Article View: sci.space
Article #9189Payload Status for 12/21/89 (Forwarded)
From: Peter E. Yee
Date: Thu, 21 Dec 1989 22:32
Date: Thu, 21 Dec 1989 22:32
32 lines
1641 bytes
1641 bytes
Daily Status/KSC Payload Management and Operations 12-21-89
- STS-31R HST (at VPF) -
Wide Field Planetary Camera (WF/PC) installation was completed.
The every four hour wasp inspection of the VPF highbay is
continuing. Facility HVAC monitoring continues.
- STS-32R SYNCOM (at Pad A) -
Battery conditioning will continue through 23 December and will
pick back up again on 29 December.
- STS-35 ASTRO-1/BBXRT (at O&C) -
AST vacuum system was hoisted to cite rails and the hoist of the
HUT pump platform 2 side rails were completed. BBXRT MLI
installation continues. Access platforms continue to be installed
as well as the cabling and configuring of ASTRO-1 for cite
testing which will begin on the first week in January.
- STS-40 SLS-1 (at O&C) -
Rack 7 upper mods continues. Rack 3 installation of cable tie
struts and fire suppression system hardware is complete.
Installation of rack 4 intercom remote station worked yesterday.
Module pyrell foam replacement continues.
- STS-42 IML (at O&C) -
Rack 9 cable tie struts worked yesterday.
Technical Details
Message-ID:
<38690@ames.arc.nasa.gov>Path:
arc1-ca.pugleaf.net!utzoo!attcan!uunet!aplcen!uakari.primate.wisc.edu!zaphod.mps.ohio-state.edu!think!ames!trident.arc.nasa.gov!yeeShow Full Headers
Complete Article Headers
Path: arc1-ca.pugleaf.net!utzoo!attcan!uunet!aplcen!uakari.primate.wisc.edu!zaphod.mps.ohio-state.edu!think!ames!trident.arc.nasa.gov!yee From: yee@trident.arc.nasa.gov (Peter E. Yee) Newsgroups: sci.space Subject: Payload Status for 12/21/89 (Forwarded) Message-ID: <38690@ames.arc.nasa.gov> Date: 21 Dec 89 22:32:42 GMT Sender: usenet@ames.arc.nasa.gov Reply-To: yee@trident.arc.nasa.gov (Peter E. Yee) Organization: NASA Ames Research Center, Moffett Field, CA Lines: 32