The railway technical pages at www.trainweb.org will give you some answers: "DC, on the other hand was the preferred option for shorter lines, urban systems and tramways. However, it was also used on a number of main line railway systems, and still is in some parts of continental Europe, for example. Apart from only requiring a simple control system for the motors, the smaller size of urban operations meant that trains were usually lighter and needed less power. Of course, it needed a heavier transmission medium, a third rail or a thick wire, to carry the power and it lost a fair amount of voltage as the distance between supply connections increased. This was overcome by placing substations at close intervals - every three or four kilometres at first, nowadays two or three on a 750 volt system - compared with every 20 kilometres or so for a 25 kV AC line". Generally voltages were low on old systems because electrical gear was heavy and bulky if needed to reduce voltages for the DC motors, designed to operate at around 600 volts. 1920s London tube stock for example had about a third of each motor carriage devoted to the control gear, if you had to reduce voltage from the line supply with the technology then available you would have lost considerably more revenue space. Regards David Bennetts
Technical Details
Message-ID:
<oVdf9.3227$Sr6.111820@ozemail.com.au>Path:
arc1-ca.pugleaf.net!archiver1.google.com!news1.google.com!newsfeed.stanford.edu!cyclone.bc.net!newsfeed.media.kyoto-u.ac.jp!snewsf0.syd.ops.aspac.uu.net!ozemail.com.au!not-for-mailReferences:
<MPbf9.3193$Sr6.110768@ozemail.com.au>Show Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: fb12d,4a0592ad45abdc07 X-Google-Attributes: gidfb12d,public X-Google-Thread: 11469f,4a0592ad45abdc07 X-Google-Attributes: gid11469f,public X-Google-Thread: 10befb,4a0592ad45abdc07 X-Google-Attributes: gid10befb,public X-Google-Thread: f73ba,4a0592ad45abdc07 X-Google-Attributes: gidf73ba,public X-Google-ArrivalTime: 2002-09-09 20:45:25 PST Path: arc1-ca.pugleaf.net!archiver1.google.com!news1.google.com!newsfeed.stanford.edu!cyclone.bc.net!newsfeed.media.kyoto-u.ac.jp!snewsf0.syd.ops.aspac.uu.net!ozemail.com.au!not-for-mail From: "David Bennetts" <davibee@hotmail.com> Newsgroups: uk.rec.models.rail,uk.railway,uk.transport.london,aus.rail References: <MPbf9.3193$Sr6.110768@ozemail.com.au> Subject: Re: Substation spacing - 3rd rail Lines: 32 X-Priority: 3 X-MSMail-Priority: Normal X-Newsreader: Microsoft Outlook Express 6.00.2600.0000 X-MIMEOLE: Produced By Microsoft MimeOLE V6.00.2600.0000 Message-ID: <oVdf9.3227$Sr6.111820@ozemail.com.au> NNTP-Posting-Host: 1cust11.tnt1.bowral.au.da.uu.net X-Trace: ozemail.com.au 1031629524 63.60.255.139 (Tue, 10 Sep 2002 13:45:24 EST) NNTP-Posting-Date: Tue, 10 Sep 2002 13:45:24 EST Organization: OzEmail Ltd, Australia Distribution: world Date: Tue, 10 Sep 2002 13:45:22 +1000