Article View: sci.space
Article #6974Re: Latest Pegasus news?
From: Edward V. Wright
Date: Mon, 04 Jan 1993 21:27
Date: Mon, 04 Jan 1993 21:27
63 lines
4168 bytes
4168 bytes
In <1993Jan4.174720.11639@ke4zv.uucp> gary@ke4zv.uucp (Gary Coffman) writes: >Yeah, I'm saying a factor of two isn't enough to cover the likely >stretchout in the development timeline as problems appear. I said >in the other post that realistic numbers based on other new spacecraft >development programs would be a tripling of MacDD's projected base costs >and a tripling of their projected development timeline. That would still >be cheaper than the monsterous delays and costs of Shuttle development. Oh? What new spacecraft are you talking about? Apollo came in on time and under budget. If the time line had been tripled, we wouldn't have landed on the Moon until 1991. (Assuming the project wasn't cancelled in the interim, as it almost certainly would have been.) >I think *everyone* agrees that the Shuttle development program was about >as badly managed as is possible while still getting a working system in >the end. But, Gary, the Shuttle is the quintessential example of the engineering management philosophy you espouse. The ridiculous Rogers Commission report to the contrary, the Shuttle program was not "success oriented." It was a failure-seeking program if there ever was one. As it turns out, both approaches work about equally well. The success- oriented approach generally produces success. The failure-seeking approach generally produces failure. Not a bad result in the eyes of government employees for whom failure and delay spell lifetime job security. The only thing is, some of us really prefer success. >I think comparisons to new airliner construction, such as the references >to the progression of the 7xx series, is bogus because SSTO is attempting >something no other craft has ever done, Bogus right back at you, dude. Every aircraft is designed to do something no other aircraft has done before. If an existing aircraft could do the same job, no one would bother designing a new one. >with an engineering team that has no experience with similar reusable >spacecraft to draw on. Next to Boeing, McDonnell Douglas's engineering teams probably have more experience designing commercial aerospace products than any company in the world. Practically all of them reuseable. I can almost hear you sucking breath every time you type the phrase "reuseable spacecraft." Strangely enough, you don't have the same reaction to the phrase "reuseable aircraft." Perhaps because you don't know enough history to realize how much engineering and development the first commercial aircraft required. Or perhaps you know how silly you'd sound if you spoke about aircraft development in the same apocolyptic terms. But mainly, I think, it's just the technological superstition, which NASA has helped to instill, about anything connected with "space." After so many years of seeing the way NASA spends money, you believe there's just *got* to be a good reason for it; anything connected with space must be at least an order of magnitude more difficult to do. When you hear that a vehicle is going to operate in space, without any air outside, the superstition takes over, and you believe that the principles of engineering that govern other aerospace systems don't apply.
Technical Details
Message-ID:
<ewright.726182846@convex.convex.com>Path:
arc1-ca.pugleaf.net!sparky!uunet!spool.mu.edu!yale.edu!qt.cs.utexas.edu!cs.utexas.edu!hermes.chpc.utexas.edu!news.utdallas.edu!convex!ewrightReferences:
<1992Dec27.203327.21241@iti.org> <1992Dec31.004513.12224@ke4zv.uucp> <ewright.725820266@convex.convex.com> <1992Dec31.182405.7430@iti.org> <1993Jan4.174720.11639@ke4zv.uucp>Show Full Headers
Complete Article Headers
Newsgroups: sci.space
Path: arc1-ca.pugleaf.net!sparky!uunet!spool.mu.edu!yale.edu!qt.cs.utexas.edu!cs.utexas.edu!hermes.chpc.utexas.edu!news.utdallas.edu!convex!ewright
From: ewright@convex.com (Edward V. Wright)
Subject: Re: Latest Pegasus news?
Sender: usenet@news.eng.convex.com (news access account)
Message-ID: <ewright.726182846@convex.convex.com>
Date: Mon, 4 Jan 1993 21:27:26 GMT
References: <1992Dec27.203327.21241@iti.org> <1992Dec31.004513.12224@ke4zv.uucp> <ewright.725820266@convex.convex.com> <1992Dec31.182405.7430@iti.org> <1993Jan4.174720.11639@ke4zv.uucp>
Nntp-Posting-Host: bach.convex.com
Organization: Engineering, CONVEX Computer Corp., Richardson, Tx., USA
X-Disclaimer: This message was written by a user at CONVEX Computer
Corp. The opinions expressed are those of the user and
not necessarily those of CONVEX.
Lines: 70