The Iowa Department of Transportation is providing this road construction information as a public service. Questions or comments about Iowa DOT projects, policies, etc., are not answered in this newsgroup. If you have questions or comments, please direct them to Director's Staff, Iowa DOT, 800 Lincoln Way, Ames, IA 50010, telephone 515-239-1372, or via e-mail to jdickin@max.state.ia.us or jbdickinson@iadot.e-mail.com. ROAD CONSTRUCTION - TRAFFIC MAINTAINED ON HIGHWAY Provided by the Iowa Department of Transportation - 11/22/96 I-80 Bridge deck replacement on the I-80 Mississippi River bridge. Two 12' lanes each direction. Width restriction of 11'6". Project Engineer: Doug Rick, 319-391-4643, Davenport. I-80 Guardrail installations at various locations from Casey interchange (milepost 82.75 easterly approximately 15 miles to 1 mile east of the Madison County line (milepost 98.15). One lane 12' in work areas during daylight hours only. Project Engineer: Roger Gould, 515-782-4518, Creston. I-680 Resurfacing from milepost 21.90 approximately 7 miles west of I-80 easterly 7.6 miles to milepost 29.50. One 10'lane each direction. Project Engineer: Ben Behnami, 712-366-0568, Council Bluffs. Iowa 2 Bridge over Mississippi River; 8' width restriction. Iowa 5 Paving within Carlisle for approximately 1/2 mile. One 10' lane each direction. Project Engineer: Mitch Dillavou, 515-262-5692, Des Moines. Iowa 5 Culvert extension from Middle River southeast of Carlisle to 1/2 mile east of Warren County Road S-23. On-site detour; little disruption to traveling public. Project Engineer: Don Stevens, 712-623-4951, Red Oak. U.S. 6/Douglas Avenue Widening and resurfacing from 34th Street easterly approximately .8 mile to east of Martin Luther King Jr. Parkway. One 11' lane each direction. Traffic will be head-to-head in 11' lanes and have a continuous left-turn lane. Project Engineer: Ron DeBok, 515-386-8166, Jefferson. U.S. 6 Culvert reconstruction from the intersection of U.S. 6 and 23rd Avenue in Coralville to the intersection of 22nd Avenue and U.S. 6. One 12' lane each direction with head-to-head traffic. Project Engineer: Newman Abuissa, 319-351-8818, Iowa City. U.S. 6 Intersection reconstruction and bridge widening on Kanesville Boulevard and Broadway in Council Bluffs from 6th Street to 16th Street Two 11' lanes each direction. Project Engineer: Ben Behnami, 712-366-0568, Council Bluffs. U.S. 18 Resurfacing from the O'Brien County line easterly approximately 12 miles to junction U.S. 71 in Spencer. 1 lane 12'. Project Engineer: Tony Gustafson, 712-225-5786, Cherokee. U.S. 20 Reconstruction on Dodge Street in Dubuque. One 12' lane each direction. Project Engineer: Cary T. Lewis, 319-927-2397, Manchester. U.S. 30 Grading and paving from approximately 1.5 miles east of the junction with Iowa 330 easterly approximately 1,000 feet. Traffic will be head-to-head in work area. Both eastbound and westbound lanes will be affected. Project Engineer: Doug McDonald, 515-752-4657, Marshalltown. U.S. 30 Grading and paving in Carroll just west of Monterey Dr. easterly approximately 2 miles One 11'5" lane each direction; two-way traffic will be maintained. Project Engineer: Jerry Arn, 712-263-5628, Denison. Iowa 36 Resurfacing from 1st in Wall Lake northerly approximately 2.6 miles to junction with U.S. 71/Iowa 7. One lane 12'. Project Engineer: Tony Gustafson, 712-225-5786, Cherokee. U.S. 52 Patching from 10 miles north of junction with Iowa 9 northerly 5.8 miles to the Minnesota state line. 1 lane 12'. One-lane traffic will be controlled by flaggers and pilot car. Project Engineer: George Feazell, 319-382-3632, Decorah. U.S. 61 Paving from Lee County line northerly approximately 7 miles to near West Avenue in Burlington. Minimal disruption of normal traffic flow. Project. Engineer: Joseph W. Demeter, 319-385-2211. U.S. 61 Grading and shoulder widening from Des Moines County line northerly approximately 8.2 miles to 3/4 mile north of junction with Iowa 99. One 12'lane each direction. Minimal inconvenience to traffic: shoulder widening operation controlled by flaggers. Project Engineer: Jim Webb, 319-385-2211, Mt. Pleasant. U.S. 65 Resurfacing from Story County Road E-41 (Lincoln Highway at Colo) northerly 20 miles to Story County Road D-65. Intermittent lane closures of one lane 12' during daytime hours only. Project Engineer: Sandra Larson, 515-233-1033, Ames. U.S. 67 Pavement replacement from Valley Drive in Riverdale northeasterly approximately 3 miles to just east of 249th Avenue in Pleasant Valley. One 10' lane each direction. Project Engineer: Mark Brandl, 319-391-2750, Davenport. U.S. 67 Pavement replacement in LeClaire just east of junction with I-80. One 12' lane each direction. Project Engineer: Mark Brandl, 319-391-2750, Davenport. U.S. 67 Bridge replacement over Crow Creek. One 11' lane each direction. Project Engineer: Mark Brandl, 319-391-2750, Davenport. U.S. 71 Resurfacing from west junction of Iowa 175 northerly approximately 8 miles to the south junction with U.S. 20. 1 lane 12'. Project Engineer: Tony Gustafson, 712-225-5786, Cherokee. U.S. 75 Resurfacing from north of the Woodbury County line (Plymouth County Road C-80) northerly approximately 16 miles to 18th Street in Le Mars. One lane 12'5" in southbound lanes. Project Engineer: Darwin Bishop, 712-239-1367, Sioux City. Iowa 99 Pavement widening and resurfacing from north of Golf Course Road north of Burlington northerly approximately 10 miles to Kingston. One lane 9' during work hours. Flaggers and pilot car will maintain traffic through work zones. Project Engineer: Jim Webb, 319-385-2211, Mt. Pleasant. Iowa 137 Grading from north of Eddyville northerly to just outside Oskaloosa. One 12' lane each direction. Construction work will be going on along the side of the existing roadway. Project Engineer: Ed Kasper, 515-682-4525, Ottumwa. Iowa 141 Culvert construction 0.8 mile west of junction with U.S. 59 north of Denison. One 12' lane each direction with minimal disruption to traveling public. Both shoulders will be restricted during construction. Project Engineer: Jerry Arn, 712-263-5628, Denison. Iowa 141 Culvert construction and grading from 7.5 miles west of U.S. 169 east and south approximately 11.83 miles to west of Granger. One 12' lane each direction. Traffic will be near normal with only minor delays. Project Engineer: Roger Gould, 515-782-4518, Creston. Iowa 163 Grading structures on relocated Iowa 163 from 2 miles northwest of Oskaloosa southerly to Iowa 137 south of Oskaloosa. One 12' lane each direction. On-site detour on Iowa 137. Project Engineer: Ed Kasper, 515-682-4525, Ottumwa. U.S. 218 Grading from Henry County line northerly approximately 7 miles to just north of County Road G-52. One 12' lane each direction. Minimal inconvenience to traveling public. Project. Engineer: Joseph W. Demeter, 319-385-2211, Mt. Pleasant. U.S. 218 Paving from approximately 2.5 miles north of Crawfordsville (Co. Road G-52) northerly approximately 3.4 miles to 1 mile north of junction with Iowa 92. One 12' lane each direction; minimal inconvenience to traveling public. Project Engineer: Joseph W. Demeter, 319-385-2211. U.S. 218 Bridge retrofit on bridge over Big Creek located 2.5 miles north of Mt. Pleasant. 2 lanes, 16' lane; traffic controlled with temporary traffic signals. Lane restriction of 16'. Project Engineer: Joseph W. Demeter, 319-385-2211. Iowa 223 From junction of Iowa 330 easterly approximately 7 miles to Baxter. Restricted to loads of 11 tons. ROAD CONSTRUCTION - TRAFFIC DETOURED OVER OTHER ROUTES Provided by the Iowa Department of Transportation - 11/22/96 Iowa 1 Reconstruction from the intersection of Burlington Street and Linn Street to intersection of College and Governor Street Detour: Northbound: Linn Street to College Street, College Street to northbound Governor Street. Southbound: Dodge Street to College Street, College Street to Linn Street, Linn Street to Burlington Street (Iowa 1). Project Engineer: Newman Abuissa, 319-351-8818, Iowa City. Iowa 3 Reconstruction of Iowa 3 from 8th Street in Waverly easterly to U.S. 63. Detour: commence at junction of Iowa 3 and 1st Street NW in Waverly, northerly 1.63 miles on 1st Street Northwest, Adams Parkway, and Horton Road to north city limit of Waverly (Co. Road V-14); then northerly on V-14 to C-33; then easterly on C-33 to U.S. 63; then southerly on U.S. 63 to Iowa 3. Project Engineer: Gerald L. Lund, 319-235-9503, Waterloo. Iowa 5/46 Construction of relocated U.S. 65/Iowa 5 interchange. Detour: Commence at east ramp terminal of Relocated U.S. 65 and southeast 64th Avenue interchange to the junction of Iowa 46 and existing Iowa 5 (Southeast 45th Street). Project Engineer: Mitch Dillavou, 515-262-5692, Des Moines. Iowa 28 Reconstruction from I-235 1.5 miles to junction of U.S. 6 (Hickman Road). Detour: Commence at junction of Iowa 28/I-235; then west on I-235 to the junction of I-35/I-80; then north on I-35/I-80 to junction of U.S. 6. then east on U.S. 6 to Iowa 28 (63rd Street). Project Engineer: Cy Quick, 515-225-2349, Des Moines. U.S. 52/Iowa 3 Sanitary sewer reconstruction within city of Dubuque. Detour: PHASE 1: Elm Street from 11th Street to 12th Street, 12th Street from Elm Street to White Street; PHASE 2: 12th Street from White Street to Jackson Street, Jackson Street from 12th Street to 14th Street, 14th Street from Jackson Street to White Street. Northbound U.S. 52/Iowa 3 traffic will use the detour route; southbound U.S. 52/Iowa 3 will remain on Central Avenue. Project Engineer: Art Gourley, 319-875-2375, Dyersville. U.S. 71 Grading and paving from junction of U.S. 71 and Iowa 7 South of Storm Lake northerly and westerly 3 miles to intersection of U.S. 71 and unnamed Buena Vista county road. Detour: STAGE 1: Commence at the south junction of U.S. 71/Iowa 7/Buena Vista County C-6; then westerly on C-65 to the intersection of C-65 and unmarked county road; then northerly to intersection with U.S. 71/Iowa 7. This portion of the detour will continue after state 2 is completed. STAGE 2: Commence at the intersection of U.S. 71 and Buena Vista County M-44; then northwesterly on M-44 to the intersection of M44 and Iowa 3. Project Engineer: Tony Gustafson, 712-225-5786, Cherokee. Iowa 92 Reconstruction of Iowa 92 between Winterset and I-35. Detour: Commence at north junction of U.S. 169/Iowa 92; then northerly on U.S. 169 to I-80; then easterly in I-80 approximately 13 miles to I-80/I-35 interchange; then southerly on I-35 to Iowa 92 interchange. Project Engineer: Roger Gould, 515-782-4518, Creston. Iowa 149 Reconstruction from west junction of Iowa 22 at Webster to the east junction at South English. Detour: Commence at junction of Iowa 22 (Washington Street) and Main Street in Webster; then south on Main Street to the junction of Iowa 149; then southerly on Iowa 149 to Iowa 92; then easterly on Iowa 92 to V-67; then northerly on V-67 to junction of Main Street in Harper; then northeast on Main Street to Hutchinson Street; then north on Hutchinson Street to Yerger Street; then east on Yerger Street to the ECL of Harper (V-67); then east on V-67 to junction of G-32; then north on V-67 to junction of Iowa 22; then west on Iowa 22 to junction of Iowa 149. Project Engineer: Charles E. Belgarde, 515-472-6142, Fairfield.
Technical Details
Message-ID:
<961122115656.24562@news.iastate.edu>Path:
arc1-ca.pugleaf.net!unknown!not-for-mailShow Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: 10f385,7fbeff3705ce5865,start X-Google-Attributes: gid10f385,public From: jbdickinson@iadot.e-mail.com Subject: Iowa DOT Road Construction Report - 11/22/96 Date: 1996/11/22 Message-ID: <961122115656.24562@news.iastate.edu> X-Deja-AN: 198108886 distribution: ia sender: daemon@news.iastate.edu organization: Iowa Department of Transportation, Ames, IA newsgroups: ia.dot.road-work