Article View: ia.dot.road-work
Article #5Re: Iowa DOT Road Construction Report - 11/22/96
From: LEDERMAN
Date: Sun, 24 Nov 1996 00:00
Date: Sun, 24 Nov 1996 00:00
292 lines
13322 bytes
13322 bytes
This is a multi-part message in MIME format. --------------6F3D78F3176 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit jujbdickinson@iadot.e-mail.com wrote: > > The Iowa Department of Transportation is providing this road > construction information as a public service. Questions or > comments about Iowa DOT projects, policies, etc., are not > answered in this newsgroup. If you have questions or > comments, please direct them to Director's Staff, Iowa DOT, > 800 Lincoln Way, Ames, IA 50010, telephone 515-239-1372, or > via e-mail to jdickin@max.state.ia.us or > jbdickinson@iadot.e-mail.com. > > ROAD CONSTRUCTION - TRAFFIC MAINTAINED ON HIGHWAY > Provided by the Iowa Department of Transportation - 11/22/96 > > I-80 Bridge deck replacement on the I-80 Mississippi River > bridge. Two 12' lanes each direction. Width restriction of > 11'6". Project Engineer: Doug Rick, 319-391-4643, > Davenport. > > I-80 Guardrail installations at various locations from > Casey interchange (milepost 82.75 easterly > approximately 15 miles to 1 mile east of the Madison > County line (milepost 98.15). One lane 12' in work > areas during daylight hours only. Project Engineer: > Roger Gould, 515-782-4518, Creston. > > I-680 Resurfacing from milepost 21.90 approximately 7 > miles west of I-80 easterly 7.6 miles to milepost > 29.50. One 10'lane each direction. Project Engineer: > Ben Behnami, 712-366-0568, Council Bluffs. > > Iowa 2 Bridge over Mississippi River; 8' width > restriction. > > Iowa 5 Paving within Carlisle for approximately 1/2 > mile. One 10' lane each direction. Project Engineer: > Mitch Dillavou, 515-262-5692, Des Moines. > > Iowa 5 Culvert extension from Middle River southeast > of Carlisle to 1/2 mile east of Warren County Road S-23. > On-site detour; little disruption to traveling > public. Project Engineer: Don Stevens, 712-623-4951, > Red Oak. > > U.S. 6/Douglas Avenue Widening and resurfacing from > 34th Street easterly approximately .8 mile to east of > Martin Luther King Jr. Parkway. One 11' lane each > direction. Traffic will be head-to-head in 11' lanes > and have a continuous left-turn lane. Project > Engineer: Ron DeBok, 515-386-8166, Jefferson. > > U.S. 6 Culvert reconstruction from the intersection of > U.S. 6 and 23rd Avenue in Coralville to the > intersection of 22nd Avenue and U.S. 6. One 12' lane > each direction with head-to-head traffic. Project > Engineer: Newman Abuissa, 319-351-8818, Iowa City. > > U.S. 6 Intersection reconstruction and bridge widening > on Kanesville Boulevard and Broadway in Council Bluffs > from 6th Street to 16th Street Two 11' lanes each > direction. Project Engineer: Ben Behnami, > 712-366-0568, Council Bluffs. > > U.S. 18 Resurfacing from the O'Brien County line > easterly approximately 12 miles to junction U.S. 71 in > Spencer. 1 lane 12'. Project Engineer: Tony Gustafson, > 712-225-5786, Cherokee. > > U.S. 20 Reconstruction on Dodge Street in Dubuque. > One 12' lane each direction. Project Engineer: Cary > T. Lewis, 319-927-2397, Manchester. > > U.S. 30 Grading and paving from approximately 1.5 > miles east of the junction with Iowa 330 easterly > approximately 1,000 feet. Traffic will be head-to-head > in work area. Both eastbound and westbound lanes will > be affected. Project Engineer: Doug McDonald, 515-752-4657, > Marshalltown. > > U.S. 30 Grading and paving in Carroll just west of > Monterey Dr. easterly approximately 2 miles One 11'5" > lane each direction; two-way traffic will be > maintained. Project Engineer: Jerry Arn, 712-263-5628, > Denison. > > Iowa 36 Resurfacing from 1st in Wall Lake northerly > approximately 2.6 miles to junction with U.S. 71/Iowa > 7. One lane 12'. Project Engineer: Tony Gustafson, > 712-225-5786, Cherokee. > > U.S. 52 Patching from 10 miles north of junction with > Iowa 9 northerly 5.8 miles to the Minnesota state line. > 1 lane 12'. One-lane traffic will be controlled by > flaggers and pilot car. Project Engineer: George > Feazell, 319-382-3632, Decorah. > > U.S. 61 Paving from Lee County line northerly > approximately 7 miles to near West Avenue in > Burlington. Minimal disruption of normal traffic flow. > Project. Engineer: Joseph W. Demeter, 319-385-2211. > > U.S. 61 Grading and shoulder widening from Des Moines > County line northerly approximately 8.2 miles to 3/4 > mile north of junction with Iowa 99. One 12'lane each > direction. Minimal inconvenience to traffic: shoulder > widening operation controlled by flaggers. Project > Engineer: Jim Webb, 319-385-2211, Mt. Pleasant. > > U.S. 65 Resurfacing from Story County Road E-41 > (Lincoln Highway at Colo) northerly 20 miles to Story > County Road D-65. Intermittent lane closures of one > lane 12' during daytime hours only. Project Engineer: > Sandra Larson, 515-233-1033, Ames. > > U.S. 67 Pavement replacement from Valley Drive in > Riverdale northeasterly approximately 3 miles to just > east of 249th Avenue in Pleasant Valley. One 10' lane > each direction. Project Engineer: Mark Brandl, > 319-391-2750, Davenport. > > U.S. 67 Pavement replacement in LeClaire just east of > junction with I-80. One 12' lane each direction. > Project Engineer: Mark Brandl, 319-391-2750, Davenport. > > U.S. 67 Bridge replacement over Crow Creek. One 11' > lane each direction. Project Engineer: Mark Brandl, > 319-391-2750, Davenport. > > U.S. 71 Resurfacing from west junction of Iowa 175 > northerly approximately 8 miles to the south junction > with U.S. 20. 1 lane 12'. Project Engineer: Tony > Gustafson, 712-225-5786, Cherokee. > > U.S. 75 Resurfacing from north of the Woodbury County > line (Plymouth County Road C-80) northerly > approximately 16 miles to 18th Street in Le Mars. One > lane 12'5" in southbound lanes. Project Engineer: > Darwin Bishop, 712-239-1367, Sioux City. > > Iowa 99 Pavement widening and resurfacing from north > of Golf Course Road north of Burlington northerly > approximately 10 miles to Kingston. One lane 9' during > work hours. Flaggers and pilot car will maintain > traffic through work zones. Project Engineer: Jim > Webb, 319-385-2211, Mt. Pleasant. > > Iowa 137 Grading from north of Eddyville northerly to > just outside Oskaloosa. One 12' lane each direction. > Construction work will be going on along the side of > the existing roadway. Project Engineer: Ed Kasper, > 515-682-4525, Ottumwa. > > Iowa 141 Culvert construction 0.8 mile west of > junction with U.S. 59 north of Denison. One 12' lane > each direction with minimal disruption to traveling > public. Both shoulders will be restricted during > construction. Project Engineer: Jerry Arn, > 712-263-5628, Denison. > > Iowa 141 Culvert construction and grading from 7.5 > miles west of U.S. 169 east and south approximately > 11.83 miles to west of Granger. One 12' lane each > direction. Traffic will be near normal with only minor > delays. Project Engineer: Roger Gould, 515-782-4518, > Creston. > > Iowa 163 Grading structures on relocated Iowa 163 > from 2 miles northwest of Oskaloosa southerly to Iowa > 137 south of Oskaloosa. One 12' lane each direction. > On-site detour on Iowa 137. Project Engineer: Ed > Kasper, 515-682-4525, Ottumwa. > > U.S. 218 Grading from Henry County line northerly > approximately 7 miles to just north of County Road G-52. > One 12' lane each direction. Minimal inconvenience > to traveling public. Project. Engineer: Joseph W. > Demeter, 319-385-2211, Mt. Pleasant. > > U.S. 218 Paving from approximately 2.5 miles north of > Crawfordsville (Co. Road G-52) northerly approximately > 3.4 miles to 1 mile north of junction with Iowa 92. One > 12' lane each direction; minimal inconvenience to > traveling public. Project Engineer: Joseph W. Demeter, > 319-385-2211. > > U.S. 218 Bridge retrofit on bridge over Big Creek > located 2.5 miles north of Mt. Pleasant. 2 lanes, 16' > lane; traffic controlled with temporary traffic > signals. Lane restriction of 16'. Project Engineer: > Joseph W. Demeter, 319-385-2211. > > Iowa 223 From junction of Iowa 330 easterly > approximately 7 miles to Baxter. Restricted to loads > of 11 tons. > > ROAD CONSTRUCTION - TRAFFIC DETOURED OVER OTHER ROUTES > Provided by the Iowa Department of Transportation - 11/22/96 > > Iowa 1 Reconstruction from the intersection of Burlington > Street and Linn Street to intersection of College and > Governor Street Detour: Northbound: Linn Street to College > Street, College Street to northbound Governor Street. > Southbound: Dodge Street to College Street, College Street > to Linn Street, Linn Street to Burlington Street (Iowa 1). > Project Engineer: Newman Abuissa, 319-351-8818, Iowa City. > > Iowa 3 Reconstruction of Iowa 3 from 8th Street in Waverly > easterly to U.S. 63. Detour: commence at junction of Iowa > 3 and 1st Street NW in Waverly, northerly 1.63 miles on 1st > Street Northwest, Adams Parkway, and Horton Road to north > city limit of Waverly (Co. Road V-14); then northerly on > V-14 to C-33; > then easterly on C-33 to U.S. 63; then southerly > on U.S. 63 to Iowa 3. Project Engineer: Gerald L. Lund, > 319-235-9503, Waterloo. > > Iowa 5/46 Construction of relocated U.S. 65/Iowa 5 > interchange. Detour: Commence at east ramp terminal of > Relocated U.S. 65 and southeast 64th Avenue interchange to > the junction of Iowa 46 and existing Iowa 5 (Southeast 45th > Street). Project Engineer: Mitch Dillavou, 515-262-5692, Des > Moines. > > Iowa 28 Reconstruction from I-235 1.5 miles to junction of > U.S. 6 (Hickman Road). Detour: Commence at junction of > Iowa 28/I-235; then west on I-235 to the junction of > I-35/I-80; > then north on I-35/I-80 to junction of U.S. 6. then east > on U.S. 6 to Iowa 28 (63rd Street). Project Engineer: Cy > Quick, 515-225-2349, Des Moines. > > U.S. 52/Iowa 3 Sanitary sewer reconstruction within city of > Dubuque. Detour: PHASE 1: Elm Street from 11th Street to > 12th Street, 12th Street from Elm Street to White Street; > PHASE 2: 12th Street from White Street to Jackson Street, > Jackson Street from 12th Street to 14th Street, 14th Street > from Jackson Street to White Street. Northbound U.S. > 52/Iowa 3 traffic will use the detour route; southbound U.S. > 52/Iowa 3 will remain on Central Avenue. Project Engineer: > Art Gourley, 319-875-2375, Dyersville. > > U.S. 71 Grading and paving from junction of U.S. 71 and > Iowa 7 South of Storm Lake northerly and westerly 3 miles to > intersection of U.S. 71 and unnamed Buena Vista county road. > Detour: STAGE 1: Commence at the south junction of U.S. > 71/Iowa 7/Buena Vista County C-6; then westerly on C-65 to > the intersection of C-65 and unmarked county road; then > northerly to intersection with U.S. 71/Iowa 7. This portion > of the detour will continue after state 2 is completed. > STAGE 2: Commence at the intersection of U.S. 71 and Buena > Vista County M-44; then northwesterly on M-44 to the > intersection of M44 and Iowa 3. Project Engineer: Tony > Gustafson, 712-225-5786, Cherokee. > > Iowa 92 Reconstruction of Iowa 92 between Winterset and > I-35. Detour: Commence at north junction of U.S. 169/Iowa > 92; then northerly on U.S. 169 to I-80; then easterly in > I-80 approximately 13 miles to I-80/I-35 interchange; then > southerly on I-35 to Iowa 92 interchange. Project Engineer: > Roger Gould, 515-782-4518, Creston. > > Iowa 149 Reconstruction from west junction of Iowa 22 at > Webster to the east junction at South English. Detour: > Commence at junction of Iowa 22 (Washington Street) and Main > Street in Webster; then south on Main Street to the junction > of Iowa 149; then southerly on Iowa 149 to Iowa 92; then > easterly on Iowa 92 to V-67; then northerly on V-67 to > junction of Main Street in Harper; then northeast on Main > Street to Hutchinson Street; then north on Hutchinson Street > to Yerger Street; then east on Yerger Street to the ECL of > Harper (V-67); then east on V-67 to junction of G-32; then > north on V-67 to junction of Iowa 22; then west on Iowa 22 > to junction of Iowa 149. Project Engineer: Charles E. > Belgarde, 515-472-6142, Fairfiel Just atest --------------6F3D78F3176 Content-Type: image/jpeg Content-Transfer-Encoding: base64 Content-Disposition: inline; filename="decath1.jpg" <encoded_portion_removed> 1EBPJEokEg5Yll/2Y8oLuh+yMrASSoMBBJIWyh9IJV5d4GV8I8onmh4JBChQo6GT/9k= --------------6F3D78F3176--
Technical Details
Message-ID:
<329880C0.1385@netexpress.net>Path:
arc1-ca.pugleaf.net!unknown!not-for-mailReferences:
<961122115656.24562@news.iastate.edu>Show Full Headers
Complete Article Headers
X-Google-Language: ENGLISH,ASCII-7-bit X-Google-Thread: 10f385,7fbeff3705ce5865 X-Google-Attributes: gid10f385,public From: LEDERMAN <LEDERMAN@netexpress.net> Subject: Re: Iowa DOT Road Construction Report - 11/22/96 Date: 1996/11/24 Message-ID: <329880C0.1385@netexpress.net> X-Deja-AN: 198438356 references: <961122115656.24562@news.iastate.edu> content-type: multipart/mixed; boundary="------------6F3D78F3176" mime-version: 1.0 newsgroups: ia.dot.road-work x-mailer: Mozilla 2.01 (Win95; U)