🚀 go-pugleaf

RetroBBS NetNews Server

Inspired by RockSolid Light RIP Retro Guy

Article View: sci.space
Article #7049

Re: DC-1 eventual construction question...

#7049
From: Edward V. Wright
Date: Tue, 26 Jan 1993 05:44
34 lines
2288 bytes
In <1993Jan26.024338.10181@iti.org> aws@iti.org (Allen W. Sherzer) writes:

>If Uncle Sam doesn't pay for the initial development of the Y vehicle
>(and possibly DC1) it won't happen. Period.

That is by no means certain.  Lockheed was ready to proceed with an 
SSTO using its own money, if the government was willing to get out
of the way.  Grumman was prepared to go ahead with the development
of a smaller, commercial SSTO (Frequent Flyer) using its own funds, 
if SDIO had selected its proposal for the suborbital demonstration 
phase.  Boeing is prepared to go ahead with an SSTO project, if it
can be shown what the markets are.  

McDonnell Douglas found that the Japanese were willing to finance
the development of DC-Y, provided they got access to the technology
as well as a piece of the action (something the US State Department
would probably never allow).


>One DC-1 would be enough for almost all of the current launch market.

That's because you're looking at the wrong market.  Any vehicle that
can reach orbit, single-staged, can reach Japan or Tokyo as well.  There
is a market for fast transportation, for people as well as cargo.  Beyond
that, space tourism is a major market -- much more so than the satellite
launch market, according to G. Harry Stine.


>BTW, it turns out that at least two other contractors have developed
>SSTO designs. 

Five that I'm aware of, if you include assisted (air-launched) single-
stage-to-orbit.  (I assume you're limiting yourself to designs produced
in the last couple years.)
Technical Details
Message-ID: <ewright.728027076@convex.convex.com>
Path: arc1-ca.pugleaf.net!sparky!uunet!cs.utexas.edu!convex!convex!ewright
References: <1993Jan21.141726.1@max.u.washington.edu> <1993Jan26.024338.10181@iti.org>

Show Full Headers
Complete Article Headers
Newsgroups: sci.space
Path: arc1-ca.pugleaf.net!sparky!uunet!cs.utexas.edu!convex!convex!ewright
From: ewright@convex.com (Edward V. Wright)
Subject: Re: DC-1 eventual construction question...
Sender: usenet@news.eng.convex.com (news access account)
Message-ID: <ewright.728027076@convex.convex.com>
Date: Tue, 26 Jan 1993 05:44:36 GMT
References: <1993Jan21.141726.1@max.u.washington.edu> <1993Jan26.024338.10181@iti.org>
Nntp-Posting-Host: bach.convex.com
Organization: Engineering, CONVEX Computer Corp., Richardson, Tx., USA
X-Disclaimer: This message was written by a user at CONVEX Computer
              Corp. The opinions expressed are those of the user and
              not necessarily those of CONVEX.
Lines: 37