ICR Presents a Colloquium on "Have We Achieved the Holy Grail of Schedulers", on Wednesday, February 3, 1993, at 3:30 pm....
Author: ylkingsb
Date: Wed, 27 Jan 1993 20:48
Date: Wed, 27 Jan 1993 20:48
82 lines
4139 bytes
4139 bytes
The University of Waterloo
200 University Avenue
Waterloo, Ontario
The Institute for Computer Research (ICR)
Presents a Colloquium on
Have We Achieved the Holy Grail of Schedulers?
by: Dr. Mark S. Fox
of: Department of Industrial Engineering
University of Toronto
Date: Wednesday, February 3, 1993
Time: 3:30 pm.
Place: William G. Davis Computer Research Centre, Room 1302
Abstract:
Conventional wisdom in the field of scheduling, is that schedul-
ing problems exhibit such a richness and variety that no single
scheduling method is sufficient. But in the last five years,
research in Artificial Intelligence constraint-directed ap-
proaches to scheduling have demonstrated a surprising degree of
effectiveness and generality. The primary components of
constraint-directed scheduling are a problem topology, textures
and objectives. A problem topology is represented by a con-
straint graph where nodes are activities and arcs are constraints
among the activities, e.g., temporal and resource. A problem to-
pology my be altered by problem reformulations, such as abstrac-
tion and aggregation. Problem textures are fundamental measures
of constraint graphs that indicate decision complexity, uncer-
tainty and elasticity. Texture measures, such as: "value
contention"--degree to which more than one variable may have the
same value; "variable reliance"--degree to which a variable re-
lies upon the assignment of a particular value; "variable
looseness"--size of range (conjunction of constraints); "con-
straint tightness"--degree to which the constraint reduces the
set of admissible solutions; and, "constraint importance"--how
important is it to satisfy the constraint; are used to determine
where in the constraint graph the next decision is to be made,
i.e., variable and constraint selection. Problem objectives de-
fine what is to be optimized.
Two methods for assigning resources over time to each of the ac-
tivities have been used. The "generative" method starts with an
empty schedule and iteratively selects and assigns resources to
each activity over time, and backtracks whenever a deadend (i.e.,
infeasibility) is reached. The "repair" method starts with a
completed schedule containing unsatisfied (i.e., broken) con-
straints and iteratively selects and reassigns resources to an
activity over time that satisfies as many unsatisfied constraints
as possible. Search in both cases ends whenever the "best"
schedule is found that satisfies the constraints. The repair
method can be augmented by using simulated annealing to find
better schedules. Central to the approach is the measurement of
properties of the constraint graph, which we call textures, which
are used to perform variable (i.e., activity) and value (i.e.,
resource and time) ordering.
This presentation will describe the constraint-directed schedul-
ing method and present a four level architecture for a general
scheduling system based on constraint-directed search. The ar-
chitecture integrates problem acquisition, generative-and
repair-based techniques, and schedule execution around a single
constraint graph representation.
Everyone is welcome. Refreshments served.
Thread Navigation
This is a paginated view of messages in the thread with full content displayed inline.
Messages are displayed in chronological order, with the original post highlighted in green.
Use pagination controls to navigate through all messages in large threads.
Back to All Threads