future designs Tom what you are describing IS the original shuttle idea, except that they wanted to reduce the number of engines and realize "cost savings and airline type reservicing of the engines". Sound familiar? The original Shuttle would have basicially been the upper stages of a flyback modification of the Saturn V first stage. The shuttle with its high ISP LOX/H2 engines would have been the upper stage. This was the plan before the congressional budget office and the Office of Budget and Managment (Caspar Weinburger) got ahold of the shuttle budget. In order to lower the costs of developemnt to the mandated development budget, the operational costs of the shuttle were sacrificed. Wales Larrison posted a wonderful summary of the idiocy that ended up with the politicans designing the shuttle instead of the rocket scientists. Most of the problems that Allen so crys about are the result of that ill considered budget process. Dennis, University of Alabama in Huntsville
Technical Details
Message-ID:
<2JAN199316544795@judy.uh.edu>Path:
arc1-ca.pugleaf.net!sparky!uunet!usc!zaphod.mps.ohio-state.edu!menudo.uh.edu!judy.uh.edu!st17aReferences:
<1992Dec31.172110.10616@cs.ucf.edu>Show Full Headers
Complete Article Headers
Path: arc1-ca.pugleaf.net!sparky!uunet!usc!zaphod.mps.ohio-state.edu!menudo.uh.edu!judy.uh.edu!st17a From: wingo%cspara.decnet@Fedex.Msfc.Nasa.Gov Newsgroups: sci.space Subject: Re: What was NASA thinking? Date: 2 Jan 1993 16:54 CST Organization: University of Houston Lines: 50 Sender: st17a@judy.uh.edu (University Space Society) Distribution: world Message-ID: <2JAN199316544795@judy.uh.edu> References: <1992Dec31.172110.10616@cs.ucf.edu> NNTP-Posting-Host: judy.uh.edu News-Software: VAX/VMS VNEWS 1.41