🚀 go-pugleaf

RetroBBS NetNews Server

Inspired by RockSolid Light RIP Retro Guy

Article View: uk.rec.models.rail
Article #30

Re: Substation spacing - 3rd rail

#30
From: Angus Bryant
Date: Thu, 12 Sep 2002 08:12
31 lines
2824 bytes
"Richard Catlow" <RBCatlow@aol.com> wrote in message
news:d3979d5f.0209111108.4634cd7@posting.google.com...
> Tony Sayer asked
> >
> > Another very interesting bit of reading. Can you explain why the tunnel
> > would be significant please?. Is it to do with wind resistance perhaps.
> >
> The rolling resistance of a vehicle is governed by a number of factors
> called Davies coefficients in the form a+bv+cv^2
>
> Where a= static resistance of train to motion i.e. stiction
> b= rotary intertia
> c= aerodynamic drag
> v= velocity
>
> Thus a train in a tunnel has a higher c element of the equation as the
> turbulent air flow of the train interacts with the tunnel. The actual
> drag in a tunnel depends upon bore size, whether there is oncoming
> traffic in the same bore, speed, uniformity and smoothness of the
> tunnel bore surface, tunnel length, whether there are vents and their
> physical location etc. It all makes an interesting computational fluid
> dynamics problem, even more so if you have to control smoke flows as
> well. I spent a little time working for the CFD guru who looked at
> these problems for the Channel Tunnel - very absorbing it was too.

I know it's nothing to do with 3rd rail, but does any modern stock (air-con,
post-privatisation) have valves to shut off the pressure when the train goes
into a tunnel?  I seem to remember that Eurostar does, but does anything
like the Pendolino/Voyager/etc?

Angus
Technical Details
Message-ID: <alphu0$j2f$1@pegasus.csx.cam.ac.uk>
Path: arc1-ca.pugleaf.net!archiver1.google.com!news1.google.com!newsfeed.stanford.edu!news-spur1.maxwell.syr.edu!news.maxwell.syr.edu!newsfeed.icl.net!newsfeed.fjserv.net!newspeer.clara.net!news.clara.net!peer.news.eu-x.com!server2.netnews.ja.net!pegasus.csx.cam.ac.uk!not-for-mail
References: <MPbf9.3193$Sr6.110768@ozemail.com.au> <d3979d5f.0209101145.1a1d5a7f@posting.google.com> <r7JJQhAiclf9EwiR@bancom.co.uk> <d3979d5f.0209111108.4634cd7@posting.google.com>

Show Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit
X-Google-Thread: 10befb,4a0592ad45abdc07
X-Google-Attributes: gid10befb,public
X-Google-Thread: fb12d,4a0592ad45abdc07
X-Google-Attributes: gidfb12d,public
X-Google-Thread: 11469f,4a0592ad45abdc07
X-Google-Attributes: gid11469f,public
X-Google-Thread: f73ba,4a0592ad45abdc07
X-Google-Attributes: gidf73ba,public
X-Google-ArrivalTime: 2002-09-12 01:06:26 PST
Path: arc1-ca.pugleaf.net!archiver1.google.com!news1.google.com!newsfeed.stanford.edu!news-spur1.maxwell.syr.edu!news.maxwell.syr.edu!newsfeed.icl.net!newsfeed.fjserv.net!newspeer.clara.net!news.clara.net!peer.news.eu-x.com!server2.netnews.ja.net!pegasus.csx.cam.ac.uk!not-for-mail
From: "Angus Bryant" <atb23@cam.ac.uk>
Newsgroups: uk.rec.models.rail,uk.railway,uk.transport.london,aus.rail
Subject: Re: Substation spacing - 3rd rail
Date: Thu, 12 Sep 2002 09:12:03 +0100
Organization: University of Cambridge, England
Lines: 33
Message-ID: <alphu0$j2f$1@pegasus.csx.cam.ac.uk>
References: <MPbf9.3193$Sr6.110768@ozemail.com.au> <d3979d5f.0209101145.1a1d5a7f@posting.google.com> <r7JJQhAiclf9EwiR@bancom.co.uk> <d3979d5f.0209111108.4634cd7@posting.google.com>
NNTP-Posting-Host: atb23.quns.cam.ac.uk
X-Priority: 3
X-MSMail-Priority: Normal
X-Newsreader: Microsoft Outlook Express 5.50.4133.2400
X-MimeOLE: Produced By Microsoft MimeOLE V5.50.4133.2400