Thread View: ut.nets.reports
1 messages
1 total messages
Started by "Merit Network Operations Center...
Thu, 27 Jun 1991 07:39
06/27/91 ENSS 128 and ENSS 135 unreachable 02:10-03:04 EDT
Author: "Merit Network Operations Center...
Date: Thu, 27 Jun 1991 07:39
Date: Thu, 27 Jun 1991 07:39
7 lines
690 bytes
690 bytes
06/27/91 ENSS 128 and ENSS 135 unreachable 02:10-03:04 EDT All networks announced via the ENSS 128 Palo Alto node and the ENSS 135 San Diego node were reachable via the T1 network during this time. -Belinda Blair Merit Network Operations
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads