Thread View: ut.nets.reports
1 messages
1 total messages
Started by "Merit Network Operations Center...
Fri, 28 Jun 1991 13:04
06/28/91 ENSS 134 Boston Scheduled Maintenance 05:59 - 06:07 EDT
Author: "Merit Network Operations Center...
Date: Fri, 28 Jun 1991 13:04
Date: Fri, 28 Jun 1991 13:04
6 lines
651 bytes
651 bytes
06/28/91 ENSS 134 Boston Scheduled Maintenance 05:59 - 06:07 EDT. All networks announced via the Boston T3 node were reachable via the T1 backbone during this time. Anthony Philyaw / Merit / NOC
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads