Connex bids on Caltrain
Author: charles hobbs
Date: Sun, 04 Nov 2001 20:11
Date: Sun, 04 Nov 2001 20:11
8 lines
1501 bytes
1501 bytes
and lost to Amtrak....(btw, Caltrain is the San Francisco-San Jose commuter rail line) As far as I know, this is the first time Connex has tried to bid on any American operations (correct me if I'm incorrect) http://www.caltrain.com/caltrain/whatsnew/amtrak.html
Re: Connex bids on Caltrain
Author: JOHN LAW
Date: Sun, 04 Nov 2001 20:28
Date: Sun, 04 Nov 2001 20:28
16 lines
1731 bytes
1731 bytes
"charles hobbs" <chobbs@socal.rr.com> wrote in message news:3BE59F0C.AACE2204@socal.rr.com... > and lost to Amtrak....(btw, Caltrain is the San Francisco-San Jose > commuter rail line) > > As far as I know, this is the first time Connex has tried to bid > on any > American operations (correct me if I'm incorrect) > > http://www.caltrain.com/caltrain/whatsnew/amtrak.html > > > I hope they don't get it - last time I used Caltrain it all ran perfectly. I won't tell you what happened when I used Connex!!! John Law
Re: Connex bids on Caltrain
Author: David Nebenzahl
Date: Sun, 04 Nov 2001 21:42
Date: Sun, 04 Nov 2001 21:42
22 lines
2231 bytes
2231 bytes
JOHN LAW wrote: > "charles hobbs" <chobbs@socal.rr.com> wrote in message > news:3BE59F0C.AACE2204@socal.rr.com... > > and lost to Amtrak....(btw, Caltrain is the San Francisco-San Jose > > commuter rail line) > > > > As far as I know, this is the first time Connex has tried to bid > > on any > > American operations (correct me if I'm incorrect) > > > > http://www.caltrain.com/caltrain/whatsnew/amtrak.html > > > I hope they don't get it - last time I used Caltrain it all ran > perfectly. I won't tell you what happened when I used Connex!!! > John Law So, JOHN LAW, when's the last time you rode Caltrain? And what's your definition of "perfectly"? -- Nature abhors a vacuum, but she'll tolerate a Dust Buster.
Re: Connex bids on Caltrain
Author: Silas Warner
Date: Sun, 04 Nov 2001 21:49
Date: Sun, 04 Nov 2001 21:49
13 lines
1766 bytes
1766 bytes
charles hobbs wrote: > > As far as I know, this is the first time Connex has tried to bid > on any > American operations (correct me if I'm incorrect) For them as doesn't know what Connex is: try http://www.connex.co.uk Silas Warner
Re: Connex bids on Caltrain
Author: JOHN LAW
Date: Sun, 04 Nov 2001 22:14
Date: Sun, 04 Nov 2001 22:14
31 lines
2331 bytes
2331 bytes
"David Nebenzahl" <nobody@but.us.chickens> wrote in message news:3BE5B72C.CC59FF20@but.us.chickens... > JOHN LAW wrote: > > > "charles hobbs" <chobbs@socal.rr.com> wrote in message > > news:3BE59F0C.AACE2204@socal.rr.com... > > > and lost to Amtrak....(btw, Caltrain is the San Francisco-San Jose > > > commuter rail line) > > > > > > As far as I know, this is the first time Connex has tried to bid > > > on any > > > American operations (correct me if I'm incorrect) > > > > > > http://www.caltrain.com/caltrain/whatsnew/amtrak.html > > > > > I hope they don't get it - last time I used Caltrain it all ran > > perfectly. I won't tell you what happened when I used Connex!!! > > John Law > > So, JOHN LAW, when's the last time you rode Caltrain? And what's your > definition of "perfectly"? > > Just the once, May 2000. We went all the way to San Jose, then stopped off at various stations (for various brew pubs) on the way back to San Francisco. A great day out. "Perfectly" - on time, clean, friendly, efficient. None of these words spring to my mind for Connex! John
Re: Connex bids on Caltrain
Author: Merritt Mullen
Date: Sun, 04 Nov 2001 23:27
Date: Sun, 04 Nov 2001 23:27
20 lines
2096 bytes
2096 bytes
JOHN LAW at john-mightycat@lineone.net wrote on 11/4/01 12:28 PM: > "charles hobbs" <chobbs@socal.rr.com> wrote in message > news:3BE59F0C.AACE2204@socal.rr.com... >> and lost to Amtrak....(btw, Caltrain is >> the San Francisco-San Jose commuter rail line) > >> As far as I know, this is the first time Connex has tried to bid on any >> American operations (correct me if I'm incorrect) >> >> http://www.caltrain.com/caltrain/whatsnew/amtrak.html > I hope they don't get it - last time I used Caltrain it all ran perfectly. I > won't tell you what happened when I used Connex!!! John Law They didn't get the contract. The article quoted above says that both Connex and Herzog lost to Amtrak (for both maintenance and operations). Merritt
Re: Connex bids on Caltrain
Author: Philip Nasadowski
Date: Sun, 04 Nov 2001 23:40
Date: Sun, 04 Nov 2001 23:40
16 lines
1773 bytes
1773 bytes
In article <3BE5B72C.CC59FF20@but.us.chickens>, David Nebenzahl <nobody@but.us.chickens> wrote: > So, JOHN LAW, when's the last time you rode Caltrain? I haven't, but I know people who have, and "perfectly" isn't the words they used. Slow, rough, smelly, and undesireable were, though... > And what's your definition of "perfectly"? Same as every other commuter fan in the US, a 4 car double decker going 60mph over bad track once every 3 hours. It's no wonder systems out west get no ridership. -- To email me, remove the XXXX from my address, and replace it with "mail"
Re: Connex bids on Caltrain
Author: charles hobbs
Date: Mon, 05 Nov 2001 00:48
Date: Mon, 05 Nov 2001 00:48
41 lines
3021 bytes
3021 bytes
JOHN LAW wrote: > "David Nebenzahl" <nobody@but.us.chickens> wrote in message > news:3BE5B72C.CC59FF20@but.us.chickens... > > JOHN LAW wrote: > > > > > "charles hobbs" <chobbs@socal.rr.com> wrote in message > > > news:3BE59F0C.AACE2204@socal.rr.com... > > > > and lost to Amtrak....(btw, Caltrain is the San Francisco-San Jose > > > > commuter rail line) > > > > > > > > As far as I know, this is the first time Connex has tried to bid > > > > on any > > > > American operations (correct me if I'm incorrect) > > > > > > > > http://www.caltrain.com/caltrain/whatsnew/amtrak.html > > > > > > > I hope they don't get it - last time I used Caltrain it all ran > > > perfectly. I won't tell you what happened when I used Connex!!! > > > John Law > > > > So, JOHN LAW, when's the last time you rode Caltrain? And what's your > > definition of "perfectly"? > > > > Just the once, May 2000. We went all the way to San Jose, then stopped off > at various stations (for various brew pubs) on the way back to San > Francisco. A great day out. > > "Perfectly" - on time, clean, friendly, efficient. None of these words > spring to my mind for Connex! > I caught a Connex train just once, back in October when I was visiting London... rode it between Lewisham and Elmers End (on my way to go play with the Croydon trams)... Not absolutely horrid, although the equipment (and stations) have probably seen better days. That and the 3+2 seating reminded me of the Long Island Rail Road in New York, a little bit...
Re: Connex bids on Caltrain
Author: Joe Versaggi
Date: Mon, 05 Nov 2001 00:57
Date: Mon, 05 Nov 2001 00:57
18 lines
2252 bytes
2252 bytes
Philip Nasadowski wrote: > > In article <3BE5B72C.CC59FF20@but.us.chickens>, David Nebenzahl > <nobody@but.us.chickens> wrote: > > > So, JOHN LAW, when's the last time you rode Caltrain? > > I haven't, but I know people who have, and "perfectly" isn't the words > they used. Slow, rough, smelly, and undesireable were, though... > > > And what's your definition of "perfectly"? > > Same as every other commuter fan in the US, a 4 car double decker going > 60mph over bad track once every 3 hours. It's no wonder systems out > west get no ridership. What are you talking about ??? Caltrain runs every hour and ridership rivaling what they got in the 1950's, about double of 20 years ago.
Re: Connex bids on Caltrain
Author: Ron Goodenow
Date: Mon, 05 Nov 2001 02:46
Date: Mon, 05 Nov 2001 02:46
5 lines
1386 bytes
1386 bytes
My considerable comparative experience in the UK and California suggests that it is best for Connex, which has made a mess of some of its UK services, to just stay across the pond. Anyone who takes cheap shots at Caltrain without taking a close look at Connex has no real perspective. Tis privatization at its worst.
Re: Connex bids on Caltrain
Author: Merritt Mullen
Date: Mon, 05 Nov 2001 03:13
Date: Mon, 05 Nov 2001 03:13
33 lines
2712 bytes
2712 bytes
Philip Nasadowski at nasadowsk@XXXX.hartford.edu wrote on 11/4/01 3:40 PM: > In article <3BE5B72C.CC59FF20@but.us.chickens>, David Nebenzahl > <nobody@but.us.chickens> wrote: > >> So, JOHN LAW, when's the last time you rode Caltrain? > > I haven't, but I know people who have, and "perfectly" isn't the words > they used. Slow, rough, smelly, and undesireable were, though... > >> And what's your definition of "perfectly"? > > Same as every other commuter fan in the US, a 4 car double decker going > 60mph over bad track once every 3 hours. It's no wonder systems out > west get no ridership. With 80 trains a day and only one line, it's a bit difficult to see how Caltrain runs only once every 3 hours. I suppose you aren't familiar with Southern California's Metrolink service. 130 daily trains, operating immaculate and comfortable equipment, and reliably running on time. And it is mostly good track and top speed is 79 mph (except on portions of Coaster and Metrolink's San Diego line, where the top speed in 90 mph). Metrolink serves 49 stations on 416 route miles, and has about 33,000 daily riders. Metrolink may not be the size or have the ridership of Metro-North or NJT, but it is very good at what it does, the riders appreciate it, and it continues to grow. Merritt
Re: Connex bids on Caltrain
Author: Mike Foxtrot
Date: Mon, 05 Nov 2001 08:02
Date: Mon, 05 Nov 2001 08:02
22 lines
1975 bytes
1975 bytes
Connex plan to use VEP's and CEP's I expect on this franchise if they win it! "Philip Nasadowski" <nasadowsk@XXXX.hartford.edu> wrote in message news:nasadowsk-8D89B6.18403304112001@news.rcn.com... > In article <3BE5B72C.CC59FF20@but.us.chickens>, David Nebenzahl > <nobody@but.us.chickens> wrote: > > > So, JOHN LAW, when's the last time you rode Caltrain? > > I haven't, but I know people who have, and "perfectly" isn't the words > they used. Slow, rough, smelly, and undesireable were, though... > > > And what's your definition of "perfectly"? > > Same as every other commuter fan in the US, a 4 car double decker going > 60mph over bad track once every 3 hours. It's no wonder systems out > west get no ridership. > > -- > To email me, remove the XXXX from my address, and replace it with "mail"
Re: Connex bids on Caltrain
Author: David Eerdmans
Date: Mon, 05 Nov 2001 12:15
Date: Mon, 05 Nov 2001 12:15
27 lines
1969 bytes
1969 bytes
Silas Warner <silas@value.net> schreef in artikel <3BE5B7FB.CFB78618@value.net>... > > > charles hobbs wrote: > > > > As far as I know, this is the first time Connex has tried to bid > > on any > > American operations (correct me if I'm incorrect) > > For them as doesn't know what Connex is: try > > http://www.connex.co.uk That's only the website of Connex in Engeland, who operates the SouthEast railway franchise. The company is much larger. I believe it's based in Sweden, but it is owned by French company Vivendi / CGEA. Other Connex businesses include - Connex Australia http://www.connexaustralia.com.au/ (trains, even a monorail) - BBA Connex, http://www.bba.nl (buses in the Netherlands) and more. Regards, David
Re: Connex bids on Caltrain
Author: kenneth lin
Date: Mon, 05 Nov 2001 12:43
Date: Mon, 05 Nov 2001 12:43
13 lines
1887 bytes
1887 bytes
"Mike Foxtrot" <tangokilo@foxtrot.co.uk> wrote in message news:9s5gub$dh1$1@neptunium.btinternet.com... > Connex plan to use VEP's and CEP's I expect on this franchise if they win > it! Well, slam door coaching stock could sure speed passenger loading and unloading; reducing dwell times! US lawyers would love it! : ) Kenneth Lin
Re: Connex bids on Caltrain
Author: swamped
Date: Mon, 05 Nov 2001 14:41
Date: Mon, 05 Nov 2001 14:41
9 lines
1396 bytes
1396 bytes
On Mon, 5 Nov 2001 08:02:37 -0000, "Mike Foxtrot" <tangokilo@foxtrot.co.uk> wrote: >Connex plan to use VEP's and CEP's I expect on this franchise if they win >it! > > No I heard they were going to buy the 4BIL and use it.... pulled by the MethoDic of course.
Re: Connex bids on Caltrain
Author: swamped
Date: Mon, 05 Nov 2001 14:42
Date: Mon, 05 Nov 2001 14:42
8 lines
1350 bytes
1350 bytes
On Mon, 5 Nov 2001 08:02:37 -0000, "Mike Foxtrot" <tangokilo@foxtrot.co.uk> wrote: >Connex plan to use VEP's and CEP's I expect on this franchise if they win >it! > Sorry that was the 4BIL pulled by the MetroVic.
Re: Connex bids on Caltrain
Author: Bill Hayles
Date: Mon, 05 Nov 2001 18:30
Date: Mon, 05 Nov 2001 18:30
18 lines
1971 bytes
1971 bytes
On Mon, 05 Nov 2001 07:42:43 -0700, swamped wrote: >On Mon, 5 Nov 2001 08:02:37 -0000, "Mike Foxtrot" <tangokilo@foxtrot.co.uk> >wrote: > >>Connex plan to use VEP's and CEP's I expect on this franchise if they win >>it! >> > >Sorry that was the 4BIL pulled by the MetroVic. <pedant> BILs only ever came in a 2 car variety (2BIL) </pedant> -- Bill
Re: Connex bids on Caltrain
Author: Mike Foxtrot
Date: Mon, 05 Nov 2001 18:49
Date: Mon, 05 Nov 2001 18:49
24 lines
1875 bytes
1875 bytes
They sure would! The jolt when the train holts and the noise! Long live Ceps and Veps! "kenneth lin" <Kenneth.Lin@worldnet.att.net> wrote in message news:BPvF7.173604$W8.5594065@bgtnsc04-news.ops.worldnet.att.net... > > "Mike Foxtrot" <tangokilo@foxtrot.co.uk> wrote in message > news:9s5gub$dh1$1@neptunium.btinternet.com... > > Connex plan to use VEP's and CEP's I expect on this franchise if they win > > it! > > > Well, slam door coaching stock could sure speed passenger loading and > unloading; reducing dwell times! > US lawyers would love it! : ) > > > Kenneth Lin > > > >
Re: Connex bids on Caltrain
Author: Mike Foxtrot
Date: Mon, 05 Nov 2001 18:50
Date: Mon, 05 Nov 2001 18:50
36 lines
2184 bytes
2184 bytes
Are Connex trying to bid for the Transpennine franchise? Connex also have acquired Limebourne and Travel London to add to the current Connex Bus fleet. "David Eerdmans" <D.Eerdmans@student.kun.nl> wrote in message news:01c165f3$64e6f340$5461ae83@jg3barten5... > > > Silas Warner <silas@value.net> schreef in artikel > <3BE5B7FB.CFB78618@value.net>... > > > > > > charles hobbs wrote: > > > > > > As far as I know, this is the first time Connex has tried to bid > > > on any > > > American operations (correct me if I'm incorrect) > > > > For them as doesn't know what Connex is: try > > > > http://www.connex.co.uk > > That's only the website of Connex in Engeland, who operates the SouthEast > railway franchise. The company is much larger. I believe it's based in > Sweden, but it is owned by French company Vivendi / CGEA. Other Connex > businesses include > - Connex Australia http://www.connexaustralia.com.au/ (trains, even a > monorail) > - BBA Connex, http://www.bba.nl (buses in the Netherlands) > and more. > > Regards, > David >
Re: Connex bids on Caltrain
Author: Tim Fenton
Date: Mon, 05 Nov 2001 19:03
Date: Mon, 05 Nov 2001 19:03
14 lines
1686 bytes
1686 bytes
Bill Hayles <billnot@wanadoo.es> wrote in message news:5lmdutgpp88hl2e2avrgfco0g8jipmjj0a@4ax.com... > > <pedant> > BILs only ever came in a 2 car variety (2BIL) > </pedant> > Isn't this because BIL means "Both Lavatory" (as opposed to NOL (No Lavatory) or HAL (Half Lavatory))? -- Tim
Re: Connex bids on Caltrain
Author: Bill Hayles
Date: Tue, 06 Nov 2001 08:53
Date: Tue, 06 Nov 2001 08:53
12 lines
1973 bytes
1973 bytes
On Mon, 5 Nov 2001 19:03:50 -0000, "Tim Fenton" <timfenton@btinternet.com> wrote: >Isn't this because BIL means "Both Lavatory" (as opposed to NOL (No >Lavatory) or HAL (Half Lavatory))? Yes. But then there was the 4 LAV which only had two. -- Bill
Re: Connex bids on Caltrain
Author: swamped
Date: Tue, 06 Nov 2001 21:13
Date: Tue, 06 Nov 2001 21:13
19 lines
1775 bytes
1775 bytes
On Mon, 05 Nov 2001 19:30:41 +0100, Bill Hayles <billnot@wanadoo.es> wrote: >On Mon, 05 Nov 2001 07:42:43 -0700, swamped wrote: > >>On Mon, 5 Nov 2001 08:02:37 -0000, "Mike Foxtrot" <tangokilo@foxtrot.co.uk> >>wrote: >> >>>Connex plan to use VEP's and CEP's I expect on this franchise if they win >>>it! >>> >> >>Sorry that was the 4BIL pulled by the MetroVic. > ><pedant> >BILs only ever came in a 2 car variety (2BIL) ></pedant> Thanks for the correction, I'm only a poor dumb Yank so please bare with me.......
Re: Connex bids on Caltrain
Author: David Nebenzahl
Date: Tue, 06 Nov 2001 21:41
Date: Tue, 06 Nov 2001 21:41
27 lines
2063 bytes
2063 bytes
swamped wrote: > On Mon, 05 Nov 2001 19:30:41 +0100, Bill Hayles <billnot@wanadoo.es> wrote: > > >On Mon, 05 Nov 2001 07:42:43 -0700, swamped wrote: > > > >>On Mon, 5 Nov 2001 08:02:37 -0000, "Mike Foxtrot" <tangokilo@foxtrot.co.uk> > >>wrote: > >> > >>>Connex plan to use VEP's and CEP's I expect on this franchise if they win > >>>it! > >>> > >> > >>Sorry that was the 4BIL pulled by the MetroVic. > > > ><pedant> > >BILs only ever came in a 2 car variety (2BIL) > ></pedant> > > Thanks for the correction, I'm only a poor dumb Yank so please bare with > me....... OK, as long as you *promise* not to go bear naked ... I couldn't bare that. -- When cryptography is outlawed, only outlaws will qwertzuio pasghdfjkl yxcvbnmkl
Re: Connex bids on Caltrain
Author: Alistair Bell
Date: Wed, 07 Nov 2001 17:17
Date: Wed, 07 Nov 2001 17:17
26 lines
2683 bytes
2683 bytes
On Mon, 05 Nov 2001 12:43:13 GMT, kenneth lin is alleged to have said: >"Mike Foxtrot" <tangokilo@foxtrot.co.uk> wrote in message >news:9s5gub$dh1$1@neptunium.btinternet.com... >> Connex plan to use VEP's and CEP's I expect on this franchise if they win >> it! > >Well, slam door coaching stock could sure speed passenger loading and >unloading; reducing dwell times! >US lawyers would love it! : ) The lawyers would particularly love it when they discover that the VEPs and CEPs don't meet FRA crashworthiness requirements... Actually (IMHO) that's a major reason that commuter rail in the US isn't more popular. Because the passenger trains have to share track with US freight trains (which are much bigger and heavier than their European counterparts) they have to be built like tanks, which makes them (a) more expensive both to build and to operate, and (b) slower. I could rant on about this stuff for a while (like 'why don't they Sprinterise commuter rail in MA, where I live, and why is there no train between 0853 and 1108 from Framingham to Boston, which is essentially equivalent to Lichfield to Birmingham', and 'why on earth does a 150mph train take 3.5 hours to travel 200 miles from Boston to New York'). Oops, I just did :( Alistair
Re: Connex bids on Caltrain
Author: A.Boodoo
Date: Thu, 08 Nov 2001 14:49
Date: Thu, 08 Nov 2001 14:49
21 lines
2538 bytes
2538 bytes
Alistair Bell wrote: > On Mon, 05 Nov 2001 12:43:13 GMT, kenneth lin is alleged to have said: > > I could rant on about this stuff for a while (like 'why don't they Sprinterise > commuter rail in MA, where I live, and why is there no train between 0853 and > 1108 from Framingham to Boston, which is essentially equivalent to Lichfield to > Birmingham', and 'why on earth does a 150mph train take 3.5 hours to travel 200 > miles from Boston to New York'). Oops, I just did :( Or why a 125mph train [1] takes 3.5 hours to cover a similar distance between London and Leeds? Answer: a. the line speed isn't 125mph (110 maximum), b. it makes lots of stops serving intermediate cities, and c. It tends to detour via Doncaster on its way between Sheffield and Leeds for some obscure reason. Or does the Acela express really have 150-155mph linespeed track, completely segregated, and not stop very often? [1] Which is known to be able to travel as fast as 143mph A.Boodoo
Re: Connex bids on Caltrain
Author: Tim Fenton
Date: Thu, 08 Nov 2001 17:07
Date: Thu, 08 Nov 2001 17:07
17 lines
1965 bytes
1965 bytes
A.Boodoo <A.H.Boodoo@lboro.ac.uk> wrote in message news:3BEA9B78.CD5F1E13@lboro.ac.uk... > > Or does the Acela express really have 150-155mph linespeed track, completely > segregated, and not stop very often? > Doubt it. The line beyond New Haven twists a bit doesn't it? Anyway it's a sight better than the 4hr42 best (but usually a bit longer) pre electrification timing. Perhaps there will be more performance improvements later, but on the busiest stretch (ie NY to Washington) capacity could be a problem. -- Tim
Re: Connex bids on Caltrain
Author: Merritt Mullen
Date: Thu, 08 Nov 2001 19:15
Date: Thu, 08 Nov 2001 19:15
15 lines
2217 bytes
2217 bytes
> A.Boodoo <A.H.Boodoo@lboro.ac.uk> wrote in message > news:3BEA9B78.CD5F1E13@lboro.ac.uk... > > Or does the Acela express really have 150-155mph linespeed track, > completely segregated, and not stop very often? Yes, Amtrak does have 150 mph track and runs at that speed, but only for relatively short segments between New Haven and Boston. The problem is mostly between New York City and New Haven, where the tracks are owned by commuter authorities and cannot support the high speed. Between New York and Washington, speed is limited to 135 mph because of catenary limitations. Merritt
Re: Connex bids on Caltrain
Author: tobias b koehler
Date: Fri, 09 Nov 2001 15:44
Date: Fri, 09 Nov 2001 15:44
27 lines
2226 bytes
2226 bytes
In misc.transport.rail.americas Silas Warner <silas@value.net> wrote: > charles hobbs wrote: >> As far as I know, this is the first time Connex has tried to bid >> on any American operations (correct me if I'm incorrect) > For them as doesn't know what Connex is: try > http://www.connex.co.uk That mostly seems to cover British operations. Their worldwide site is http://www.connex.tm.fr/ According to http://www.connex.tm.fr/html_uk/05_monde/fmonde.htm connex is right now active in Europe and Asia/Pacific. In most countries, they are only operating buses. Their German site is http://www.connex-gruppe.de/ -- tobias benjamin kοΏ½hler _______________ tk2@rcs.urz.tu-dresden.de ____________ ______________ __>___________ ______________ ,'' H=========H||H============H|| ===== H=====H||H ===========H| `-oo--------oo-'`-oo--------oo-'`-oo--------oo-'`-oo--------oo-' european railway pictures - http://mercurio.iet.unipi.it/pix/
Re: Connex bids on Caltrain
Author: Hans-Joachim Zierke
Date: Mon, 12 Nov 2001 10:57
Date: Mon, 12 Nov 2001 10:57
19 lines
1940 bytes
1940 bytes
Tim Fenton schrieb:
> Doubt it. The line beyond New Haven twists a bit doesn't it? Anyway it's
> a sight better than the 4hr42 best (but usually a bit longer) pre
> electrification timing.
AFAIK, the Merchant's Limited needed about 4 hours in steam days.
hajo
--
No doubt F's 24-34 were used to designate
all them captured alien spacecraft.
Chris Douglas
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads