Article View: bit.listserv.quality
Article #19Re: Inspection and test status
From: Eric Stern
Date: Fri, 25 Sep 1998 00:00
Date: Fri, 25 Sep 1998 00:00
42 lines
2947 bytes
2947 bytes
Monika, I would simply tag the hardware according to the inspection status, e.g. (in process ) inspected and (final) inspected. If you see a benefit of going to a finer detail, you could have a traveller sheet with the equipment, marking the types of tests to be carried out, as a checklist, and marking off the tests and inspections that have been carried out. >From your message however I suspect that there is some other aspect that bothers you, e.g. perhaps not enough tests or not critical enough tests are carried out. That is covered in another chapter of the standard and there you need to rely on your understanding of the specification given by the client, governemnt regulations, as well as the requirements imposed internally, e.g. matters of reliability, manufacturability, maintainability, etc. monika.bryczkowska@plcen.mail.abb.com wrote: > I am the Quality Manager of ABB Centrum Ltd. in Poland. Scope of my firm > activity include: design engineering, supply, erection supervision, > commissioning, after sales service of automation system for use in power > generation industries. > I have the problem with Inspection and test status. Our product include > automation systems used in power generation industry and it is not obvious > how to establish and implement the inspection and test status. To the > computer system we can not stick the status card. Naturally we test our > products in many ways and we have a lot of measurements, but in fact, I > feel, this is not enough. We maintain the products register which include > all the goods we sold, but I think this is not a good solution. > I count on your help and good advice. > > Monika Bryczkowska > Quality Manager > monika.bryczkowska@plcen.mail.abb.com -- Eric Stern Tel/Fax: (514) 483-6264 5386 West Broadway Montreal, QC, Canada, H4V 2A4 eric@cam.org
Technical Details
Message-ID:
<360C4FDB.902115D3@cam.org>Path:
arc1-ca.pugleaf.net!unknown!not-for-mailReferences:
<199809251949.PAA17115@Hydro.CAM.ORG>Show Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: 1159be,6704879cace188e8,start X-Google-Attributes: gid1159be,public From: Eric Stern <eric@CAM.ORG> Subject: Re: Inspection and test status Date: 1998/09/25 Message-ID: <360C4FDB.902115D3@cam.org> X-Deja-AN: 394991061 Sender: TQM in Manufacturing and Service Industries Discussion List <QUALITY%PUCC.BITNET@vtbit.cc.vt.edu> Content-Transfer-Encoding: 7bit Approved: NETNEWS@AUVM.AMERICAN.EDU * References: <199809251949.PAA17115@Hydro.CAM.ORG> Comments: ******************************************************** Approved-By: "Bill Casti (System Admin)" <help@QUALITY.ORG> Content-Type: text/plain; charset=us-ascii X-Received: from cam.org (Dialup-872.HIP.CAM.ORG [199.84.148.177]) by Altitude.CAM.ORG (8.8.4/8.8.4) with ESMTP id WAA21176 for <QUALITY@PUCC.BITNET>; Fri, 25 Sep 1998 22:22:33 -0400 (EDT) X-Comment: VM1.MCGILL.CA: Mail was sent by Altitude.CAM.ORG MIME-Version: 1.0 Reply-To: eric@CAM.ORG Newsgroups: bit.listserv.quality