Article #328Re: building wiring
From: Randall Atkinson
Date: Sun, 24 Jan 1993 23:26
Date: Sun, 24 Jan 1993 23:26
36 lines
2186 bytes
2186 bytes
[ redirected discussion from comp.protocols.tcp-ip :-] In article <1993Jan24.231044.16138@xenitec.on.ca> merce@xenitec.on.ca (Jim Mercer) writes: >for new buildings, [coax is] dead, except for the possibiliy of backbone >pulls of thick coax to connect wiring centres, but then you might consider >fiber. Actually, I happen to be planning for a 1995 building and we are sure that our backbones will be fiber. However, we expect to continue to have a large installed base of workstations that want a thin-net Ethernet coax connection and do not plan that twisted pair will be enough. The harder question is which kind of fiber to install. So our backbone plans have both single-mode and multi-mode fiber. The distribution within the floors will be decided upon later so we have time to figure out what we want. >for existing buildings, if you are pulling new cable, pull UTP. you >will probably save some money on media. you will spend it later in hubs. Actually most of the cost of cabling installation is in the labor, so it would be much wiser to put in Shielded Twisted Pair (STP), with 2 pair of wires per outlet. NB: Anything that will run over UTP will also run over STP, but the reverse is NOT true. STP is wisest and gives the most flexibility, with little real cost difference from UTP when you figure in installation costs. >2) What options are available for small (less than a dozen nodes) networks >currently running coax and wanting to move to 10BaseT? If really small, then why not just use continue to use what you have where you have it, move to STP for new locations and add tranceivers/T-joints where there are new drops in existing coax locations.
Technical Details
Message-ID:
<C1Dt40.9AF@ra.nrl.navy.mil>Path:
arc1-ca.pugleaf.net!sparky!uunet!dtix!darwin.sura.net!ra!atkinsonReferences:
<19971@mindlink.bc.ca> <1993Jan24.231044.16138@xenitec.on.ca>Show Full Headers
Complete Article Headers
Path: arc1-ca.pugleaf.net!sparky!uunet!dtix!darwin.sura.net!ra!atkinson From: atkinson@itd.nrl.navy.mil (Randall Atkinson) Newsgroups: comp.dcom.lans.misc Subject: Re: building wiring Message-ID: <C1Dt40.9AF@ra.nrl.navy.mil> Date: 24 Jan 93 23:26:23 GMT References: <19971@mindlink.bc.ca> <1993Jan24.231044.16138@xenitec.on.ca> Sender: usenet@ra.nrl.navy.mil Followup-To: comp.dcom.lans.misc Distribution: na Organization: Naval Research Laboratory, DC Lines: 36