Thread View: triangle.general
10 messages
10 total messages
Started by The Smiths
Sun, 12 Oct 2003 18:56
Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: The Smiths
Date: Sun, 12 Oct 2003 18:56
Date: Sun, 12 Oct 2003 18:56
5 lines
1269 bytes
1269 bytes
They didn't do a damn thing, after all. Or maybe you peoples know something I don't. Educate me. Ken
Re: Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: Jorge R. Frank
Date: Sun, 12 Oct 2003 19:13
Date: Sun, 12 Oct 2003 19:13
23 lines
2093 bytes
2093 bytes
ken_andor_kathy@yahoo.com (The Smiths) wrote in news:755eff52.0310121056.49b67194@posting.google.com: > They didn't do a damn thing, after all. They didn't? FEMA was in charge of the debris search in Texas and Louisiana, covering an area of several thousand square miles, over a period of almost three months, involving several thousand people. The actual searchers were mostly US Forest Service (with one NASA and one EPA person per search team), but it was FEMA running the debris collection centers and writing the checks. > Or maybe you peoples know something I don't. Educate me. I'd like to see a verifiable reference for your $25B figure. If you mean "billion", that sounds about two orders of magnitude too high. -- JRF Reply-to address spam-proofed - to reply by E-mail, check "Organization" (I am not assimilated) and think one step ahead of IBM.
Re: Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: Dan Foster
Date: Sun, 12 Oct 2003 19:37
Date: Sun, 12 Oct 2003 19:37
28 lines
2683 bytes
2683 bytes
In article <Xns9412909F9DD4jrfrank@216.39.221.8>, Jorge R. Frank <jrfrank@ibm-pc.borg> wrote: > >> Or maybe you peoples know something I don't. Educate me. > > I'd like to see a verifiable reference for your $25B figure. If you mean > "billion", that sounds about two orders of magnitude too high. I can't find it now, but yeah, was a recent article (Perhaps from the Houston Chronicle?) where it stated that the expected cost to FEMA for the manpower-intensive search across the states for months was in the neighborhood of about $200 to $250 million, and could be higher if more information is tallied and additional requests from the states submitted. For the FEMA - that's definitely about 1% of the claimed $25B figure (or 'two orders of magnitude' as Jorge put it). Whomever told the original poster that $25B figure for the Columbia accident is pulling their leg. At least another $150-200M or so, NASA also has to pick up due to the Columbia Accident Investigation Board (CAIB) costs and other accident-related expenses. Perhaps the $25B is the total FEMA agency budget for the entire year, spanning all possible disasters? That's the only way I can even imagine such a large number. Incidentally, that number is about twice of NASA's *entire* annual budget (for manned and unmanned space programs as well as aeronautical research). -Dan
Re: Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: Andrew Gray
Date: Sun, 12 Oct 2003 21:18
Date: Sun, 12 Oct 2003 21:18
26 lines
2397 bytes
2397 bytes
In article <slrnbojbcp.rkp.dsf@gaia.roc2.gblx.net>, Dan Foster wrote: >> >> I'd like to see a verifiable reference for your $25B figure. If you mean >> "billion", that sounds about two orders of magnitude too high. > > I can't find it now, but yeah, was a recent article (Perhaps from the > Houston Chronicle?) where it stated that the expected cost to FEMA for the > manpower-intensive search across the states for months was in the > neighborhood of about $200 to $250 million, and could be higher if more > information is tallied and additional requests from the states submitted. CAIB Report, Vol. I, pp 47: "The Federal Emergency Management Agency, which directed the overall [debris recovery] effort, expended more than $305 million to fund the search. This cost does not include what NASA spent on aircraft support or the wages of hundreds of civil servants employed at the recovery area and in analysis roles at NASA centers." $25 billion, at a guess, is closer to the cost of the program since Challenger than the cost to clean up after Columbia. The FY 2003 budget for FEMA is $6.4bn, in fact... -- -Andrew Gray shimgray@bigfoot.com
Re: Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: Alan Erskine
Date: Mon, 13 Oct 2003 04:04
Date: Mon, 13 Oct 2003 04:04
19 lines
1653 bytes
1653 bytes
posting.google.com yet again... -- Alan Erskine alanerskine(at)optusnet.com.au The U.S. Government is in the peculiar position of toppling foreign governments in the name of democracy. Oh, how democractic! "The Smiths" <ken_andor_kathy@yahoo.com> wrote in message news:755eff52.0310121056.49b67194@posting.google.com... > They didn't do a damn thing, after all. > > Or maybe you peoples know something I don't. Educate me. > > Ken
Re: Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: The Smiths
Date: Tue, 14 Oct 2003 23:46
Date: Tue, 14 Oct 2003 23:46
62 lines
4097 bytes
4097 bytes
"Jorge R. Frank" <jrfrank@ibm-pc.borg> (oh he's won of those wonderful fuckin' IBMer's) wrote in message news:<Xns9412909F9DD4jrfrank@216.39.221.8>... > ken_andor_kathy@yahoo.com (The Smiths) wrote in > news:755eff52.0310121056.49b67194@posting.google.com: > > > They didn't do a damn thing, after all. > > They didn't? FEMA was in charge of the debris search in Texas and > Louisiana, covering an area of several thousand square miles, over a period > of almost three months, involving several thousand people. The actual > searchers were mostly US Forest Service (with one NASA and one EPA person > per search team), but it was FEMA running the debris collection centers and > writing the checks. > > > Or maybe you peoples know something I don't. Educate me. > > I'd like to see a verifiable reference for your $25B figure. If you mean > "billion", that sounds about two orders of magnitude too high. Ken asked me to take care of his light work on this. How exactly do YOU benefit from the government involvement in these staged events? Contractor? Worker for a wonderful company like IBM - a unindicted co-conspirator for all the evils they have helped facilitate? The information related to us - by fox news, no less - was that the bill for the shuttle disaster was $75B, and that FEMA had accounted for $25B of that. Sounds like all those people you name who were working so hard in the search of "truth" were out there having a party in Texas. Wonder if it included any pig-pickin's there in Crawford. A friend of mine got some of that space junk for a song from a dealer down in Texas. One of about 100 pieces that dude had, was what my friend told me. And that dude had some friends.... it goes on and on. That song and dance the federal government gave us about the volatility of the junk was just their way of TRYING to keep us small. Don't EVAH forget it people - we are the bosses of these people and we are going to be holding them accountable for the error of their ways AND their other excesses. And as for anyone arguing that no citizens should have any of the space junk just remember that we are the ones that paid for it, the government that allowed it to happen and the government that double-billed us for all their monday morning quarterbacking. So Jorge, Come on down to North Carolina and get the asswhuppin' you have coming to you. And bring all your fuckin' yankee buddies wit'cha too. Bring your expense cards with all of youse though, cause it's gonna take you a few of those continential breakfasts before you bring us to heel. And you might better bring some pine boxes for your friends too! They'll need them for the ride back home. Is that strong enough for you or would you like to come back for some second helpings. Kathy
Re: Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: The Smiths
Date: Tue, 14 Oct 2003 23:47
Date: Tue, 14 Oct 2003 23:47
23 lines
1905 bytes
1905 bytes
"Alan Erskine" <alanerskine@optusnet.com.au> wrote in message news:<3f8a23f7$0$30614$afc38c87@news.optusnet.com.au>... > posting.google.com yet again... you got a problem with it kangaroo? > > -- > Alan Erskine > alanerskine(at)optusnet.com.au > > The U.S. Government is in the > peculiar position of toppling foreign > governments in the name of democracy. > > Oh, how democractic! > > "The Smiths" <ken_andor_kathy@yahoo.com> wrote in message > news:755eff52.0310121056.49b67194@posting.google.com... > > They didn't do a damn thing, after all. > > > > Or maybe you peoples know something I don't. Educate me. > > > > Ken
Re: Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: Greg D. Moore (Strider)
Date: Wed, 15 Oct 2003 00:23
Date: Wed, 15 Oct 2003 00:23
20 lines
2395 bytes
2395 bytes
"The Smiths" <ken_andor_kathy@yahoo.com> wrote in message news:755eff52.0310141546.6f94f3de@posting.google.com... > The information related to us - by fox news, no less - was that the > bill for the shuttle disaster was $75B, and that FEMA had accounted > for $25B of that. > Fine. Show us a URL then. > Sounds like all those people you name who were working so hard in the > search of "truth" were out there having a party in Texas. Wonder if > it included any pig-pickin's there in Crawford. > > A friend of mine got some of that space junk for a song from a dealer > down in Texas. One of about 100 pieces that dude had, was what my > friend told me. And that dude had some friends.... it goes on and on. In other words, you're advertising that your friend committed a felony. Nice friend.
Re: Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: Jorge R. Frank
Date: Wed, 15 Oct 2003 00:44
Date: Wed, 15 Oct 2003 00:44
31 lines
2547 bytes
2547 bytes
ken_andor_kathy@yahoo.com (The Smiths) wrote in news:755eff52.0310141546.6f94f3de@posting.google.com: > The information related to us - by fox news, no less - was that the > bill for the shuttle disaster was $75B, and that FEMA had accounted > for $25B of that. I'd like to see a reference, then. Fox News has an archive of their news stories on their web site, and I found no article that supports such a figure. The AP, Washington Times, Newsday, Houston Chronicle, and many other sources cite a figure of $400 million, of which around $250 million was FEMA. > A friend of mine got some of that space junk for a song from a dealer > down in Texas. One of about 100 pieces that dude had, was what my > friend told me. And that dude had some friends.... it goes on and on. Better make sure the FBI doesn't find out. I'm sure your friend will thank you for ratting him out. > That song and dance the federal government gave us about the > volatility of the junk was just their way of TRYING to keep us small. I wouldn't bet on it. A little nitrogen tetroxide can ruin your whole day. -- JRF Reply-to address spam-proofed - to reply by E-mail, check "Organization" (I am not assimilated) and think one step ahead of IBM.
Re: Why was the cost of FEMA in the aftermath of the Columbia shuttle "disaster" $25B plus?
Author: Herb Schaltegger
Date: Wed, 15 Oct 2003 01:17
Date: Wed, 15 Oct 2003 01:17
18 lines
1807 bytes
1807 bytes
In article <755eff52.0310141546.6f94f3de@posting.google.com>,
ken_andor_kathy@yahoo.com (The Smiths) wrote:
>
(Snipped a bunch of factually incorrect, arrogantly ignorant, and
maliciously stupid nonsense)
Please, just do us all a favor and stop cross-posting your spewage to
sci.space.shuttle.
<PLONK!>
--
Herb Schaltegger, B.S., J.D.
Reformed Aerospace Engineer
"Heisenberg might have been here."
~ Anonymous
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads